Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹26,500
Closing Date
14 Dec 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
THE GENERAL MANAGER, NTPS, APGCL, NAMRUP
O/O THE GENERAL MANAGER, NTPS, APGCL, NAMRUP
Construction of Assam type building for laboratory and instrument room at DM Plant, NRPP, APGCL, Namrup
2026_APGCL_55113_1
APGCL/GM/NTPS/2025-26/15 Dated 19/11/2026
Open Tender
Civil Works - Building
Works
50 days
NAMRUP THERMAL POWER STATION, APGCL, NAMRUP
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹26,500
19 Nov 2026
19 Nov 2026
15 Dec 2026
20 Nov 2026
14 Dec 2026
20 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ breaker/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) for all kinds of soil including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 11.15 | cu.m | - | - |
| 2 | Providing and laying in position cement concrete of 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) grade excluding the cost of centering and shuttering for all work up to plinth level | 3.73 | cu.m | - | - |
| 3 | Providing and laying in position of 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement for all work up to plinth level : | 4.56 | cu.m | - | - |
| 4 | Reinforced cement concrete of 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) grade for work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement | 2.3 | cu.m | - | - |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.59 | cu.m | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete | 38.16 | sq.m | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roofs, landings, balconies and access
platform | 4.45 | sq.m | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 21.18 | sq.m | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 37.8 | sq.m | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Weather shade, Chajjas, corbels etc., including edges | 5.72 | sq.m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BIDDOCUMENT.pdf
Tender Documents • 3.28 MB
BOQ_86245.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .