Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹2.3 CrAccepted-AOC AMBALA CANTT | ₹2.3 Cr | 1st | Accepted-AOC 1st |
| 2 | 2nd₹2.7 Cr+₹37.7 L (16.3%)Rejected-AOC H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | ₹2.7 Cr+₹37.7 L (16.3%) | 2nd | Rejected-AOC 2nd |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
23 Aug 2024, 3:00 pmClosed
SANJEEV KUMAR TYAGI
Hisar PHED No. 1
Sabarwas DNIT for Renovation Upgradation of water works structures and laying of old AC PVC lines in village Sabarwas Distt. Hisar
2024_HRY_398249_1
2024B1647729 C4E1 419A B0E7 FA7C8037E91A564PUH
Open Tender
Civil Works
Works
800 days
SABARWAS
Sabarwas DNIT for Renovation Upgradation of water works structures and laying of old AC PVC lines in village Sabarwas Distt Hisar
3 documents required · 3 mandatory
₹15,000
₹3.1 L
Yes
11 Mar 2025
8 Aug 2024
23 Aug 2024
8 Aug 2024
23 Aug 2024
8 Aug 2024
8 Aug 2024 - 23 Aug 2024
Amount
WTP: Design and construction of 0.50 MLD capacity automated PLC controlled water treatment plant including interconnecting DI pipe from raw water pump to inlet box of WTP, CWT and Suction Well for CW , inlet channel, Alum dozing, Flash mixing, Clari floculator, filter box, over head Reservoir for back wash including pump sets and electric control panel, waste water tank including pump sets and electric control panel, DI pipes, DI specials, manhole covers, air scour equipment, chemical house including chlorination equipment and all other civil / mechanical / electric installations complete in all respects as per DNIT (Sluice valves of make IVC/VAG) 0.50 MLD CAPACITY
RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head 12.00 m as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked` 5. Discharge capacity (LPM) 700 Power capacity (BHP) 5
Operation and Maintenance for complete scope of work of 0.50 MLD WTP mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
Kulbir Singh Contractor (GSTN-06ATZPS6352H1ZW) BID ID -1147078
SANDEEP KUMAR CONTRACTOR (GSTN-NA) BID ID -1147120
Kulbir Singh Contractor (BID ID -1147078)
Kulbir Singh Contractor (BID ID -1147078)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .