| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 CrAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹11.1 Cr+₹16.6 L (1.52%)Rejected-Finance NA | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.2 Cr+₹31.7 L (2.91%)Rejected-Finance 2ND FLOOR 15 BHULLAR AVENUE ADJOINING SBI FATEHGARH CHURIAN ROAD AMRITSAR PUNJAB 143001 | AMRITSAR | AMRITSAR | PUNJAB | 143001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹11.3 Cr+₹33.5 L (3.07%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹11.9 Cr+₹96.7 L (8.86%)Rejected-Finance 12 B NIKKA SINGH COLONY RAM TIRATH ROAD AMRITSAR PUNJAB | L5 | Rejected-Finance L5 |
Tender Value
₹13.3 Cr
EMD Value
₹26.6 L
Closing Date
23 Dec 2025, 1:00 pmClosed
Executive Engineer
National Highway Division PWD Br Amritsar
UPGRADATION OF OLD AMRITSAR TARN TARAN ROAD MDR 103 N RD 110 25 TO 114 200 AND RD 0 TO 0 700 TOWARDS SULTANWIND BYPASS SIDE OF ROB A 12 IN DISTRICT AMRITSAR
2025_CEPW_154185_1
10
Open Tender
Civil Works
Percentage
Amritsar
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹26.6 L
Amritsar
6 Mar 2026
24 Nov 2025
24 Dec 2025
24 Nov 2025
23 Dec 2025
24 Nov 2025
9 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying the existing Bituminous road surface to a depth of 50mm and disposal of scarified material with in all lifts and lead upto 1000 meters | 74,455.78 | Sqm | 5 | ₹3,72,278.9 |
| 2 | Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of MORT&H specifications | 2,781.95 | Cum | 292 | ₹8,12,329.4 |
| 3 | Construction of embankment with earth obtained from roadway cutting or excavation including spreading, grading to required slope and compacting to meet requirement of table 300-2 as per technical clause 305 of MORT&H specifications | 1,330 | Cum | 94 | ₹1,25,020 |
| 4 | Construction of granular sub-base by providing material as per grading-III ( Table 400-I of MORT&H 5th revision), mixing in a mechanical mix plant at OMC, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per technical clause 401 of MORT&H specifications (Labour Rate Only) | 570 | Cum | 189.08 | ₹1,07,775.6 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per technical clause 406 of MORT&H specifications | 3,240 | Cum | 2,111.59 | ₹68,41,551.6 |
| 6 | Providing and applying primer coat with bitumen emulsion SS on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 of MORT&H specifications | 12,960 | Sqm | 33.37 | ₹4,32,475.2 |
| 7 | Providing and applying tack coat with penetration grade bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical specifications | 51,281.48 | Sqm | 11.02 | ₹5,65,121.91 |
| 8 | Providing and laying dense graded bituminous macadam 50mm to 75mm thick with batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.5%, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 505 of MORT&H specifications.
TECHNICAL NOTE:-
i.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for bituminous concrete shall meet all requirements set forth clause 507 of MORT&H specifications.
ii.) The final grading for the aggregates required for bituminous concrete confirming to table 500.17 of MORT&H specifications shall be determined after getting the bituminous concrete designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).
iii.) The approved mix shall exhibit the following details, source and location of all material:-
(a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix.
(e) A single definite percentage passing each sieve for mixed aggregates
(f) Density of bituminous concrete after compaction will be not less than 2.35 gm/CC. | 3,589.7 | Cum | 9,483.36 | ₹3,40,42,417.39 |
| 9 | Providing and applying tack coat with penetration grade bitumen VG-10 using bitumen pressure distributor at the rate of 0.40 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical specifications | 1,01,742.63 | Sqm | 11.02 | ₹11,21,203.78 |
| 10 | Providing and laying bituminous concrete 30mm to 45mm thick with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.4%, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications
TECHNICAL NOTE:-
i.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for bituminous concrete shall meet all requirements set forth clause 507 of MORT&H specifications.
ii.) The final grading for the aggregates required for bituminous concrete confirming to table 500.17 of MORT&H specifications shall be determined after getting the bituminous concrete designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).
iii.) The approved mix shall exhibit the following details, source and location of all material:-
(a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix.
(e) A single definite percentage passing each sieve for mixed aggregates
(f) Density of bituminous concrete after compaction will be not less than 2.35 gm/CC. | 4,064.86 | Cum | 10,893.69 | ₹4,42,81,324.73 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.44 MB
DNIT.pdf
Tender Documents • 17.43 MB
BOQ_312437.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .