| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.8 CrAccepted-Finance GONDA | UTTAR PRADESH | 271305 | ₹1.8 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹2.0 Cr+₹21.9 L (12.1%)Rejected-Finance 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | ₹2.0 Cr+₹21.9 L (12.1%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.2 Cr+₹39.9 L (22.1%)Rejected-Finance | ₹2.2 Cr+₹39.9 L (22.1%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹2.4 Cr+₹60.2 L (33.4%)Rejected-Finance VILLAGE BASIA POST SAHJANWAN THANA SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH PIN 273209 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273209 | ₹2.4 Cr+₹60.2 L (33.4%) | L-4 | Rejected-Finance L-4 |
| 5 | Not Admitted-Fee/PreQual/Technical 106 GREEN AVANUE NAGAR AJMER ROAD GAJSINGHPURA JAIPUR RAJASTHAN 302021 | JAIPUR | RAJASTHAN | 302021 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S Damyanti Singh L4 | M/S MEERA CONSTRUCTION L3 | M/ S A P SHUKLA AND COMPANY L1 | AKANKSHA ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION PRESSURE WELL | |||||||
| 1.01 | Earth work excavation of foundation for construction of well and laying pipes in all types of soils excluding mechanical compaction but inclusive of manual compaction and its proper disposal & back filling with dressing to profile including all lead and lift, labour, T&P etc.as per direction of Engineeer-in-Charge. | 49,144.12 | CUM | 101 ₹49,63,556.12 | 85 ₹41,77,250.2 | 40 ₹19,65,764.8 Lowest | 75 ₹36,85,809 |
| 1.02 | E/W in filling dry earth including lead upto 30m and lift 1.5 m excluding mechanical compaction but inclusive of manual compaction and dressing to profiles including all cost of labour,t&p etc as per direction of Engineeer-in-Charge. | 12,422.61 | CUM | 95 ₹11,80,147.95 | 90 ₹11,18,034.9 | 40 ₹4,96,904.4 Lowest | 70 ₹8,69,582.7 |
| 1.03 | Centering & Shuttering for P.C.C work in different parts of structures required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc.as per direction of Engineeer-in-Charge. | 279.24 | SQM | 190 ₹53,055.6 | 200 ₹55,848 | 100 ₹27,924 Lowest | 200 ₹55,848 |
| 1.04 | Centering & Shuttering for R.C.C work in different parts of structures required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc.as per direction of Engineeer-in-Charge. | 4,152.9 | SQM | 750 ₹31,14,675 | 500 ₹20,76,450 | 100 ₹4,15,290 Lowest | 350 ₹14,53,515 |
| 1.05 | Laying C.C- A 40 M10 in foundation of all structures with Cement O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T&P labour etc.as per direction of Engineeer-in-Charge. | 82.29 | CUM | 10,000 ₹8,22,900 | 9,500 ₹7,81,755 Lowest | 12,600 ₹10,36,854 | 11,000 ₹9,05,190 |
| 1.06 | Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire required for proper completion of work including cost of all material, labour T&P etc.as per direction of Engineeer-in-Charge. | 58.71 | MT | 60,000 ₹35,22,600 Lowest | 65,000 ₹38,16,150 | 65,000 ₹38,16,150 | 70,000 ₹41,09,700 |
| 1.07 | Laying R.C.C, A-20, M-20 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.as per direction of Engineeer-in-Charge. | 580.83 | CUM | 11,740 ₹68,18,944.2 | 11,000 ₹63,89,130 Lowest | 12,800 ₹74,34,624 | 11,000 ₹63,89,130 Lowest |
| 1.08 | Supplying & Fixing 200mm dia HDPE pipe PE-100: 6Kg/sq.cm required for proper completion of work including cost of all material, labour and T&P etc.as per direction of Engineeer-in-Charge. | 540 | RM | 1,150 ₹6,21,000 | 1,000 ₹5,40,000 Lowest | 1,200 ₹6,48,000 | 1,000 ₹5,40,000 Lowest |
| 1.09 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc as per direction of Engineeer-in-Charge. | 32,003.4 | KWH | 30 ₹9,60,102 | 35 ₹11,20,119 | 15 ₹4,80,051 | 10 ₹3,20,034 Lowest |
Tender Value
₹2.7 Cr
EMD Value
₹5.3 L
Closing Date
20 Aug 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
Rapti Nahar Nirman Mandal 1 Balrampur
As per Tender Notice
2026_UPIDC_1174864_4
01/SE/2026-27
Open Tender
Civil Works - Canal
Item Rate
120 days
Siddharthnagar
As per Tender Notice
2 documents required · 2 mandatory
₹2,350
₹5.3 L
Yes
10 Sept 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
20 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION PRESSURE WELL | |||||
| 1.01 | Earth work excavation of foundation for construction of well and laying pipes in all types of soils excluding mechanical compaction but inclusive of manual compaction and its proper disposal & back filling with dressing to profile including all lead and lift, labour, T&P etc.as per direction of Engineeer-in-Charge. | 49,144.12 | CUM | - | - |
| 1.02 | E/W in filling dry earth including lead upto 30m and lift 1.5 m excluding mechanical compaction but inclusive of manual compaction and dressing to profiles including all cost of labour,t&p etc as per direction of Engineeer-in-Charge. | 12,422.61 | CUM | - | - |
| 1.03 | Centering & Shuttering for P.C.C work in different parts of structures required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc.as per direction of Engineeer-in-Charge. | 279.24 | SQM | - | - |
| 1.04 | Centering & Shuttering for R.C.C work in different parts of structures required for proper completion of work including cost of all materials and scaffolding, labour ,T.&P. etc.as per direction of Engineeer-in-Charge. | 4,152.9 | SQM | - | - |
| 1.05 | Laying C.C- A 40 M10 in foundation of all structures with Cement O.P.C.,43 grade. course sand of F.M. not less than 2.0 and hard stone ballest (20-40mm size) including lead up to 60.0 m.lift up to 3.0 m. mechanical mixing & mechanical vibration but excluding cost of Centering and shuttering required for proper completion of work including cost of all material T&P labour etc.as per direction of Engineeer-in-Charge. | 82.29 | CUM | - | - |
| 1.06 | Cutting, Bending, Binding and placing TMT steel bars for reinforcement with cost of binding wire required for proper completion of work including cost of all material, labour T&P etc.as per direction of Engineeer-in-Charge. | 58.71 | MT | - | - |
| 1.07 | Laying R.C.C, A-20, M-20 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.as per direction of Engineeer-in-Charge. | 580.83 | CUM | - | - |
| 1.08 | Supplying & Fixing 200mm dia HDPE pipe PE-100: 6Kg/sq.cm required for proper completion of work including cost of all material, labour and T&P etc.as per direction of Engineeer-in-Charge. | 540 | RM | - | - |
| 1.09 | Dewatering with all cost of power POL machine pump, well point system & operator with assembling & dismantling of equipment etc as per direction of Engineeer-in-Charge. | 32,003.4 | KWH | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
lot4.pdf
Tender Documents • 3.04 MB
BOQ_2207880.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .