Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹17,900
Closing Date
25 Jan 2021, 2:00 pmClosed
SE GCC CBE
182,DR.SUBBARAYAN STREET, TATABAD, COIMBATORE DT - 641 012.
Dismantling loading unloading transporting erection gasketreplacement hot oil circulation N2 gas filling hot air blower OLTC overhauling testing and commissioning of 10MVA Capc of Pr Tr in Various SS in SSE I Cbe
2020_EB_189768_2
87/2020-21 of SE GCC CBE
Open Tender
Civil Works - Others
Works
365 days
Coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,900
Yes
2 Feb 2021
18 Jan 2021
25 Jan 2021
18 Jan 2021
25 Jan 2021
18 Jan 2021
Amount
Dismantling of header pipes, radiators, HV and LV bushing, Conservator tank, buchholz relays,equalising pipes and other allied acessories and draining the oil to the required level for loading transporting of Power transformer at various substations upto 10 MVA power transformers
Loading of Power Transformer main tank with oil and other accessories into truck from plinth including pulling/leading to a distance of 5 mtrs and the charges of all T&P's including all accessories etc
Transporting of Power transformer main tank with all accessories from one substation to another sub-station by low bed truck for 31 Ton to 50 Ton - First 100 KM (including insurance cost of 0.4% of SH value ) Value as decided by field engineer .
Transporting of Power transformer main tank with all accessories from one substation to another sub-station by low bed truck for 31 to 50 Tons - Beyond 100 KM upto destination (including insurance cost of 0.4% of SH value ) Value as decided by field engineer .
Unloading of Power Transformer main tank with oil and other accessories from truck covering the pulling for 5 mtrs and the charges of all T&P’s
Leading & pulling of power transformer from the plinth to safer Place within Substation Premises
Labour charges for erection of power Transformer accessories by using derrick wherever applicable for 10 MVA Power Transformer
Neutral bushing earthing at 2 Points and Transformer body earthing at two points. The channel and the M.S Plates for this will be supplied by the contractor. For 10 MVA power Transformer
Labour charges for Main tank Transformer Oil and OLTC Transformer oil , Hot Oil Circulation vacuum drying whenever applicable necessary to the required level and circulation of Oil till satisfactory results are obtained before commissioning for Upto 3000 litres
Labour charges for Main tank Transformer Oil and OLTC Transformer oil , Hot Oil Circulation vacuum drying whenever applicable necessary to the required level and circulation of Oil till satisfactory results are obtained before commissioning. From 3001 to required quantity
Filter Machine Rent for per circulation
Draining of oil from Power transformer main tank & OLTC to spare tank
Filling of oil from Spare tank to Power transformer main tank & OLTC
Termination of all sizes of cable glands including cost of all materials, labour etc., for all Power transformers
Termination of cable for all sizes of copper lugs, ferrules etc., including cost of materials, labour etc.,
Labour for laying of all size of cables
Labour charges for Cleaning , spray painting including “R”, “Y”, “B” Bushing painting of Power transformer and accessories including cost of Paint,waste, kerosene, soap etc.,
Labour charges for OLTC Overhauling Power/Auto Transformer including lifting of diverter cleaning replaceing of defective spares excluding materials cost .(Including T&P for lifting the OLTC and Travel & Conveyance charges)(The above work can be carried out purely on the basis of specially trained technician service availed from the reputed company when and where required)
Replacing of worn out gaskets by new gasket for all locations (ie,HV&LV bushings and Turrets,Buchholz pipeline,Top & side inspection covers,radiators,conservator tank,equalizing pipes,surge pipe lines etc.)in Power transformers complete,including hining charges of crane , and cleaning of entrire transformer , supply of waste etc., Note : The rate for the replacement of wornout gaskets is not sutable for coremounted transformers and are to be deceided by the official field engineers as per the site requirement .(gasket to be provided by the contractor)
Filling of N2 Gas for improving of IR values of Power transformer to attening the satisfactory value(excluding filter machine)
Hot air blower for improving of IR values of Power transformer to attaining the satisfactory value
Supply of HV Clamp for Power transformer for 10 MVA
Supply of LV Clamp for Power transformer for 10 MVA ( including Gun & Brass metal)
Supply of Neutral link for Power transformer for 10 MVA
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .