Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 CrAccepted-AOC 1102 11TH FLOOR THE AFFAIR TOWER PLOT NO 9 SECTOR 17 SANPADA NAVI MUMBAI MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical A 1 2 SHANTINIKETAN COLONY NEAR BUS DEPO AUSA ROAD LATUR MAHARASHTRA | LATUR | LATUR | MAHARASHTRA | - | Rejected-Technical REJECTED | |
| 3 | Rejected-Technical PURUSHOTTAM NIWAS KHANDEPAR PONDA GOA 403401 | SOUTH GOA | GOA | 403401 | - | Rejected-Technical REJECTED |
Tender Value
₹16.7 Cr
EMD Value
₹33.4 L
Closing Date
12 Aug 2024, 3:00 pmClosed
UNIVERSITY ENGINEER
GOA UNIVERSITY TALEIGAO PLATEAU GOA
Construction of building for School of Earth, Ocean and Atmospheric Sciences
2024_GU_16429_1
GU/9/2024-2025/Engg AND Tech Div/ 100
Open Tender
Civil Works
Item Rate
540 days
GOA UNIVERSITY TALEIGAO PLATEAU GOA
PLEASE REFER TENDER DOCUMENTS
11 documents required · 11 mandatory
₹30,000
₹33.4 L
24 Oct 2024
25 Jul 2024
13 Aug 2024
25 Jul 2024
12 Aug 2024
26 Jul 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001). | 8,000 | SQ.M. | - | - |
| 2Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : | |||||
| 2.01 | b) All types of Ordinary rock including all types of laterite rock, blasting prohibited | 60 | CUM | - | - |
| 3Earthwork in excavation by mechanical means ( hydraulic excavator/manual means in foundation trenches drain ( not exceeding 1.5 m in width or 10 sq.m on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. | |||||
| 3.01 | b. All types of ordinary rock including all types of laterite rock, blasting prohibited. | 3,647.19 | CU.M | - | - |
| 4Extra for additional depth of 1.5 m or part thereof in: | |||||
| 4.01 | c) All types of laterite rocks and hard rocks | 1,848 | CU.M | - | - |
| 5 | Refilling the foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50M and all lifts and disposal of surplus earth as directed by Engineer in charge | 3,186.68 | CU.M | - | - |
| 6Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. | |||||
| 6.01 | b) Moorum | 1,400.74 | CU.M | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_16725.xls
BOQ Document • 0.58 MB
148981385.pdf
Tender Document • 0.12 MB
148981386.pdf
Tender Document • 0.24 MB
148981388.html
Tender Document • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .