| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 CrAccepted-AOC CHANDAULI | UTTAR PRADESH | 221009 | ₹12.8 Cr | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | Not Admitted-Finance 142 | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹34.3 L
Closing Date
26 Jun 2024, 11:00 amClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Resoration of Main Western Gandak canal internal Damage Lining left slope and right slope from 110.440 to KM. 111.830 and from 118.426 to KM. 118.776 in District Kushinagar
2024_UPIDC_912947_18
06/SE/2023-24
Open Tender
Civil Works
450 days
TAMKUHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹34.3 L
Yes
6 Nov 2024
20 Jun 2024
26 Jun 2024
20 Jun 2024
26 Jun 2024
20 Jun 2024
Amount
Dismantling of Existing Double Brick Lining and its proper disposal within an initial lead of 60m with cost of labour,T&P for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work in filling to Recoup of the Canal Section including cost of materials,T&P and labours and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work for making Ramp for working in canal every 500 meters at Right side including cost of material,labour,T&P and other accessories required for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Earth work excavation in foundation for toe wall,top/cut off wall and for sleepers including digging and refilling the trenches with its proper disposal within 30 meter lead & all lift with cost of labour and T&P for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete in 1:4:8 in base of Toe wall with Coarse sand having F.M. not less than 2.5,Old dismantled brick ballast of nominal size of 20 mm to 40 mm, placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete in M15 in Sleepers and Top/Cut off wall with Coarse sand having F.M. > 2.0,Crushed stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete in M20 in Toe wall with Coarse sand having F.M. > 2.0,Crushed stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Plain Cement Concrete in M20 in Lining with Coarse sand having F.M. > 2.0,Crushed stone Aggregate of nominal size of 12.5 mm to 20 mm, Mechanically mixed,placed in position and properly compacted including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Supplying and laying Coarse Sand below Stone Grit with proper compaction and rolling including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Supplying and laying Stone Grit below Cement concrete lining with proper compaction and rolling including cost of all material,labour and T&P with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Providing and laying LDPE Sheet on slope, below Toe wall and cutt off Wall including cost of all materials,labour,with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Centering and Shuttering of C.C. work including cost of all material, labour,and T&P with all lead and up lift/down lift for proper completion of work as directed by Engineer-in-Charge as per I.D. specification.
Supply and fixing Pressure Relief Valve including cost of all materials,labour,with all lead and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Providing and fixing sealing compound in between panel joints including cost of all materials,labour and T&P with all leads and lift for proper completion of work as per direction of the Engineer in charge as per drawing and I.D. Specification.
Supplying and laying of Water stopper for water resistance at transverse sleepers including cost of all materials, labour and T&P etc proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Supplying and laying 25 mm dia CPVC pipe in sleeper including materials, labour and T&P with all leads and lift/down for proper completion of work as directed by Engineer-in-Charge as per drawing and I.D. specification.
Running of 5 H.P. generator set Pump for Dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of material,labour and T&P etc. required for complete work as directed by engineer-in-charge as per I.D. specification.
Brick on edge soling with old dismantled lining brick/tile including preparation of sub-grade to prescribed camber, filling joint with local sand/earth including all cost of materials, T&P and labours and other accessories required for proper completion of work as directed by engineer-in-charge as per I.D. specification.(Reuse of brick ballast from dismantling of existing lining)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid