Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Fee/PreQual/Technical/Finance | -17.21% | ₹1.4 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.5 Cr+₹3.4 L (2.38%)Admitted-Fee/PreQual/Technical/Finance | -15.24% | ₹1.5 Cr+₹3.4 L (2.38%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.5 Cr+₹12.2 L (8.58%)Admitted-Fee/PreQual/Technical/Finance | -10.11% | ₹1.5 Cr+₹12.2 L (8.58%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.6 Cr+₹14.2 L (9.93%)Admitted-Fee/PreQual/Technical/Finance | -8.99% | ₹1.6 Cr+₹14.2 L (9.93%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
12 Aug 2026, 2:00 pmClosed
COMMISSIONER MUNICIPAL CORPORATION PALI
COMMISSIONER MUNICIPAL CORPORATION PALI
Construction of Dog Shelter at Pali
2026_DLB_580353_1
Civil_08_1
Open Tender
Civil Works
Percentage
365 days
PALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
COMMISSIONER MUNICIPAL CORPORATION PALI
₹3.5 L
Yes
12 Aug 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
12 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation/trenches in all soil, depth up to 1.5 m, incl. dressing, ramming, refilling & disposal up to 50 m lead | 261.37 | cum | 229.5 | ₹59,984.42 |
| 2 | Earth filling in plinth with surplus excavated soil in 20 cm layers incl. ramming & watering | 224 | cum | 159 | ₹35,616 |
| 3 | Filling with river sand under floors incl. watering, ramming, consolidating (100 mm) | 64 | cum | 1,013 | ₹64,832 |
| 4 | Anti-termite treatment of soil under floor with chemical emulsion @ 1 l/hole, 300 mm c/c | 640 | sqm | 196 | ₹1,25,440 |
| 5 | Cement concrete 1:4:8 (40 mm) up to plinth — levelling course under footings & sub-base under floor | 75.23 | cum | 4,575 | ₹3,44,177.25 |
| 6 | Brick work FPS (class 75) in foundation & plinth in cement mortar 1:6 — stepped footings & plinth wall | 114.35 | cum | 5,400 | ₹6,17,490 |
| 7 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 75 | cum | 4,860 | ₹3,64,500 |
| 8 | Damp-proof course 75 mm M-15 with water-proofing compound over all walls at plinth | 65 | sqm | 648 | ₹42,120 |
| 9 | Plinth protection 50 mm CC 1:3:6 over brick-ballast bed, 0.9 m wide apron | 99.3 | sqm | 503 | ₹49,947.9 |
| 10 | RCC 1:1½:3 up to plinth — plinth beams (excl. shuttering & reinforcement) | 16.7 | cum | 6,340 | ₹1,05,878 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_1031763.xls
BOQ • 0.44 MB
Corr08.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .