Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹86,353.87Admitted-Finance | -11.00% | ₹86,353.87 | L1 | Admitted-Finance |
| 2 | L2₹89,274.38Admitted-Finance | -7.99% | ₹89,274.38 | L2 | Admitted-Finance |
| 3 | L3₹95,183.31Admitted-Finance | -1.90% | ₹95,183.31 | L3 | Admitted-Finance |
Tender Value
₹97,000
EMD Value
₹1,940
Closing Date
5 May 2026, 6:00 pmClosed
Er. Fayaz Ahmed Sheikh
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_308883_1
NIT No 04 OF REW RAMBAN OF 2026 2027 UNDER HEAD CDF BLOCK BANIHAL
Open Tender
Civil Works
30 days
Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹1,940
7 May 2026
28 Apr 2026
6 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soils | - | cum | 479.3 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% boulders. | - | cum | 5,733.6 | - |
| 3 | Providing and laying in position boulders in concrete including cost of stones and carriage all complete | - | cum | 758 | - |
| 4 | Providing and laying in position Reinforced cement concrete in Suspended floors, roofs, stair cases, lintels, chajjas, balconies etc. all work upto floor V level of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 9,821.85 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundations ,footings bases of column | - | sqm | 286.35 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies etc | - | sqm | 718.2 | - |
| 7 | Steel Reinforcement for RCC work including cutting, bending, binding and placing in position all complete (TMT bars of Fe500 Grade) | 1 | kgs | 123.2 | ₹123.08 |
| 8 | Brickworkwith common burnt clay bricks of class designation 75 in cement moratr 1:6 (1 cement: 6 coarse sand) in foundation and plinth | - | cum | 7,571.55 | - |
| 9 | Extra for brick masonary above plinth level in superstructure upto floor V level | - | cum | 1,455.65 | - |
| 10 | 15mm thick cement plaster of mix 1:6 (1 cement: 6 fine sand) | 1 | sqm | 306.85 | ₹306.54 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.41 MB
BOQ_1000493.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid