Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.3 Cr+₹12,595.72 (0.10%)Rejected-Finance | ₹1.3 Cr+₹12,595.72 (0.10%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
11 Jun 2026, 12:00 pmClosed
SE RED Circle-Moradabad.
SE RED Circle-Moradabad.
Community development works in Village Mandoura. (Member of Legislative Council)
2026_REDUP_1145292_1
15/RED/NIT/2026-27 Dated 04.04.2026
Open Tender
Civil Works
Percentage
365 days
Bijnor
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.0 L
SE RED Circle-Moradabad.
18 Jul 2026
5 May 2026
11 Jun 2026
5 May 2026
11 Jun 2026
5 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. (DSR Ch-1 sl 2.32 Page No. -95) | 500 | sqm | 6.25 | ₹3,125 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drain over areas (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottom, for all lifts, including getting out the excavated soil and dispose of surplus excavated soil as directed within a lead of 50 m. All kinds of soil as per ( DSR Ch-1 S.No.- 2.8.1, Page No. 91 ) | 479.98 | cum | 181.75 | ₹87,236.37 |
| 3 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20 percent with 1 percent concentration as per DSR 2023 S.I. No. 2.35.3 ,Page No. 95 | 274.94 | sqm | 216.5 | ₹59,524.51 |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc.complete for all lift.(Under Floor) ( DSR S.No.- 2.25 (a), Page No. 94 ) | 485.38 | cum | 489.13 | ₹2,37,413.92 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ( DSR ch-4 S.No.- 4.1.8, Page No. 103 ) | 70.74 | cum | 4,756.48 | ₹3,36,473.4 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) ( DSR S.No.- 6.1.2, Page No. 127 ) | 134.37 | cum | 4,980.09 | ₹6,69,174.69 |
| 7 | Providing and laying in position ready mixed or site batched design mixM-25 cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportions as per IS: 9103, in all works up to plinth level, including pumping of concrete to site of laying, laying, vibrating, curing etc. complete but excluding the cost of centering, shuttering and reinforcemen all complete as per DSR 2023 item no. 5.33.1.1, Page No. 120 | 114.05 | cum | 6,636.69 | ₹7,56,914.49 |
| 8 | Providing and laying in position ready mixed or site batched design mix M-25 cement concrete for reinforced cement concrete work, using coarse aggregate and fine aggregate derived from natural sources, cement, admixtures in recommended proportions as per IS: 9103, in all works above plinth level, including pumping of concrete to site of laying, laying, vibrating, curing etc. complete but excluding the cost of centering, shuttering and reinforcemen all complete as per DSR 2023 item no. 5.33.2.1, Page No. 120 | 127.4 | cum | 6,885.02 | ₹8,77,151.55 |
| 9 | Add for using extra cement in the items of design mix over and above the specified cement content there in as per DSR 2023 Item No. 5.35, Page No. 121 | 79.69 | qtl | 512.16 | ₹40,814.03 |
| 10 | Steel reinforcement for R.C.C. work ready to use " cut and bend" rebars of approved make from factory/ wrkshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more.( DSR S.No.- 5.22C.1, Page No. 119 ) | 246.24 | qtl | 6,958.07 | ₹17,13,355.16 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
T2buildbij.pdf
Tender Documents • 1.10 MB
BOQ_2141500.xls
BOQ • 0.52 MB
123.pdf
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .