Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-Finance | ₹4.7 Cr | L1 | Accepted-Finance Quoted Low |
| 2 | L2₹4.7 CrAccepted-Finance | ₹4.7 Cr | L2 | Accepted-Finance Quoted High |
Tender Value
₹4.9 Cr
EMD Value
₹4.9 L
Closing Date
12 Sept 2023, 4:30 pmClosed
Executive Engineer
Office of the Executive Engineer, tali division, PWD, Ziro Camp
C/o Road from Niobia to Zara village under Pipsorang Circle, Kra Daadi District (L-9.00 Km) (PH-I).
2023_PWDAP_1381_1
TD/W-12/RIDF-XXIX/2023-2024/02
Open Tender
Civil Works – Roads
Item Rate
365 days
Pipsorang
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE PWD Tali Division
₹4.9 L
22 Sept 2023
29 Aug 2023
13 Sept 2023
29 Aug 2023
12 Sept 2023
29 Aug 2023
Amount
SH : FORMATION CUTTING Excavation in Soil by Manual Means.
Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
Excavation in Ordinary Rock by Manual Means
Excavation in Hilly Area in Ordinary Rock by Manual Means (Excavation in Ordinary Rock using Manual Means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.)
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)
SH:- CROSS DRAINAGE a) RCC S/ Culvert 2.00 m Span - 2.00 Ht)-4 Nos
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
SH: Side Katcha Drain L=7.82 Km)
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and leads upto 1000 meters.)
Excavation in ordinary rock by Manual Means. (Excavation for roadway in ordinary rock using manual means including loading in truck for carrying of excavated material to embankment site with all lifts and leads upto 1000 meters.)
M/S TAGRU CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].