Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.2 LAccepted-Finance ELECTRICAL CO HPSEG LTD KEYLONG L GS HP 175132 | LAHUL AND SPITI | HIMACHAL PRADESH | 175132 | ₹5.2 L | L-1 | Accepted-Finance Accepted |
| 2 | L-2₹5.5 L+₹32,780.65 (6.31%)Rejected-Finance JOGINDER NAGAR | ₹5.5 L+₹32,780.65 (6.31%) | L-2 | Rejected-Finance rejected |
| 3 | L-3₹5.8 L+₹58,676.40 (11.3%)Rejected-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹5.8 L+₹58,676.40 (11.3%) | L-3 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | Sanjeev Kumar L3 | SHER SINGH L1 | AMIT KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work in all classification of earth work such as pick work, jumper work, saturated soil, blasting soft/ hard rock or chiselling, soft/ hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of beds to correct grades including shoring, strutting, planking, timbering where ever required, stacking the usable/ serviceable materials/soil separately complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge. | 13.61 | Cum | 495 ₹6,736.95 | 450 ₹6,124.5 Lowest | 470 ₹6,396.7 |
| 2.00 | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | 3.89 | Cum | 600 ₹2,334 | 545 ₹2,120.05 Lowest | 580 ₹2,256.2 |
| 3.00 | Providing and laying cement concrete 1:5:10 ( 1 cement : 5 sand : 10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads & lifts and as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 33.4 | Cum. | 8,450 ₹2,82,230 | 7,500 ₹2,50,500 Lowest | 8,000 ₹2,67,200 |
| 4.00Cement concrete linning 15cm thick or less for irrigation channel in cement concrete 1:3:6(1Cement: 3Sand: 6Graded stone agg.40mm nominal size) with in all leads and lifts& to the entire satisfiction of the Engineer-in-charge. | ||||||
| 4.01 | a) Hand mixed conc. Linning in Bed | 13.59 | Cum | 9,750 ₹1,32,502.5 | 9,100 ₹1,23,669 Lowest | 9,500 ₹1,29,105 |
| 4.02 | b) Hand mixed conc. Linning in side slopes | 8.58 | Cum | 10,950 ₹93,951 | 10,000 ₹85,800 Lowest | 10,600 ₹90,948 |
| 5.00Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | ||||||
| 5.01 | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | 78.37 | Sqmt. | 710 ₹55,642.7 | 600 ₹47,022 Lowest | 660 ₹51,724.2 |
| 6.00 | Extra allowance for form work in side slope as per direction to the entire satisfaction of the Engineer-in-Charge. | 8.58 | Cum | 590 ₹5,062.2 | 530 ₹4,547.4 Lowest | 575 ₹4,933.5 |
Tender Value
₹5.0 L
EMD Value
₹9,912
Closing Date
8 Apr 2026, 5:00 pmClosed
EE Rampur
JSD Rampur
Restoration of Rain damages to FIS Dwarch Bathara Kuhal No. IV
2026_HPIPH_133234_1
EE-JSD-RMP-E-Ten/25-17401-50 dt 31.03.2026
Open Tender
Civil Works
Item Rate
60 days
Rampur
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
₹9,912
3 Aug 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
8 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Cutting in earth work in all classification of earth work such as pick work, jumper work, saturated soil, blasting soft/ hard rock or chiselling, soft/ hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of beds to correct grades including shoring, strutting, planking, timbering where ever required, stacking the usable/ serviceable materials/soil separately complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge. | - | Cum | - | - |
| - | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
| - | Providing and laying cement concrete 1:5:10 ( 1 cement : 5 sand : 10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads & lifts and as per the direction & to the entire satisfaction of the Engineer-in-Charge. | - | Cum. | - | - |
| - | Cement concrete linning 15cm thick or less for irrigation channel in cement concrete 1:3:6(1Cement: 3Sand: 6Graded stone agg.40mm nominal size) with in all leads and lifts& to the entire satisfiction of the Engineer-in-charge. | - | - | - | - |
| - | a) Hand mixed conc. Linning in Bed | - | Cum | - | - |
| - | b) Hand mixed conc. Linning in side slopes | - | Cum | - | - |
| - | Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | - | - | - | - |
| - | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | - | Sqmt. | - | - |
| - | Extra allowance for form work in side slope as per direction to the entire satisfaction of the Engineer-in-Charge. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
TC.pdf
Tender Documents • 0.16 MB
BOQ_197036.xls
BOQ • 0.27 MB
F6.pdf
Tender Documents • 0.66 MB
F8.pdf
Tender Documents • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .