Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC 304 VELENTINE TOWER FILM CITY ROAD MALAD E MUMBAI 400097 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400097 | ₹1.3 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.4 L+₹3,280.40 (2.45%)Rejected-Finance ANDHERI EAST TELI GALI NEAR SAI BABA MANDIR MUMBAI 400069 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400069 | ₹1.4 L+₹3,280.40 (2.45%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 L+₹5,298.20 (3.96%)Rejected-Finance | ₹1.4 L+₹5,298.20 (3.96%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SKYLINE ENGINEERS L1 | AARADHYA ELECTRICALS L2 | Naren Electric Co L3 |
|---|---|---|---|---|---|---|
| 1.00Work of filtration and testing of transformer oil of Transformers at Shimpoli pumping station as per specifications | ||||||
| 1.01 | Oil Filtration of 630 KVA transformer at Shimpoli Pumping station with Oil Testing (BDV) of each Transformer (2 samples per Transformer), Earth Pit resistance testing | 2 | Job | 39,000 ₹46,020 Lowest | 39,500 ₹46,610 | 40,000 ₹47,200 |
| 1.02 | Replacement of Silica Gel | 2 | Job | 2,190 ₹2,584.2 Lowest | 2,250 ₹2,655 | 2,300 ₹2,714 |
| 1.03 | Testing of Transformers with a) Voltage ratio test, ii) Vector group test, iii) Magnetic balance test, iv) Magnetic current test, V) Bucholz relay test, Vi) Insulation resistance test | 2 | Job | 28,920 ₹34,125.6 Lowest | 30,000 ₹35,400 | 30,000 ₹35,400 |
| 1.04 | Top up of Transformer Oil | 50 | Litre | 9,400 ₹11,092 Lowest | 9,650 ₹11,387 | 9,500 ₹11,210 |
| 1.05 | Paitning of Both Transformers | 2 | Nos | 33,800 ₹39,884 Lowest | 34,690 ₹40,934.2 | 36,000 ₹42,480 |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
27 Apr 2026, 4:00 pmClosed
DyChESOWS
Office of DyChESOWS Vesrsova ppg stn Admin Build Andheri West 400053
Work of filtration and testing of transformer oil of Transformers at Shimpoli pumping station
2026_MCGM_1295147_1
Sh-03 of 2026-27
Open Tender
Electrical Works
Item Rate
15 days
Shimpoli ppg stn
As per Quotation Document
2 documents required · 2 mandatory
₹472
₹1,500
23 Jul 2026
20 Apr 2026
28 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work of filtration and testing of transformer oil of Transformers at Shimpoli pumping station as per specifications | |||||
| 1.01 | Oil Filtration of 630 KVA transformer at Shimpoli Pumping station with Oil Testing (BDV) of each Transformer (2 samples per Transformer), Earth Pit resistance testing | - | Job | - | - |
| 1.02 | Replacement of Silica Gel | - | Job | - | - |
| 1.03 | Testing of Transformers with a) Voltage ratio test, ii) Vector group test, iii) Magnetic balance test, iv) Magnetic current test, V) Bucholz relay test, Vi) Insulation resistance test | - | Job | - | - |
| 1.04 | Top up of Transformer Oil | - | Litre | - | - |
| 1.05 | Paitning of Both Transformers | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
SH3QtnDraft.pdf
Tender Documents • 0.35 MB
BOQ_2225429.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .