Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | ₹1.1 Cr | 1 | Accepted-AOC 1st Lowest |
| 2 | 2₹1.2 Cr+₹2.6 L (2.22%)Rejected-Finance | ₹1.2 Cr+₹2.6 L (2.22%) | 2 | Rejected-Finance 2ND LOWEST |
| 3 | 3₹1.2 Cr+₹6.1 L (5.34%)Rejected-Finance | ₹1.2 Cr+₹6.1 L (5.34%) | 3 | Rejected-Finance 3RD LOWEST |
| 4 | 4₹1.2 Cr+₹9.2 L (8.00%)Rejected-Finance N A | PALWAL | HARYANA | 121004 | ₹1.2 Cr+₹9.2 L (8.00%) | 4 | Rejected-Finance 4TH LOWEST |
| 5 | 5₹1.2 Cr+₹9.3 L (8.09%)Rejected-Finance | ₹1.2 Cr+₹9.3 L (8.09%) | 5 | Rejected-Finance 5TH LOWEST |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
30 Sept 2024, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH
Construction of Boundary wall for protection of Irrigation Department Land under Irrigation Division Lucknow situated at Mohammadpur Parethiya, Rendua Palhari.
2024_UPIDC_958313_2
05/SE-XII/2024-25
Open Tender
Civil Works
Fixed-rate
180 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,300
₹2.7 L
28 Dec 2024
23 Sept 2024
30 Sept 2024
23 Sept 2024
30 Sept 2024
23 Sept 2024
Amount
Cleaning thick jungle and thorney bushes without uprooting.
Excavation of earthwork for making pile bore of 300mm Dia and 1.5 mt depth including all labour T&P etc complete in all respect as per direction of Engineer in Charge.
Centering and shuttering for RCC work including all cost of materials Labour T&P etc complete for proper completion of work .
Laying Reinforcement Cement Concrete (1:1.5:3) with coarse sand and crushed aggregate including all cost of materials, labour and T&P etc.
Supplying and fixing and concealing of 20mm Dia 2mm thick PVC conduit pipe with ISI mark Embossed and with PVC accessories confirming to IS no. 3419 for drawing wires duly sealed at joints with original resin / adhesive to make the complete piping Rigid plastering with cement and mortar finish to level with the matching colour wash including cost of all material labour and T&P etc required for proper completion of work as per direction and to satisfaction of Engineer in Charge.
First class brick work in 1:4 cement and coarse sand mortar up to 3M lift and 60M lead of materials with including all cost of materials, scafolding, labour and T&P etc.
12mm thick cement plaster over brick work 1:6 (cement :coarse sand) including all cost of materials Labours and T&P etc complete for proper completion of work.
Laying , cutting , bending and binding with binding wire excluding shuttering and centering, but including all materials, labour and T&P etc.
Finishing wall with premium acrylic smooth exterior paint with silicon additives of required shade new work (two or more coats applied @1.43 ltr /per10 sqm including priming coat of exterior primer applied @2.20kg/10sqm)(apex ultima weather coat all guard) Asian Berger , including supply of material Labour T&P etc Required for proper completion of the work.
Providing Barbed Iron wire fencing including fixing to post after stretching it including cost of material labour T&P etc Required for proper completion of work.
Providing and fixing Angle Iron post 50x50x6 mm placed every 3.0 mt C/C in Depth of 0.45 mt and every corner end and every 15th post shall be strutted on both side including cutting drilling holes revetting/welding as necessary with one coat of red oxide primer and its carriage upto site including cost of all material labour T&P etc required for proper completion of work.
Providing annd fixing of steel gate of specified shape size and design welded in built up section/framed work including cutting hoisting fixing in position and and applying a coat primer of approved quality steel primer using structural steel etc complete all as specified and directed.
Painting two coat of synthetic enamel paint on new surface wih superior quality approved make as luxol 3 hi glass apcolite superlac Deluxe specified brushing to give an even shade and including cleaning the surface of all dirt dust and other foreign matter sand preparing and stopping excluding cost of all material but including cost of labour T&P etc required for for proper completion of work.
Earth work in excavation for making subgrade and prepared surface for base including lead upto 30mt and lift upto 1.5 mt excluding mechanical compaction but including manual compaction and dressing to profile all as specified and directed.
Making subgrade in soling work including watering,compaction and preparation of surface all as directed and specified.
Laying brick soling layer on prepared sub grade with brick on end edging according to lines graded and cross section shown on the drawing filling joints with sand and earth spreading 25 mm thick layer of earth over brick soling watering and rolling the same with three wheel road roller 80-100 KN as per technical specification clause 412.
DHARAM DEV CHAUHAN
M/S SIYA RAM YADAV
M/S MAHAJAN CONSTRUCTION AND SUPPLIER
PRADEEP KUMAR SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .