Tender Value
₹9.7 L
EMD Value
₹19,450
Closing Date
25 Aug 2026, 12:00 pmDue tomorrow
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Construction of Drainage Crossing at Km. 2.600 of Mohanpur minor and km 0.800 of Triveni minor. (Lot-12)
2026_UPIDC_1175409_12
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
120 days
Distt Hamirpur
AS PER NIT
2 documents required · 2 mandatory
₹854
₹19,450
10 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | E/W Excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. | 539.02 | Cum | 119.5 | ₹64,412.89 |
| 2 | Supplying & Laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work. | 20.33 | Cum | 1,841.29 | ₹37,433.43 |
| 3 | Laying C.C. 1:3:6 in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 53.61 | Cum | 4,237.22 | ₹2,27,157.36 |
| 4 | Laying C.C. 1:2:4 in top of stone masonry with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 4.18 | Cum | 5,092.64 | ₹21,287.24 |
| 5 | Laying RCC hume pipe 600 mm | 42.5 | RM | 2,201.72 | ₹93,573.1 |
| 6 | R.C.R. Stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc required for completion of work. | 61.44 | Cum | 4,823.3 | ₹2,96,343.55 |
| 7 | Cement pointing 1:2 on stone masonry all cost of labour material T&P etc required for completion of work. | 149.85 | Sqm | 124.85 | ₹18,708.77 |
| 8 | Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc required for completion of work. | 187.72 | Sqm | 817 | ₹1,53,367.24 |
| 9 | Supplying & Laying Filter materials 20mm gauge including cost of material labour T&P Etc with all leads & lifts for proper completion of Job | 5.37 | Cum | 2,056.63 | ₹11,044.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
NIT02.pdf
Tender Documents • 3.60 MB
BOQ_2208977.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].