Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAccepted-AOC | ₹6.2 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹6.3 Cr+₹14.8 L (2.41%)Rejected-AOC 35 MODEL TOWN G T ROAD JANDIALA GURU DISTRICT AMRITSAR | JANDIALA GURU | AMRITSAR | PUNJAB | ₹6.3 Cr+₹14.8 L (2.41%) | L2 | Rejected-AOC second lowest |
| 3 | L3₹6.3 Cr+₹19.0 L (3.09%)Rejected-AOC S O BOHAR SINGH | ₹6.3 Cr+₹19.0 L (3.09%) | L3 | Rejected-AOC Third Lowest |
Tender Value
₹6.8 Cr
EMD Value
₹13.6 L
Closing Date
20 Apr 2026, 4:00 pmClosed
Executive Engineer
Punjab Health Systems Corporation Punjab School Education Board, E Block, second floor, Phase-8, SAS Nagar
Construction of 28 No. Senior Residents Accommodation (Married) at Government Medical College, Amritsar, Distt. Amritsar (2nd Call)
2026_DHFW_165442_2
PHSC/EE(W)/2026-27/01
Open Tender
Civil Works
Percentage
365 days
Amritsar
As per DNIT
2 documents required · 2 mandatory
₹30,000
₹13.6 L
Yes
Executive Engineer
2 Jul 2026
9 Apr 2026
21 Apr 2026
9 Apr 2026
20 Apr 2026
16 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Gross Amount | |||||
| 1.01 | Civil+PH+Fire Fighting Works | - | Nos | - | - |
| 1.02 | Electrical Works | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
DNIT.pdf
Tender Documents • 2.35 MB
BOQ_335679.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .