Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LQualified 22 GURUDWARA BUILDING RAILWAY ROAD SRIGANGANAGAR RAJASTHAN 335001 | GANGANAGAR | RAJASTHAN | 335001 | L1 | Qualified MII | |
| 2 | L2₹15.4 L+₹3,352 (0.22%)Qualified 54 LAKKAR MANDI ROAD SRI GANGANAGAR GANGA NAGAR RAJASTHAN 335001 | GANGANAGAR | RAJASTHAN | 335001 | L2 | Qualified MSE, MII, Category: OBC | |
| 3 | L3₹16 L+₹62,412 (4.06%)Qualified B 1 245 NEW DELHI WEST DELHI DELHI 110063 | WEST DELHI | DELHI | 110063 | L3 | Qualified MSE, MII, Category: General | |
| 4 | L4₹18.0 L+₹2.6 L (16.8%)Qualified 7 BHAMBARHERI POST PADHA BHAMBARHERI NEAR BARMANAD MANDIR KARNAL HARYANA 132036 | KARNAL | HARYANA | 132036 | L4 | Qualified MSE, MII, Category: General | |
| 5 | L5₹23.5 L+₹8.1 L (52.9%)Qualified 299 LAL KURTI LALKURTI MEERUT MEERUT UTTAR PRADESH 250001 | MEERUT | UTTAR PRADESH | 250001 | L5 | Qualified MII |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
4 Jun 2024, 8:00 pmClosed
LAYING OF OFC CABLE
6324436
GEM/2024/B/4872464
Two Packet Bid
12 Core Unarmoured OFC,40 by 33 mm Permanently Lubricated HDPE Pipe with Pre install Poly Propylene
30 days
Rajasthan; Bikaner
Total value wise evaluation
BOQ
11 documents required · 11 mandatory
2 yrs
₹3
10%
₹80,000
11 Jul 2024
14 May 2024
4 Jun 2024
| Item No | Item Title | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|
| 1 | 12 Core Unarmoured OFC | 7,000 | Mtr | Bikaner | 30 |
| 2 | 40 by 33 mm Permanently Lubricated HDPE Pipe with Pre install Poly Propylene Rope Include Duct Accessories | 7,000 | Mtr | Road Nalla Culvert Crossing Bikaner Including Supply Of GI Pipe | 30 |
| 3 | Road Nalla Culvert crossing including supply of GI pipe Galvanized Iron 12 Gauge Medium Class with 150mm Inner Diameter | 30 | Mtr | Bikaner | 30 |
| 4 | Laying and Digging with OFC joint | 7,000 | Mtr | Bikaner | 30 |
| 5 | Fibre Termination Box | 2 | Nos | Bikaner | 30 |
| 6 | Pre fabricated RCC joint chambers | 4 | Nos | Bikaner | 30 |
| 7 | RCC or stone route markers | 42 | Nos | Bikaner | 30 |
| 8 | Joint indicators | 4 | Nos | Bikaner | 30 |
| 9 | Route index diagram in hard as well as soft copy | 7 | Nos | Bikaner | 30 |
| 10 | Straight Joint Closure 12F | 4 | Nos | Bikaner | 30 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_6324436.pdf
GEM_BID
tech_qr_suratgarh_page-0001_2024-04-19-10-03-53_8d7aecc2d54cd680b4097160df353086.pdf
BOQ
boq_item_suratgarh__2024-04-19-10-03-53_463d3bba1bff46522ac3daa38e8df8f3.csv
BOQ
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .