Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 CrAdmitted-Finance 1 VISHWAS NAGAR PO NFL GONIANA ROAD BATHINDA PUNJAB 151003 | BATHINDA | PUNJAB | 151003 | ₹1.7 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical 3 GHA 10 VIGYAN NAGAR KOTA | KOTA | KOTA | RAJASTHAN | - | - | Rejected-Technical AS per PC-I |
| Sl No | Description | Qty | Unit | Gill Engineering Pvt. Ltd. L2 | Alex Engineering L1 |
|---|---|---|---|---|---|
| 1.00Providing assistance in operation of the entire dry fly ash system of ECO, APH, ESP, ISH, Stack Hopper and all equipment including water system for slurrification round the clock in three shifts, which includes transportation of workmen. Minimum manpower required as per section - C (Scope of work) | |||||
| 1.01 | (Fore man/ Supervisor/PLC operator) ( 3 person per shift) | 9 | Per Person | 500 ₹28.0 L | 500 ₹26.2 L |
| 1.02 | Skilled fitter/ Electrician/ Electronics field operator ( 9 person per shift)- | 27 | Per Person | 309 ₹59.3 L | 309 ₹56.7 L |
| 1.03 | Semi skilled ( 3 person per shift) | 9 | Per Person | 297 ₹19.3 L | 297 ₹18.4 L |
| 1.04 | Unskilled ( 3 person per shift) | 9 | Per Person | 285 ₹18.9 L | 285 ₹18.0 L |
| 2.00Daily routine checking / preventive / minor breakdown maintenance work of dry fly ash handling system of ECO, APH, ESP,ISH, Stack Hopper, all equipments including water system for slurrification in General shift occcured during operation . It also includes transporation of work men. Minimum manpower required. | |||||
| 2.01 | Traineed Engineer (degree Holder) | 2 | Per Person | 600 ₹7.1 L | 600 ₹6.7 L |
| 2.02 | Skilled fitter/ Electrician | 5 | Per Person | 309 ₹11.0 L | 309 ₹10.5 L |
| 2.03 | Semi skilled | 6 | Per Person | 297 ₹12.9 L | 297 ₹12.3 L |
| 2.04 | Unskilled | 6 | Per Person | 285 ₹12.6 L | 285 ₹12.0 L |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
1 Dec 2025, 1:00 pmClosed
CE,CSCTPP,CHHABRA
O/o CE,CSCTPP,CHHABRA
Annual Contract for routine, breakdown, capital maintenance work and providing assistance in operation of Dense Phase Dry Fly Ash Handling System of Unit 5 and 6(2x660MW), CSCTPP, RVUNL,CHHABRA.
2025_RRVUN_514093_1
TN-SC-W-52/2025-26(AHP)
Open Tender
Repair and Maintenance Works
365 days
CSCTPP Chhabra
as per tender document
2 documents required · 2 mandatory
₹2,360
Account Officer,CSCTPP,Chhabra
₹3.0 L
30 Jan 2026
20 Nov 2025
2 Dec 2025
20 Nov 2025
1 Dec 2025
20 Nov 2025
Providing assistance in operation of the entire dry fly ash system of ECO, APH, ESP, ISH, Stack Hopper and all equipment including water system for slurrification round the clock in three shifts, which includes transportation of workmen. Minimum manpower required as per section - C (Scope of work)
(Fore man/ Supervisor/PLC operator) ( 3 person per shift)
Skilled fitter/ Electrician/ Electronics field operator ( 9 person per shift)-
Semi skilled ( 3 person per shift)
Unskilled ( 3 person per shift)
Daily routine checking / preventive / minor breakdown maintenance work of dry fly ash handling system of ECO, APH, ESP,ISH, Stack Hopper, all equipments including water system for slurrification in General shift occcured during operation . It also includes transporation of work men. Minimum manpower required.
Traineed Engineer (degree Holder)
Skilled fitter/ Electrician
Semi skilled
Unskilled
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE { Part B&C of G- Schedule } (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Annual contract for routine, breakdown, capital maintenance work and providing assistance in operation of Dense Phase Dry Fly Ash Handling System of Unit-#5 (660MW), CSCTPP, RVUNL,CHHABRA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
TN52.pdf
Tender Documents • 24.11 MB
BOQ_917002.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid