Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.1 L+₹1,516.16 (1.44%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.1 L+₹5,554.24 (5.29%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.1 L+₹6,785.18 (6.46%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹1.1 L+₹7,505.73 (7.14%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
16 Jun 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_311807_7
e-NIT No. 14 REW UDHAMPUR of 2026-27 Dated 08-06-2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,000
3 Jul 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add CIB and Photos | 1 | No | 7,000 | ₹7,000 |
| 2 | Earth work in bulk excavation by Mechanical means (hydroulic excavator) over area (exceeding 30cm in depth 1.5m as well as 10m^2 on plan ) including disposal of excavated earth lead upto 50m and lift upto 1.5m 70 % all kind soil 20 % ordinary soil and 10 % hard rock blasting prohibited | 22.36 | cum | 322.55 | ₹7,212.22 |
| 3 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 278.81 | sqm | 91.75 | ₹25,580.82 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, 100% Qty. in A.k.S. | 5.66 | cum | 479.3 | ₹2,712.84 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.94 | cum | 4,826.5 | ₹4,536.91 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 70 % concrete & 30% BOULDERS | 19.3 | cum | 4,294.62 | ₹82,886.17 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: foundation | 26.67 | sqm | 286.35 | ₹7,636.95 |
| 8 | Carriage Cement 15 KM MT | 3.1 | mt | 306.18 | ₹949.16 |
| 9 | Carriage Sand 65 KM(MT) | 6.51 | cum | 906.74 | ₹5,902.88 |
| 10 | Carriage Stone Aggregates 15 KM(MT) | 13.01 | cum | 344.49 | ₹4,481.81 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_1009453.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .