| Sl No | Description | Qty | Unit | Anjali Electricals L1 | SHREE RAM ENTERPRISES L4 | M/S MOHAMMAD ABBAS L3 | M/S ABID CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|
| 1.00Installation of 250 KVA New Distribution Transformer Related Works- | |||||||
| 2.00 | Cartage of line Material from Central Store to JE store and JE store to different work site including loading & unloading at both ends. | 2 | Job. | 9,000 ₹18,000 Lowest | 18,000 ₹36,000 | 10,005 ₹20,010 | 10,000 ₹20,000 |
| 3.00 | Cartage of ST/PCC Pole (11 mter 81 No and 8.5 Meter 37 No. ) from central store to dump site with loding/unloading and from JE store/dump site to work site with loading/unloading etc. | 118 | No. | 1,200 ₹1,41,600 Lowest | 2,000 ₹2,36,000 | 1,405 ₹1,65,790 | 1,400 ₹1,65,200 |
| 4.00 | Erection of 8.5 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. | 37 | Job. | 7,500 ₹2,77,500 | 4,000 ₹1,48,000 | 3,455 ₹1,27,835 | 3,450 ₹1,27,650 Lowest |
| 5.00 | Cartage of 34 No T/F 250 KVA from Central Store to JE store and JE store to site of work including loading & unloading at both ends. | 34 | Job. | 7,500 ₹2,55,000 | 7,000 ₹2,38,000 | 6,005 ₹2,04,170 | 6,000 ₹2,04,000 Lowest |
| 6.00 | Erection of 11 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. | 13 | Job. | 3,500 ₹45,500 Lowest | 7,000 ₹91,000 | 6,005 ₹78,065 | 6,000 ₹78,000 |
| 7.00 | Erection of Double Pole on STP/PCC Pole after digging of pit of required size in all type of Soil for each pole, including back filling of the pole with proper ramming after completion of work. | 34 | No. | 14,000 ₹4,76,000 | 15,000 ₹5,10,000 | 12,005 ₹4,08,170 | 12,000 ₹4,08,000 Lowest |
| 8.00 | Fixing of Jointing kit suitable for 11 XLPE cable. | 10 | No. | 3,000 ₹30,000 Lowest | 3,000 ₹30,000 Lowest | 3,005 ₹30,050 | 3,000 ₹30,000 Lowest |
| 9.00 | Providing and Fixing Nut and Bolts off size. | 15 | Kg. | 150 ₹2,250 Lowest | 400 ₹6,000 | 201 ₹3,015 | 200 ₹3,000 |
| 10.00 | Providing & Fixing of Fencing (as per site requirement) at Various Distribution Transformers at Different Locations | 30 | No. | 35,000 ₹10,50,000 | 27,000 ₹8,10,000 | 25,005 ₹7,50,150 | 25,000 ₹7,50,000 Lowest |
Tender Value
₹85.7 L
EMD Value
₹85,650
Closing Date
17 Jun 2026, 1:00 pmClosed
SE EUDC MEERUT
SE EUDC MEERUT
Work related to installation of additional distribution transformers for Increasing capacity of substations under Business Plan 2026-27 in the area of 11 KV Line-South-Madhavpuram, Meerut.
2026_PVVNL_1153051_1
E-Tender No.-10/EUDC/MEERUT/2026-2027
Open Tender
Electrical Works
Lump-sum
SE EUDC MEERUT
TENDER DOCUMENT UPLOAD
2 documents required · 2 mandatory
₹3,540
SE EUDC MEERUT
₹85,650
22 Jun 2026
25 May 2026
17 Jun 2026
25 May 2026
17 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Installation of 250 KVA New Distribution Transformer Related Works- | - | - | - | - |
| 2 | Cartage of line Material from Central Store to JE store and JE store to different work site including loading & unloading at both ends. | 2 | Job. | - | - |
| 3 | Cartage of ST/PCC Pole (11 mter 81 No and 8.5 Meter 37 No. ) from central store to dump site with loding/unloading and from JE store/dump site to work site with loading/unloading etc. | 118 | No. | - | - |
| 4 | Erection of 8.5 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. | 37 | Job. | - | - |
| 5 | Cartage of 34 No T/F 250 KVA from Central Store to JE store and JE store to site of work including loading & unloading at both ends. | 34 | Job. | - | - |
| 6 | Erection of 11 meter PCC/STP Pole as single support for 11 KV/LT line after digging of pit of proper size and all type of Soil including back filling of the pole with proper ramming after completion of work. | 13 | Job. | - | - |
| 7 | Erection of Double Pole on STP/PCC Pole after digging of pit of required size in all type of Soil for each pole, including back filling of the pole with proper ramming after completion of work. | 34 | No. | - | - |
| 8 | Fixing of Jointing kit suitable for 11 XLPE cable. | 10 | No. | - | - |
| 9 | Providing and Fixing Nut and Bolts off size. | 15 | Kg. | - | - |
| 10 | Providing & Fixing of Fencing (as per site requirement) at Various Distribution Transformers at Different Locations | 30 | No. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TECHNICALFINAL10.pdf
Tender Documents • 0.84 MB
BOQ_2160023.xls
BOQ • 0.24 MB
EXTENSION_18.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .