Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 Cr+₹14.4 L (5.18%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Bidder does not submit documents as per NIB point no 7 and 8 | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Bidder does not submit documents as per NIB point no 7 and 8 | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Bidder does not submit documents as per NIB point no 7 and 8 |
Tender Value
₹2.5 Cr
EMD Value
₹5.1 L
Closing Date
23 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE WR Circle Bharatpur
SE WR Circle Bharatpur
Repair and Restoration work of Bahram ka bas Anicut and Tikli Ka Bas Anicut GP Bahram Ka Bas PS Bansur District Kotputli-Behror
2025_WRDAS_498669_1
SE NIT 02/2025-26_Bahram ka Bas
Open Tender
Civil Works
Percentage
457 days
under jurisdiction of EE Alwar Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
as per nit
₹5.1 L
Yes
24 Sept 2025
3 Sept 2025
24 Sept 2025
3 Sept 2025
23 Sept 2025
3 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 939.05 | Cum | 140 | ₹1,31,467 |
| 2 | Centering and shuttering for 2nd stage concrete for F2 finish) For vertical blocks outs | 3,498.29 | Sqm | 300 | ₹10,49,487 |
| 3 | Supply & fixing 6 mm thick rubber water seal of approved quality in construction/contraction joints as per drawing complete in all respect. 305 mm wide | 55 | R.M. | 675 | ₹37,125 |
| 4 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 42,351.76 | Kg. | 89 | ₹37,69,306.64 |
| 5 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 4,800 | Sqm | 2.5 | ₹12,000 |
| 6 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard soil mixed with Kankar / boulders, Morrum
Add extra over item 10 (a) for lead beyond 250m & upto 750m (for average 1/2Km).
Beyond initial lead of 50 m & upto 250 m | 30,227.94 | Cum | 136.25 | ₹41,18,556.82 |
| 7 | Add extra for each subsequent lead of 500m or part, there of beyond 0.500 Km. & upto 5 Km | 27,589.22 | Cum | 8.5 | ₹2,34,508.37 |
| 8 | (i) Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.at least 95% of Standard Proctor s density | 2,638.71 | Cum | 39 | ₹1,02,909.69 |
| 9 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 2,638.71 | Cum | 12.6 | ₹33,247.75 |
| 10 | Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface | 337.5 | Cum | 1,286 | ₹4,34,025 |
stage.html
html • 0.03 MB
finance_889106.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
BOQ_889106.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .