Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance KALYANPUR HOUSING ESTATE DIST PASCHIM BARDHAMAN PIN 713305 | PASCHIM BARDHAMAN | WEST BENGAL | 713305 | ₹4.8 L | L1 | Accepted-Finance Lowest rate quoted and accepted |
| 2 | L2₹4.8 L+₹769.10 (0.16%)Accepted-Finance | ₹4.8 L+₹769.10 (0.16%) | L2 | Accepted-Finance Lowest rate quoted by PRADIP SINHA |
| 3 | L3₹4.8 L+₹1,538.20 (0.32%)Accepted-Finance | ₹4.8 L+₹1,538.20 (0.32%) | L3 | Accepted-Finance Lowest rate quoted by PRADIP SINHA |
Tender Value
₹4.8 L
EMD Value
₹9,614
Closing Date
13 Mar 2026, 4:00 pmClosed
ASSISTAN ENGINEER
POLO GROUND ASANSOL-713304
PLEASE FOLLOW THE NIT
2026_HSD_1010928_4
WBHOUSING/AE/ASN/eNIT12/25-26
Open Tender
CIVIL WORKS
Percentage
21 days
RHE Asansol
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,614
Yes
14 Jul 2026
28 Feb 2026
16 Mar 2026
2 Mar 2026
13 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or
drains, in all sorts of soil (including mixed soil but
excluding laterite or sandstone) including removing,
spreading or stacking the spoils within a lead of 75 m.
as directed. The item includes necessary trimming the
sides of trenches, levelling, dressing and ramming the
bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | - | %Cu.M. | 11,927 | - |
| 2 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth | - | Cu.M. | 4,766.81 | - |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 1 | Sq.M. | 324 | ₹323.68 |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (a) Pakur Variety | 1 | Cu.M. | 4,660.29 | ₹4,659.82 |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (f) 25 mm to 30 mm shuttering without staging in foundation | 1 | Sq.M. | 205 | ₹204.8 |
| 6 | Stripping off worn out plaster and racking out joints of walls, ceiling etc. upto any height & in anyfloor including removing rubbisbh ans stacking anywhere within the compound as directed | 1 | Sq.M. | 19 | ₹18.98 |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). (i) With 1:6 cement mortar. (c) 15 mm thick plaster | - | Sq.M. | 133.55 | - |
| 7.01 | In 1st Floor | 1 | Sq.M. | 137.55 | ₹137.41 |
| 7.02 | In 2nd Floor | 1 | Sq.M. | 141.55 | ₹141.41 |
| 7.03 | In 3rd Floor | - | Sq.M. | 145.55 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Corrigendum.pdf
Additional Documents • 0.87 MB
2911.pdf
Tender Documents • 0.50 MB
BOQ_2482462.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .