Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.1 L+₹77,832 (17.9%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹5.7 L+₹1.3 L (30.3%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SUJEET KUMAR SINGH CONTRACTOR L2 | Vijay bahadur Rai L3 | shiva Telecom Services L1 |
|---|---|---|---|---|---|---|
| 1.00 | Sweeping and cleaning of common area/ paved/ unpaved area etc. in front and back of buildings/ residential quarters , staircase, roads, pathways and parking including disposal of garbage and other refuges/ rubbish collected from sweepingas well as dustbin of residential campus to dumping site in township by rickshaw trolley etc all complete and as per the direction of the Engineer-In-Charge. (Area to be cleaned alternate day in all working days and as and when required, shall be about 89612 sq.m. per month with provision of rational deduction for not attending/ unsatisfactry the item while measuring for payment.) | 12 | One month | 14,800 ₹1,77,600 | 6,500 ₹78,000 Lowest | 13,300 ₹1,59,600 |
| 2.00Cleaning available floor area and toilets of Offices /Technical/ Administrative building as per direction of the Engineer-In-Charge for- | ||||||
| 2.01 | Proper and efficient cleaning & sweeping of the floors, staircase,corridors,lobby's and other space including disposal ofgarbage and other refuges cobweb from ceiling and walls and disposal of garbage and other refuges/ rubbish to dumping site in township to the satisfaction of the Engineer-In-Charge. It includes the cost of all labour T&P etc. all complete. (Area to be cleaned daily in all working days and as and when required, shall be about 53942 sq.m. per month with provision of rational deduction for not attending/unsatishfactory execution of the item while measuring qty for payment) | 12 | One month | 13,700 ₹1,64,400 | 12,500 ₹1,50,000 | 11,500 ₹1,38,000 Lowest |
| 2.02 | Wet mopping of all types of flooring / tiles including cleaning of all kinds of spot like tea, spitting on walls etc. all complete except cement concrete flooring with detergent powder or other approved floor cleaner before scheduled office opening time. It includes the cost of all labour T&P etc. all complete and as per direction of Engineer-in-charge.(Area to be cleaned alternate day in working days and as and when required, shall be about 25767 sq.m. per month with provision of rational deduction for not attending/unsatisfactory execution of the item while measuring qty. for payment) | 12 | One month | 8,500 ₹1,02,000 | 12,500 ₹1,50,000 | 7,500 ₹90,000 Lowest |
| 2.03 | Proper and efficient cleaning and washing of the toilets, wash basins, urinals, W/C Seats, looking mirrors, sanitary fittings and fixtures etc. using approved toilet cleaner like Vim / Liquid soap/ Phenyle/ Sanifresh/ Harpic etc.including the cost of providing and filling liquid soap in soap containers, nepthelene balls, urinal cubes in wash basins / urinals (weekly or when empty, whichever is earlier) and cleaning of wall tiles/dado weekly etc. all complete as per the direction of the Engineer-in-charge. It includes the cost of all labour T&P etc. all complete.(Area to be cleaned alternate day and as and when required, shall be about 817 sq.m. per month with provision of rational deduction for not attending/ unsatisfactory execution of the item while measuring qty. for payment) | 12 | One month | 3,000 ₹36,000 | 12,500 ₹1,50,000 | 1,999 ₹23,988 Lowest |
| 2.04 | Sweeping and Cleaning of open drain inside the compound wall complete and removal of garbage or other refuges, rubbish i/c disposal of malba to Municipal dumping ground outside compound all complete as per direction of Engineer-in-charge.(The drain to be cleaned once in three months and as and when required ,shall be about 195 m.(quarterly) with provision of rational deduction for not attending/unsatisfactory execution of the item while measuring for payment.) | 4 | Each job | 600 ₹2,400 | 1,000 ₹4,000 | 210 ₹840 Lowest |
| 3.00 | Removing chokage of Manholes and its conneceting sewer lines, gully traps, WC,Bath & kitchen traps inside quarters as and when required i/c disposal of malba to Municipal dumping ground outside compound all complete as per direction of Engineer-in-charge. (1/2 day will be measured as one job) | 25 | Half days | 400 ₹10,000 | 450 ₹11,250 | 310 ₹7,750 Lowest |
| 4.00 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 2,805 | One square metre | 7 ₹19,635 | 8 ₹22,440 | 5 ₹14,025 Lowest |
Tender Value
₹5.5 L
EMD Value
₹11,015
Closing Date
15 Oct 2025, 6:00 pmClosed
NODAL OFFICER (TENDER)
O/o Chief Engineer (Civil)-II, BSNL UP(E) Civil Zone, 5th Floor, Door Sanchar Sadan, LaPlace, Shahnazaf Road, Hazratganj, Lucknow-226001
Rendering sanitation of BSNL Buildings and Compounds at Bhujauti, Sahadatpura and Bhiti, OA- Mau (FY 2025-26).
2025_BSNL_251443_1
53/2025-26/BSNL/CE-II/LKO
Open Tender
Civil Works
Item Rate
365 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Accounts Officer (Cash), BSNL O/o GMTD, Gorakhpur
₹11,015
Yes
18 Oct 2025
8 Oct 2025
17 Oct 2025
8 Oct 2025
15 Oct 2025
8 Oct 2025
8 Oct 2025 - 15 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .