Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.0 L+₹4,923 (0.49%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹10.1 L+₹14,190 (1.42%)Rejected-AOC 00 RL QR NO 388 B KALIBARI COLONY ALIPURDUAR JN JALPAIGURI WEST BENGAL 736123 | ALIPURDUAR | WEST BENGAL | 736123 | L3 | Rejected-AOC L3 |
Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
26 Jun 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, EDC, BDN
BUDAUN
02/EDCB/2024-25
2024_MVVNL_927175_1
02/EDCB/2024-25
Open Tender
Electrical Works
Item Rate
365 days
BUDAUN
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹1,180
A/c No. 1243002100806171, IFSC Code - PUNB0124300
₹10,000
26 May 2025
11 Jun 2024
27 Jun 2024
11 Jun 2024
26 Jun 2024
11 Jun 2024
11 Jun 2024 - 26 Jun 2024
Amount
The work of safe carriage of the following material from Nawada store center to work site under the jurisdiction of EDD-IV (Ujhani), Budaun. Approx. distance upto 60 Km. Including safe loading and unloading.
PCC Pole 8.5 meter long.
STP 11 Mtr Long
Line material i.e., cross arm/ conductor/ pin insulator/stay/earthing rod/Disc Fitting/Disc Insulators/11 KV XLPE Cable etc.
11/0.4 KV 3 Phase 25 KVA T/F
11/0.4 KV 3 Phase 63 KVA T/F
11/0.4 KV 3 Phase 100 KVA T/F
11 KV Pilfer proof Metering cubical and CT PT Unit.
33 KV Pilfer proof Metering cubical and CT PT Unit.
Erection of new PCC Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms.
PCC Pole 8.5 Mtr Long Single Pole
PCC Pole 8.5 Mtr Long Double Pole
ST Pole 11 Mtr Long Single Pole.
ST Pole 11 Mtr Long Double Pole.
Grouting with 1:4:8 mixture in size (450x450x1500mm.) including cost of cement/C.C. & sand Required as per RESSPO Norms.
PCC Pole 8.5 Mtr Long Single Pole
PCC Pole 8.5 Mtr Long Double Pole
ST Pole 11 Mtr Long Single Pole.
ST Pole 11 Mtr Long Double Pole.
The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms
Laying, Stringing & Sagging of Following Conductor complete in all respect.
ACSR Weasel Conductor
3 Phase Arial Bunched Conductor
After Mounting of CT PT unit on double pole, laying of 50 Mtr 11 KV 3cx70 sq mm cable in single circuit on river sand form Double Pole to meetering room complete in all respect. Alongwith filling of 04 nos cable jointing kits.
After Mounting of CT PT unit on double pole, laying of 50 Mtr 33 KV 3cx120 sq mm cable in single circuit on river sand form Double Pole to meetering room complete in all respect. Alongwith filling of 04 nos cable jointing kits.
Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Alongwith filling of 04 nos cable jointing kits.
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x120 sqmm
33 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x300 sqmm
Under ground laying of Following cable in Single circuit by drill method to Double pole situated at both sides of NH/SH/Railway Crossing complete in all respect. Alongwith filling of 04 nos cable jointing kits.
11 KV XLPE Cable Size 3x70 sqmm
11 KV XLPE Cable Size 3x120 sqmm
11 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x120 sqmm
33 KV XLPE Cable Size 3x185 sqmm
33 KV XLPE Cable Size 3x300 sqmm
The work of digging of pits, erection of Stay Clamp, Insulator etc.
Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms.
Installation of 11 KV Pilfer Proof Metering Cubicle in metering room complete in all respect.
Installation of 33 KV Pilfer Proof Metering Cubicle in metering room complete in all respect.
Mounting of Following Capacity Transformers as per norms complete in all respect -
25 KVA T/F
63 KVA T/F
100 KVA T/F
Fixing of Distribution Box complete in all respect.
Guarding at road crossing complete in all respect.
The following Decentralized material shall be provided by the contractor for execution of work as per RESPO Norms (the material shall be purchased from approved vendor of Discom).
T off Clamp
LT Clamp for PCC Pole
LT clamp for STP Pole
X-arm holding clamp
F clamp for STP Pole
F clamp for PCC Pole
Nut and Bolt
Safe back carriage of Scrap (if any) from work site to Nawada store Budaun approx distance upto 60 Km including safe loading & unloading.
M/S RAHAT & BROTHERS ELECTRICALS
SHIV TRADERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .