Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC LAXMI MARKET JAYANT P O JAYANT DIST SINGRAULI MP | JAYANT | SINGRAULI | MADHYA PRADESH | 486884 | ₹3.6 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹4.4 LRejected-Finance | ₹4.4 L | L2 | Rejected-Finance L2 bidder |
| Sl No | Description | Qty | Unit | SHREYA ELECTRICAL L2 | JANTA ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.01 | Supply and installation of new hermetically sealed compatible compressor for 1.5 Ton Window/Split-type Air Conditioner as a replacement | 5 | Nos. | 5,800 ₹29,000 | 4,800 ₹24,000 |
| 1.02 | Refilling of freon gas (R22/ R32/ R134A/ R410A or equivalent) for replacement | 90 | kg. | 905 ₹81,450 | 900 ₹81,000 |
| 1.03 | Supply of starting capacitor 80 to 100 MFD for replacement | 15 | Nos. | 203 ₹3,045 | 150 ₹2,250 |
| 1.04 | Supply of running capacitor 25 to 36 MFD for replacement | 5 | Nos. | 200 ₹1,000 | 200 ₹1,000 |
| 1.05 | Supply of running capacitor 45 to 50 MFD for replacement | 15 | Nos. | 190 ₹2,850 | 200 ₹3,000 |
| 1.06 | Supply of starting capacitor 60 to 80 MFD for replacement | 8 | Nos. | 200 ₹1,600 | 150 ₹1,200 |
| 1.07 | Supply of starting capacitor 10 to 25 MFD for replacement | 8 | Nos. | 100 ₹800 | 150 ₹1,200 |
| 1.08 | Supply of fan/ blower motor condenser 4 to 6 MFD for replacement | 15 | Nos | 65 ₹975 | 50 ₹750 |
| 1.09 | Supply of starting relay for AC and water cooler for replacement | 10 | Nos. | 350 ₹3,500 | 150 ₹1,500 |
| 1.10 | Supply of steel water tape for water cooler for replacement | 5 | Nos. | 150 ₹750 | 150 ₹750 |
Updated dates
Tender Value
₹5.4 L
EMD Value
₹6,700
Closing Date
30 Mar 2026, 6:55 pmClosed
SO(ENM), Jhingurda Project
SO(ENM) Office, Jhingurda Project
Servicing and Maintenance Contract of Air Conditioners, Water Coolers and Refrigeration Units for 210 Days at Jhingurda Project
2026_NCL_356728_1
NCL/JRD/ENM/Tender/25-26/53
Open Tender
Electrical and Maintenance Works
210 days
Jhingurda Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,700
8 Jun 2026
16 Mar 2026
31 Mar 2026
16 Mar 2026
30 Mar 2026
16 Mar 2026
16 Mar 2026 - 23 Mar 2026
Supply and installation of new hermetically sealed compatible compressor for 1.5 Ton Window/Split-type Air Conditioner as a replacement
Refilling of freon gas (R22/ R32/ R134A/ R410A or equivalent) for replacement
Supply of starting capacitor 80 to 100 MFD for replacement
Supply of running capacitor 25 to 36 MFD for replacement
Supply of running capacitor 45 to 50 MFD for replacement
Supply of starting capacitor 60 to 80 MFD for replacement
Supply of starting capacitor 10 to 25 MFD for replacement
Supply of fan/ blower motor condenser 4 to 6 MFD for replacement
Supply of starting relay for AC and water cooler for replacement
Supply of steel water tape for water cooler for replacement
Supply of float valve with complete set for water cooler for replacement
Supply and installation of new compatible compressor for 40 Ltr./ 80 Ltr. water cooler (standard make) as a replacement
Supply of overload relay for replacement
Repairing/ rewinding of fan motor of ACs, water coolers and refrigeration units
Supply of fan blade for ACs, water coolers and refrigeration units for replacement
Supply of thermostat for ACs, water coolers and refrigeration units for replacement
Supply of fan motor with blade & stand for water coolers for replacement
Supply of AC remote panel assembly with remote for replacement
Supply of 15 Amp. Top/Socket
Supply of 5 Amp. Top/Socket
Supply of PVC Tape
Supply of Inverter AC 5 star indoor unit kit (Standard make)
Supply of Inverter AC 5 star outdoor unit kit (Standard make)
Electrical cable (4 Core) for Acs
Supply and fixing of Copper Pipe 5/8 inch Dia. with insulation cover
Supply and fixing of Copper Pipe 1/2 inch Dia. with insulation cover
Shifting, installation, commissioning of 1.5T/ 2.0T Window/ Split-type AC as and when required as per the instruction of EIC
Day to day complete servicing/maintenance of 92 Nos. window/ split-type AC (1.5T/2T), 10 Nos. water coolers (40Ltr./ 80Ltr.) and 08 Nos. refrigeration units including removal of dust of indoor and outdoor units with jet water spray and attending running emergency breakdowns as and when required as per the instruction of EIC with the help of one skilled technician & one helper on daily basis), i.e. (Rs.805 + Rs.541 = Rs.1346) per day
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_369590.xls
BOQ • 0.31 MB
Annexure1.pdf
Tender Documents • 0.53 MB
LOB.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid