Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
20 May 2020, 11:00 amClosed
V.Anniyappan - DGM (Contracts)
CPCL, Manali - Chennai.
Long Term Service Agreement (LTSA) for Inspection, Service and Refurbishment of Parts including Spares Replacement for Ms. BHEL make Gas Turbines 230-GT-01/02/03 and 21-GT-04/05 at CPP and OPH in CPCL-Manali Refinery
2020_DGMMC_7060_1
CC002120
Limited
Oil/Gas/Lubricants
Works
CPCL, Manali - Chennai.
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
12 Oct 2020
14 May 2020
20 May 2020
14 May 2020
20 May 2020
18 May 2020
Amount
LTSA-INSPECTI FOR GT-1,2 ,3,4 &5- 1ST YR
CHARGES FOR INSPECTION / SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03,21-GTG-04&21-GTG-05) FOR THE FIRST YEAR-2020 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES
Combustion Inspection (CI), Mechanical
Combustion Inspection (CI) Instrumentation
Borescope Inspection (BI)
Major Inspection of GT(MI) Mechanical
Major Inspection of GT(MI) Instrumentation
Auxilary Gear Box(AGB) Inspection
Load Gear Box Inspection
EXTENDED COMBUSTION INSPECTION / HOT GAS PATH INSPECTION
Mechanical -TA (Technical Adviser)
Control & Instrumentation-TA (Technical Adviser)
EXHAUST PLENUM REPLACEMENT
LTSA-INSPECTI FOR GT-1,2 ,3,4 & 5-2ND YR
CHARGES FOR INSPECTION / SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03,21-GTG-04 & 21-GTG-05) FOR THE 2 ND (SECOND) YEAR-2021 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
Combustion Inspection (CI)-Mechanical
Combustion Inspection (CI) Instrumentation
Borescope Inspection (BI)
Major Inspection of GT(MI) Mechanical
Major Inspection of GT(MI) Instrumentation
Auxilary Gear Box(AGB) Inspection
Load Gear Box Inspection
EXTENDED COMBUSTION INSPECTION / HOT GAS PATH INSPECTION
Mechanical -TA (Technical Adviser)
Control & Instrumentation-TA (Technical Adviser)
EXHAUST PLENUM REPLACEMENT
LTSA-INSPECTI FOR GT-1,2 ,3&4 &5- 3RDYR
CHARGES FOR INSPECTION/SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03, 21-GTG-04& 21-GTG-05) FOR THE 3 RD (THREE)YEAR-2022 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
Combustion Inspection (CI), Mechanical
Combustion Inspection (CI) Instrumentation
Borescope Inspection (BI)
EXTENDED COMBUSTION INSPECTION / HOT GAS PATH INSPECTION
Mechanical -TA
Control & Instrumentation-TA
EXHAUST PLENUM REPLACEMENT
LTSA-INSPECTI FOR GT-1,2 ,3,4&5 - 4&5 YR
CHARGES FOR INSPECTION SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03, 21-GTG-04 & 21-GTG-05) FOR THE 4 TH (FOUR)YEAR 2023 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
Combustion Inspection (CI)
Combustion Inspection (CI) Instrumentation
Borescope Inspection (BI)
MAJOR INSPECTION OF GT (MI) MECHANICAL
MAJOR INSPECTION OF GT (MI) INSRUMENTATION
AUXILARY GEAR BOX (AGB) INSPECTION
LOAD GEAR BOX (LGB) INSPECTION
EXTENDED COMBUSTION INSPECTION / HOT GAS PATH INSPECTION
Mechanical -TA
Control & Instrumentation-TA
EXHAUST PLENUM REPLACEMENT
CHARGES FOR INSPECTION SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03, 21-GTG-04 & 21-GTG-05) FOR THE 5 TH (FIFTH) YEAR 2024 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
COMBUSTION INSPECTION (CI) MECHANICAL
COMBUSTION INSPECTION (CI) INSTRUMENTATION
BORESCOPE INSPECTION (BI)
MAJOR INSPECTION OF GT (MI) MECHANICAL
MAJOR INSPECTION OF GT (MI) INSRUMENTATION
AUXILARY GEAR BOX (AGB) INSPECTION
LOAD GEAR BOX (LGB) INSPECTION
EXTENDED COMBUSTION INSPECTION / HOT GAS PATH INSPECTION
MECHANICAL TECHNICAL ADVICER. (MECHANICAL-TA)
CONTROL & INSTRUMENTATION-TA (TECHNICAL ADVICER)
EXHAUST PLENUM REPLACEMENT
LTSA-RECONDITIONING -GT-1,2,3,4&5 1ST YR
CHARGES FOR RECONDITIONING SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03,21-GTG-04 & 21-GTG-05) FOR THE 1 ST (FIRST) YEAR-2020 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES
Repair of First Stage Nozzle S1N(1No)
Repair of Second Stage Nozzle S2N (1No)
Repair of First Stage Shroud (Standard) (1Set)
Repair of Second Stage Shroud (Standard)(1Set)
Repair of Stage II Honeycomb Shrouds(Set=30Nos)
Repair of First Stage Buckets (1 Set=120Nos)
Repair of Second Stage Buckets (1 Set=90Nos)
Repair of Combustion Liners
Repair of Transition Pieces
Repair, Testing calibration of Dual Fuel Nozzle
Repair of Cross-Fire Tubes
Repair of Retainer
Repair of Bull Horns
LTSA-RECONDITIONING -GT-1,2,3,4&5 2ND YR
CHARGES FOR RECONDITIONING SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03,21-GTG-04& 21-GTG-05) FOR THE 2 ND (SECOND) YEAR-2021 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES
Repair of First Stage Nozzle S1N(1No)
Repair of Second Stage Nozzle S2N (1No)
Repair of First Stage Shroud (Standard) (1Set)
Repair of second Stage Shroud (Standard) (1Set)
Repair of Stage II Honeycomb Shrouds(Set=30Nos)
Repair of First Stage Buckets (1 Set=120Nos)
Repair of Second Stage Buckets (1 Set=90Nos)
Repair of Combustion Liners (Each)
Repair of Transition Pieces (Each)
Repair, Testing calibration of Dual Fuel Nozzle
Repair of Cross-Fire Tubes
Repair of Retainer
Repair of Bull Horns
LTSA-RECONDITIONING -GT-1,2,3,4&5 3RD YR
CHARGES FOR RECONDITIONING SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03,21-GTG-04&21-GTG-05) FOR THE 3 RD (THREE) YEAR 2022 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES
Repair of Combustion Liners
Repair of Transition Pieces
Repair, Testing calibration of Dual Fuel Nozzle
Repair of Cross-Fire Tubes
Repair of Retainer
LTSA-RECONDITIONING -GT-1,2,3,4&5 4TH YR
CHARGES FOR RECONDITIONING SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03,21-GTG-04&21-GTG-05) FOR THE 4 TH (FOUR) YEAR 2023 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES
REPAIR OF 1st STAGE NOZZLE S1N (1NO)
REPAIR OF 2nd STAGE NOZZLE S2N (1NO)
REPAIR OF 1st STAGE SHROUD(STD), (1SET)
REPAIR OF 2nd STAGE SHROUD(STD), (1SET)
REPAIR OF 2nd STAGE (HONEYCOMB)SHROUD (SET=30Nos)
REPAIR OF 1st STAGE BUCKETS (1SET= 120 NOS)
REPAIR OF 2nd STAGE BUCKETS (1SET=90 NOS)
Repair of Combustion Liners
Repair of Transition Pieces
Repair, Testing calibration of Dual Fuel Nozzle
Repair of Cross-Fire Tubes
Repair of Retainer
Repair of Bull Horns
CHARGES FOR RECONDITIONING SERVICES IN CPP & OPH GAS TURBINES (230-GTG-01/02/03,21-GTG-04&21-GTG-05) FOR THE 5 TH (FIFTH) YEAR 2024 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES
REPAIR OF 1st STAGE NOZZLE S1N (1NO)
REPAIR OF 2nd STAGE NOZZLE S2N (1NO)
REPAIR OF 1st STAGE SHROUD(STD), (1SET)
REPAIR OF 2nd STAGE SHROUD(STD), (1SET)
REPAIR OF 2nd STAGE (HONEYCOMB)SHROUD (SET=30Nos)
REPAIR OF 1st STAGE BUCKETS (1SET= 120 NOS)
REPAIR OF 2nd STAGE BUCKETS (1SET=90 NOS)
REPAIR OF COMBUSTION LINERS
REPAIR OF TRANSITION PIECES
REPAIR, TESTING CALIBRATION OF DUAL FUEL NOZZLE
REPAIR OF CROSS- FIRE TUBES
REPAIR OF RETAINER
REPAIR OF BULL HORNS
LTSA-SUPPLY OF SPARES-GT-1,2,3,4&5 1STYR
CHARGES FOR SUPPLY OF PARTS FOR REPLACEMENT TOWARDS REPAIR & RECONDITIONING OF CPP& OPH GAS TURBINES (230-GTG-01/02/03, 21-GTG-04 &21-GTG-05) FOR THE FIRST YEAR 2020 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
HULA SEAL FOR COMBUSTION LINER
COWL CAP FOR COMBUSTION LINER
COWL CAP ASSEMBLY FOR COMBUSTION LINER
XFT COLLAR FOR COMBUSTION LINER
AFT SLEEVE FOR COMBUSTION LINER
FIXED SEAL FOR TRANSITION PIECES
FLOATING SEAL FOR TRANSITION PIECES
TRANSITION PICECE ASSEMBLY FOR DUAL FUEL NOZZLE
AIR CONE FOR DUAL FUEL NOZZLE
GAS TIP FOR DUAL FUEL NOZZLE
LTSA-SUPPLY OF SPARES-GT-1 TO 5 2ND YR
CHARGES FOR SUPPLY OF PARTS FOR REPLACEMENT TOWARDS REPAIR & RECONDITIONING OF CPP& OPH GAS TURBINES (230-GTG-01/02/03, 21-GTG-04 &21-GTG-05) FOR THE SECOND YEAR 2021 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
HULA SEAL FOR COMBUSTION LINER
COWL CAP FOR COMBUSTION LINER
Cowl Cap Assembly
XFT COLLAR FOR COMBUSTION LINER
AFT SLEEVE FOR COMBUSTION LINER
FIXED SEAL FOR TRANSITION PIECES
FLOATING SEAL FOR TRANSITION PIECES
TRANSITION PICECE ASSEMBLY FOR DUAL FUEL NOZZLE
AIR CONE FOR DUAL FUEL NOZZLE
GAS TIP FOR DUAL FUEL NOZZLE
LTSA-SUPPLY OF SPARES-GT-1 TO 5- 3RD YR
CHARGES FOR SUPPLY OF PARTS FOR REPLACEMENT TOWARDS REPAIR & RECONDITIONING OF CPP& OPH GAS TURBINES (230-GTG-01/02/03 21-GTG-04 & 21-GTG-05) FOR THE THIRD YEAR 2022 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
HULA SEAL FOR COMBUSTION LINER
COWL CAP FOR COMBUSTION LINER
COWL CAP ASSEMBLY FOR COMBUSTION LINER
XFT COLLAR FOR COMBUSTION LINER
AFT SLEEVE FOR COMBUSTION LINER
TRANSITION PICECE ASSEMBLY FOR DUAL FUEL NOZZLE
AIR CONE FOR DUAL FUEL NOZZLE
GAS TIP FOR DUAL FUEL NOZZLE
LTSA-SUPPLY OF SPARES-GT-1-5- 4 &5TH YR
CHARGES FOR SUPPLY OF PARTS FOR REPLACEMENT TOWARDS REPAIR & RECONDITIONING OF CPP& OPH GAS TURBINES (230-GTG-01/02/03, 21-GTG-04 & 21-GTG-05 FOR THE FOURTH YEAR 2023 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
HULA SEAL FOR COMBUSTION LINER
COWL CAP FOR COMBUSTION LINER
COWL CAP ASSEMBLY FOR COMBUSTION LINER
XFT COLLAR FOR COMBUSTION LINER
AFT SLEEVE FOR COMBUSTION LINER
FIXED SEAL FOR TRANSITION PIECES
FLOATING SEAL FOR TRANSITION PIECES
TRANSITION PICECE ASSEMBLY FOR DUAL FUEL NOZZLE
AIR CONE FOR DUAL FUEL NOZZLE
GAS TIP FOR DUAL FUEL NOZZLE
CHARGES FOR SUPPLY OF PARTS FOR REPLACEMENT TOWARDS REPAIR & RECONDITIONING OF CPP& OPH GAS TURBINES (230-GTG-01/02/03, 21-GTG-04 & 21-GTG-05 FOR THE FIFTH YEAR 2024 AS PER SCOPE OF WORK WITH TIME SCHEDULE AND SPECIAL TERMS & CONDITIONS ATTATCHED AS ANNEXURES.
HULA SEAL FOR COMBUSTION LINER
COWL CAP FOR COMBUSTION LINER
COWL CAP ASSEMBLY FOR COMBUSTION LINER
XFT COLLAR FOR COMBUSTION LINER
AFT SLEEVE FOR COMBUSTION LINER
FIXED SEAL FOR TRANSITION PIECES
FLOATING SEAL FOR TRANSITION PIECES
TRANSITION PICECE ASSEMBLY FOR DUAL FUEL NOZZLE
AIR CONE FOR DUAL FUEL NOZZLE
GAS TIP FOR DUAL FUEL NOZZLE
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .