Loading…
Loading…
Tender Value
₹8.0 L
EMD Value
₹15,980
Closing Date
3 Jul 2026, 12:00 pm
Similar tender results from the same govt authority in the past 3 years.
Sarpanch
Dharge Sancordem Goa
Construction of Steps at Ganesh Visarjan Site at Bolkarne in V.P. Sancordem, Dharbandora Taluka
2026_VP_29772_1
VPS/DHR/E-Tend/26-27/700
Open Tender
Civil Works
60 days
Sancordem
Please Refer tender documents
2 documents required · 2 mandatory
₹5,000
₹15,980
19 Jun 2026
19 Jun 2026
6 Jul 2026
19 Jun 2026
3 Jul 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | ||||||
| 1.01 | a) all kind of soil | 16.8 | M3 | 291 | ₹4,888.8 | - |
| 2 | Rubble packing with hard laterite stone under
floors including watering ramming and
consolidating etc. in pipeline trenches and other
foundations complete. | 13.92 | M3 | 2,211 | ₹30,777.12 | 5035 |
| 3Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | ||||||
| 3.01 | a) All work to upto plinth level | 8.31 | M3 | 6,192 | ₹51,455.52 | - |
| 4 | Laterite masonry in neatly dressed stones for 23
cms thick masonry walls in c.m. 1 : 4 (1 cement : 4
coarse sand in foundation upto plinth level | 28.23 | M3 | 6,075 | ₹1,71,497.25 | 5043 |
| 5 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 179.56 | M3 | 223 | ₹40,041.88 | 11004 |
| 6Chequered terrazo tiles 22 mm thick with marble chips of sizes upto 6 mm in floor on 25 mm thick bed of lime mortar 1:2 (1 lime putty : 2 coarse sand ) jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and polishing completed. | ||||||
| 6.01 | c) Dark shade using ordinary cement | 23.4 | M3 | 929 | ₹21,738.6 | - |
| 7Kotah stone slab flooring over 20 mm (average) thick base laid over & jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing & complete with base of cement mortar 1:4 (1 cement : 4 coarse sand) | ||||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_30197.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid