| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.0 LRejected-Finance 162 AMRANGA AMRANGA BARIHAT KAMRUP ASSAM 781125 UDYAM AS 16 0021223 | KAMRUP | ASSAM | 781125 | ₹4.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹4.0 LRejected-Finance BAUNIA NAZAT NORTH 24 PGS | HOOGHLY | WEST BENGAL | 712101 | ₹4.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹4.0 L
EMD Value
₹8,000
Closing Date
16 Feb 2026, 2:00 pmClosed
EE(C)/BR-XV
The Executive Engineer ( C ), Borough - XV, Kolkata Municipal Corporation, E/3, Circular Garden Reach Road Kolkata-700024
EMERGENCY / ESSENTIAL WORK FOR REPAIRING OF POT HOLES ETC./ PETTY ROAD REPAIRING WORK IN WARD NO-133 UNDER BR-XV
2026_KMC_1001136_1
KMC/EE(C)/Br-XV/133/096/ 2025-2026/R
Open Tender
CIVIL WORKS
365 days
IN WARD NO-133 UNDER BR-XV
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8,000
24 Mar 2026
7 Feb 2026
18 Feb 2026
7 Feb 2026
16 Feb 2026
7 Feb 2026
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath.
ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion
Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete
BUILDING WORKS (D) FLOORING A. ORIGINAL WORKS 48. SUPPLYING & LAYING AS PER IRC-SP:063-2004 PAVER UNIT OF ANY SHADE OF APPROVED QUALITY AS PER RELEVANT IS CODE, LAID IN PATTERN AS DIRECTED IN PAVEMENT, FOOTPATH, DRIVEWAY (PAVER BLOCK ONLY), ETC INCLUDING NECESSARY UNDERLAY COMPLETE IN ALL RESPECT WITH ALL LABOUR AND MATERIAL. [BORDER CONCRETE IF NECESSARY TO BE PAID SEPARATELY]. NOTE: SUB-GRADE CBR SHOULD NOT BE LESS THAN 5. (B) 50 MM THICK INTERLOCKING DESIGNER CONCRETE PAVER BLOCK M- 30 GRADE FOR NON-TRAFFIC ZONE,BUIDING PREMISES,GARDEN,PARKS,DOMESTIC DRIVE AS PER IS: 15658- 2006(OVER 20-30 MM MEDIUM SAND BED ON 200MM THK BOUND GNAULAR /GRANULAR BASE COURSE INCLUDING COST OF SAND FOR SAND BED BUT EXCLUDING COST OF BASE COURSE & SUBGRADE PREPARATION.) (II) COLOURED DECORATIVE
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
Estimated amount
Add: 9%SGST
Add: 9%CGST
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
TENDERFORM133096.pdf
Tender Documents • 0.57 MB
BOQ_2453117.xls
BOQ • 0.30 MB
ROAD_new.pdf
Additional Documents • 2.42 MB
Download all tender documents and submit your bid