Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-Finance 3 140 H 1 PERIYAR STREET AMMAN NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 1 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹4,400
Closing Date
25 Feb 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I CA CWS II Overhauling of 20 Nos flow control valve complete assembly and renewal of its worn out components and patch welding of FVC nozzle pipe in cooling Tower III of stage II during annual overhaul 2021 22
2021_EB_197481_1
SE / M-I / MTPS-I / CA / OT. 406 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹4,400
Yes
3 Mar 2021
19 Feb 2021
26 Feb 2021
19 Feb 2021
25 Feb 2021
19 Feb 2021
Amount
Charges for dismantling the existing Sun Shield roof with structure provided over the flow control valve in Cooling Tower and place the roof structure on the fan floor to facilitate for O/H of flow control valve and re-erect the Sun shield roof with structure including the cost of screws for mounting sun shield roofing sheets.
Charges for the existing half round S.S. wire mesh with the frame structure of two halves of condenser ball catcher assembly provided over the flow control valve in Cooling Tower and dismantling and place the C.B. catcher assembly on the fan floor to facilitate for O/H of flow control valve and reassembly the condenser ball catcher assembly over the FCV.
Charges for dismantling of existing deteriorated 500 mm dia Disc type angular valve assembly from respective hot water pipe nozzle, cleaning the pipe nozzle flange surface, lifting, positioning, and reassembling the valve.
Charges for dismantling, cleaning & examining of valve internal components and renewal of other worn out components such as spindle support with bush / disc support M.S. bush by cutting, removing and welding with new M.S. bush, removing the existing damaged & worn outrubber seal of the disc, cleaning and fixing the new rubber seal over the disc by using proper adhesives if necessary, and reassembling and re-commissioning of the valves in the hot water pipe lines of cooling tower III.
Charges for patch welding includes marking, cutting and bending the MS plate of 0.5mX0.5mX8 mm thick edge preparation and welding in FCV nozzle pipe in Hot water header Line of Cooling tower III (East side 3,4,7 – 3 Nos and West side 7,8,9 - 3 Nos)
Charges for Material cost for Sl.No. 1 to 4
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .