Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹15.6 L
Closing Date
17 Sept 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tata Power Delhi Distribution Limited
2 Year Rate Contract (RC) for Replacement of old and obsolete 66/33/11kV relays & other IEDs
200001996
TPDDL/ENGG/ENQ/200001996/26-27
Delhi
1. The bidder/OEM should have an average annual turnover of Rs. 20 crores in last 3 financial years. Copy of audited P&L Account to be submitted in this regard. 2. The bidder/OEM should have supplied & executed 100 Nos Numerical Relays during last 3 years. Copy of work order / completion certificate to be submitted in this regard. 3. The bidder/ OEM should have performance certificates for similar works for 2 years satisfactory performance from at least 2 reputed companies for similar or higher rating. The work against these issued certificates should be completed in last seven years from the date of bid submission. In case the bidder has a previous association with Tata Power-DDL for similar products and services, the performance feedback for that bidder by Tata Power DDL’s User Group shall only be considered irrespective of performance certificates issued by any third organization. 4. Bidder/OEM should have the In-house testing facilities for acceptance test as per TPDDL specifications. Bidder must submit undertaking in this regard. 5. The Bidder must have all Statutory Compliance like Valid PAN, ESI registration, EPF registration & GSTN Registration.
₹5,000
₹15.6 L
27 Aug 2026
27 Aug 2026
Supplier Sustainability Index — Questionnaire, Tracker & Dashboard
Tata Power Delhi Distribution Limited
How this workbook works
This workbook has four connected sheets. Fill in ONE sheet — the questionnaire — and the rest update themselves automatically:
1. Questionnaire Form — a single, fillable copy of the questionnaire: vendor details at the top, then every question as its own card with selectable options, a remark field, and a Declaration at the end.
2. Response Log — the database. Row 3 is a live mirror of whatever is currently on the Form (it updates as you type). This is how the Form's answers reach the log and the Dashboard automatically.
3. Dashboard — a one-page overview (KPIs, charts, top/bottom performers) that reads from the Response Log, so it always reflects everything entered so far, including the current draft.
4. Scoring Key — not included in this version; the full question and option text already appears directly on the Form.
Selecting an option
Each option has a small ✓ column next to it. Click that cell, click the small dropdown arrow that appears, then click ✓ to select that option. To deselect, click the cell and press Delete. If a question is locked, or a single-choice question already has a different option selected, the dropdown will only offer "🔒 Locked" instead of ✓ — and if you try to force ✓ in anyway by typing it, Excel will show an error and REJECT the entry outright; the cell will not change. For single-choice questions, once one option is selected the others are blocked until you deselect it first. For multi-select questions, you may choose more than one (Q16 is capped at 5, per the Development Guidance) — Excel rejects any selection beyond what's allowed with an on-screen error. Remark and free-text response fields use the same locking, but since they hold arbitrary text rather than a fixed choice, they don't have a dropdown — typing into a locked one is simply rejected.
IMPORTANT — always use the dropdown arrow, never copy/paste
Excel enforces validation strictly when you type or use the dropdown, but its enforcement on PASTE is weaker — pasting a checkmark copied from elsewhere can sometimes slip through even into a locked cell, bypassing the block entirely. This is a limitation of Excel itself, not something a workbook can fully close without macros. Always click the dropdown arrow and click ✓ from the list, rather than copying and pasting a checkmark. If you ever find a locked question shows a score or lets you proceed unexpectedly, check whether a checkmark was pasted in rather than selected from the dropdown, and also press F9 (or Formulas → Calculate Now) to make sure the sheet has recalculated.
If locking doesn't seem to update
This workbook is set to calculate automatically, but if your organization's Excel has calculation forced to Manual (Formulas tab → Calculation Options), locks and scores will only update when you press F9. If something looks wrong, press F9 first before assuming there's a fault.
Questions must be completed in order
You cannot answer questions out of sequence — this is hard-enforced, not just a visual hint. Every option cell in a locked question is restricted so ✓ simply isn't a choice you can make until every question before it is fully answered (including any required remark). Vendor & Contact Details must be filled in first — no question unlocks before that. If you go back and change or clear an earlier answer, later questions re-lock automatically (their cells stop accepting ✓, and their score drops to 0) until that answer is completed again — nothing already entered is lost, it simply won't count or be editable until the sequence is valid again.
Remarks and scoring
Some options require a Remark (marked with * and shown in amber) — this is driven by TPDDL's published Development Guidance. If a remark is required and left blank, that question's score is withheld (shown as 0) until the remark is filled in, and a warning note appears under the Score. A question with a required remark also won't count as "answered" for unlocking the next question until that remark is filled in.
Declaration and submitting
At the end of the Form: enter who you're signing on behalf of, your name and designation. Ticking the declaration ✓ is mandatory. Once every question is unlocked and answered and the declaration is ticked, the status line turns green (✅ Complete). At that point, use File → Export → Create PDF/XPS Document (or File → Print → Save as PDF) to save a PDF copy — that's your record to keep and to email as your submission. A one-click in-sheet "Submit" button would require a macro-enabled file, which this workbook is not (see note below); this manual export is the reliable equivalent.
This is a plain .xlsx file, not a macro-enabled .xlsm. A genuine one-click "circular button" toggle, a one-click Submit-and-clear action, and a true floating Slicer widget all require VBA macros running inside Excel itself, which can't be authored by the tool used to generate this file. Everything above — hard sequential locking, single-choice exclusivity, the 5-option cap, remark-gated scoring — is real, tested enforcement built entirely from formulas and data validation, without needing macros.
Workflow for each supplier
1. Fill in the Form from top to bottom, in order, finishing with the Declaration.
2. Export the completed Form to PDF (see above) for your records / to email.
3. On 'Response Log', row 3 already mirrors this submission. To keep it permanently: select row 3, copy it, then Paste Special → Values into the next empty row below (row 4, 5, 6…).
4. Clear the Form (delete the input cells) to start the next supplier. The Response Log and Dashboard keep every archived row.
Standard Excel (no macros) can't automatically "save and clear" a form with one click — that needs a macro-enabled file, which carries its own security prompts for recipients. The copy/paste-values step takes a few seconds per supplier and keeps this workbook simple and safe to email around. If you'd prefer a one-click macro (.xlsm) version instead, that can be built separately.
Filtering submissions
On 'Response Log', use the filter arrows in the header row (row 2) to filter by Vendor Name, Vendor Code, Year, or Month (Year/Month are derived automatically from the Date column). This gives the same result as a Slicer. If you'd like an actual floating Slicer widget, select the data as a Table (Insert → Table) and then Insert → Slicer in Excel — that's a native Excel feature you can add yourself in a couple of clicks; it isn't something this file-generation tool can pre-build.
Adding entries directly to the Response Log
You can also skip the Form and type/paste a submission straight into a new Response Log row — single-choice questions have dropdowns, multi-select questions accept comma-separated letters (e.g. a,c). All scoring formulas (including the remark-gating) are already built into every row. Note: the sequential lock only applies on the Form; rows typed directly into the log are treated as already-complete submissions.
• 1 historical rows are pre-built with formulas on the Response Log. To go beyond that, select the last row and drag-fill the formula/validation cells down.
• Maximum possible score is 200 (Environment 100 · Social 50 · Governance 50).
• The 36 question-column groups on the Response Log are collapsed by default (click '+' above the headers to expand) so the sheet stays readable.
SUPPLIER SUSTAINABILITY INDEX QUESTIONNAIRE
Tata Power Delhi Distribution Limited · Environment 100 pts · Social 50 pts · Governance 50 pts · Total 200 pts
Fill in your organization's details first (required before any question unlocks). Then answer every question in order — click a cell in the ✓ column, click the small dropdown arrow, then click ✓ to select that option (press Delete to deselect). Use the dropdown arrow to select; do not copy/paste a checkmark. If a selected option requires a remark, the next question remains locked until the remark is entered. Invalid or locked selections show an Excel error.
VENDOR & CONTACT DETAILS
ENVIRONMENT › Carbon Footprint (Max 20 pts)
Q1. Does your organization calculate GHG emissions? Max 5 pts FALSE
a) Yes, we calculate the GHG emissions and data is available since FY ____ [remark required if selected] 5 🔒
b) No, but we have plans to start GHG inventorization from FY ____ [remark required if selected] 2 🔒
c) No, we do not compute GHG emissions, nor do we have any plans in the near future to do so 0 🔒
Remark FALSE C24
Score 0 / 5 pts
Q2. Which GHG emissions has your organization computed, and what is their value? Max 10 pts FALSE
a) Scope-1 (Direct GHG emissions from sources owned or controlled by the organization); Emissions for FY ____: ____ [remark required if selected] 4 🔒
b) Scope-2 (Indirect GHG emissions from generation of purchased electricity, steam, heating, cooling); Emissions for FY ____: ____ [remark required if selected] 4 🔒
c) Scope-3 (Indirect emissions upstream/downstream of the value chain, i.e. with purchasers and suppliers); Emissions for FY ____: ____ [remark required if selected] 2 🔒
d) None of the above 0 🔒
Remark FALSE C36
Score 0 / 10 pts
Q3. Has your organization set targets & programs to reduce carbon footprint in its overall logistics operation? Max 5 pts FALSE
a) Yes, our organization has set targets and programs to reduce carbon footprint 5 🔒
b) No, our organization does not have set targets and programs to reduce carbon footprint 0 🔒
c) Partially, our organization has some initiatives but no specific targets or programs in place 3 🔒
d) Unsure / Not applicable 0 🔒
Remark FALSE C49
Score 0 / 5 pts
ENVIRONMENT › Energy Consumption and Efficiency (Max 10 pts)
Q4. How does your organization manage and optimize energy consumption? Max 5 pts FALSE
a) We regularly conduct energy audits and implement energy-efficient technologies 2 🔒
b) We have designated energy management teams to monitor and improve energy usage 1 🔒
c) We actively promote energy-saving practices and provide employee training on energy conservation 1 🔒
d) We have implemented automated systems to track and control energy consumption 1 🔒
e) Our organization does not have specific measures in place to manage or optimize energy consumption 0 🔒
Remark FALSE C61
Score 0 / 5 pts
Q5. Does the organization monitor Stack Emissions (source specific) and/or Ambient Air Emissions (area wide) in its premises? Max 5 pts FALSE
a) Yes, the organization regularly monitors both Stack and Ambient Air Emissions 5 🔒
b) Yes, the organization monitors Stack Air Emissions only 3 🔒
c) Yes, the organization monitors Ambient Air Emissions only 3 🔒
d) No, the organization does not monitor Stack or Ambient Air Emissions 0 🔒
Remark FALSE C72
Score 0 / 5 pts
ENVIRONMENT › Waste Management / Packaging (Max 10 pts)
Q6. What are the different categories of waste which your organization generates? Max 5 pts FALSE
a) Hazardous Waste and/or Battery Waste 1 🔒
b) Plastic Waste 1 🔒
c) Metal Waste 1 🔒
d) Biomedical Waste 1 🔒
e) Municipal Solid Waste & other waste streams 1 🔒
f) None of the above 0 🔒
Remark FALSE C85
Score 0 / 5 pts
Q7. Does your organization have a process to recycle these waste categories, either in-house or through an external agency? Max 2 pts FALSE
a) Yes, all types of waste generated by us is recycled 2 🔒
b) Yes, ____% of our waste goes for recycling [remark required if selected] 1 🔒
c) We are not aware if any of our waste is recycled 0 🔒
Remark FALSE C95
Score 0 / 2 pts
Q8. How does the organization incorporate packaging reduction, reuse, and recycling in its purchasing practices? Max 3 pts FALSE
a) We actively seek suppliers who offer minimal packaging or sustainable packaging options 1 🔒
b) We prioritize reusable packaging solutions when available and feasible 1 🔒
c) We have established policies to encourage recycling of packaging materials 1 🔒
d) Our organization does not specifically address packaging reduction, reuse, or recycling in purchasing practices 0 🔒
Remark FALSE C107
Score 0 / 3 pts
ENVIRONMENT › Water Management (Max 15 pts)
Q9. Has your organization set specific targets to reduce water consumption? Max 3 pts FALSE
a) Yes, our organization has set specific targets to reduce water consumption 3 🔒
b) Our organization has some standalone initiatives to reduce water consumption, but no specific targets are set 2 🔒
c) No standalone initiatives or targets are there to reduce water consumption 0 🔒
Remark FALSE C118
Score 0 / 3 pts
Q10. Do you have a functional Rainwater Harvesting System at your facility? Max 2 pts FALSE
a) Yes, with a capacity of ____ KLD in ____ sqm of catchment area [remark required if selected] 2 🔒
b) No, but we have plans to put an RWH system by ____ [remark required if selected] 1 🔒
c) No, we do not have any plans of putting up RWH in our premises 0 🔒
Remark FALSE C128
Score 0 / 2 pts
Q11. What is the source-wise consumption of water in your organization? Max 7 pts FALSE
a) Underground Borewell approved by local authority; ____ KL [remark required if selected] 1 🔒
b) Underground Borewell not approved by local authority; ____ KL [remark required if selected] 1 🔒
c) Piped Municipal water supply; ____ KL [remark required if selected] 1 🔒
d) Water Tanker; ____ KL [remark required if selected] 1 🔒
e) Packaged Drinking Water; ____ KL [remark required if selected] 1 🔒
f) Treated Waste Water; ____ KL [remark required if selected] 2 🔒
g) Water consumption is not monitored in our organization 0 🔒
Remark FALSE C143
Score 0 / 7 pts
Q12. Do you have any waste water treatment facility in your organization? Max 3 pts FALSE
a) Yes, we have a waste water treatment facility of ____ KLD [remark required if selected] 3 🔒
b) No, we do not have a waste water treatment facility 0 🔒
Remark FALSE C154
Score 0 / 3 pts
ENVIRONMENT › Innovation for Sustainability (Max 20 pts)
Q13. How is your organization fostering innovation to address sustainability challenges? Max 10 pts FALSE
a) By investing in internal R&D initiatives focused on sustainability 2 🔒
b) By establishing cross-functional teams dedicated to innovation in sustainability 2 🔒
c) By partnering with external stakeholders such as startups, research institutions, or NGOs 2 🔒
d) By encouraging employee-led sustainability projects and ideas 2 🔒
e) By participating in industry collaborations or consortia focused on sustainability innovation 2 🔒
f) Unsure / Not applicable 0 🔒
Remark FALSE C169
Score 0 / 10 pts
Q14. Please share examples in support of the above. Max 10 pts FALSE
a) Example 1 (please describe fully in the Remark field below) [remark required if selected] 5 🔒
b) Example 2 (please describe fully in the Remark field below) [remark required if selected] 5 🔒
c) None of the above 0 🔒
Remark FALSE C178
Score 0 / 10 pts
ENVIRONMENT › Continuous Improvement (Max 15 pts)
Q15. Has your organization set specific ESG targets, and how are they monitored? Max 5 pts FALSE
a) Yes, our organization has set specific ESG targets, monitored through regular performance assessments via well-defined KPIs 5 🔒
b) Partial - while we do not have specific targets, we monitor key parameters related to ESG 2 🔒
c) No, our organization has not set any specific ESG targets 0 🔒
Remark FALSE C191
Score 0 / 5 pts
Q16. How does your organization engage in continuous improvement in sustainability practices? Max 5 pts FALSE
a) By conducting regular sustainability audits and assessments 1 🔒
b) By implementing feedback mechanisms from stakeholders on sustainability initiatives 1 🔒
c) By setting and reviewing sustainability goals on a regular basis 1 🔒
d) By participating in sustainability-focused training and education programs 1 🔒
e) By benchmarking against industry best practices on sustainability 1 🔒
f) By integrating sustainability considerations into decision-making processes 1 🔒
g) Other (please specify in Remark field) [remark required if selected] 1 🔒
Remark FALSE C204
Score 0 / 5 pts
Q17. Has the organization taken any initiative(s) to improve the Recyclability Ratio of its products (End of Life Treatment) to reduce the impact of manufactured products on the environment and society? Max 5 pts FALSE
a) Yes (please share the details in the Remark field) [remark required if selected] 5 🔒
Remark FALSE C215
Score 0 / 5 pts
ENVIRONMENT › Renewable Energy (Max 10 pts)
Q18. Has your organization installed solar panels in the facility for renewable power generation? Max 4 pts FALSE
a) Yes, for ____ KW [remark required if selected] 4 🔒
b) No, but we purchase solar power from outside 2 🔒
c) No, we do not have solar power in our energy mix 0 🔒
Remark FALSE C228
Score 0 / 4 pts
Q19. Please provide the % share of solar in overall energy consumption (if your response to the previous question is 'Yes'). Max 1 pts FALSE
✎ Response FALSE D235
Not applicable — you answered No/other in Q18, so this field is skipped.
Score 0 / 1 pts
Q20. Are you using Electric Vehicles in your organization's setup? Max 4 pts FALSE
a) Yes, we have ____ nos. of EVs deployed [remark required if selected] 4 🔒
b) No, we do not have any EV in our setup 0 🔒
Remark FALSE C246
Score 0 / 4 pts
Q21. In case your response to the previous question is 'Yes', please share the details of EVs deployed in your organization's setup with respect to type of usage, etc. Max 1 pts FALSE
✎ Response FALSE D253
Not applicable — you answered No/other in Q20, so this field is skipped.
Score 0 / 1 pts
SOCIAL › Labor Practices (Max 20 pts)
Q22. How does your organization ensure fair wages, working hours, and safe working conditions? Max 10 pts FALSE
a) By implementing regular wage reviews and adjustments to ensure fair compensation 2 🔒
b) By adhering to legal regulations and industry standards regarding working hours 2 🔒
c) By conducting regular workplace inspections and safety audits to maintain safe working conditions 2 🔒
d) By providing training and education on labor rights and safety protocols to employees 1 🔒
e) By establishing grievance mechanisms for employees to report concerns about wages or working conditions 2 🔒
f) By collaborating with labor unions or worker advocacy groups to address labor-related issues 1 🔒
g) None of the above 0 🔒
Remark FALSE C269
Score 0 / 10 pts
Q23. Does your organization have an Internal Review Committee and policies to ensure the workplace is free of physical abuse, corporal punishment, physical contact with intent to injure or intimidate, and disciplinary measures that cause physical discomfort? Max 5 pts FALSE
a) Yes, our organization has an Internal Review Committee and policies in place to ensure the workplace is free from physical abuse and corporal punishment 5 🔒
b) Yes, our organization has policies in place, but there is no specific Internal Review Committee 3 🔒
c) No, our organization does not have specific policies or an Internal Review Committee addressing physical abuse and corporal punishment 0 🔒
Remark FALSE C279
Score 0 / 5 pts
Q24. Can you provide information on diversity, equity, and inclusion within your workforce? Max 5 pts FALSE
a) Yes, our organization actively collects and reports data on diversity, equity, and inclusion metrics within our workforce 5 🔒
b) Yes, our organization has implemented initiatives/programs to promote DEI, but does not currently collect or report data 3 🔒
c) No, our organization does not have specific initiatives or programs focused on DEI within our workforce 0 🔒
Remark FALSE C289
Score 0 / 5 pts
SOCIAL › Supply Chain Labor Standards (Max 10 pts)
Q25. How do you ensure that your suppliers adhere to fair labor practices? Max 5 pts FALSE
a) By conducting regular audits or assessments of suppliers' labor practices 1 🔒
b) By requiring suppliers to sign agreements or contracts that include provisions for fair labor practices 1 🔒
c) By providing training and guidance to suppliers on fair labor standards and expectations 1 🔒
d) By engaging with suppliers in dialogue and collaboration to address any issues related to fair labor practices 1 🔒
e) By sourcing from suppliers with recognized certifications or accreditations related to fair labor practices 1 🔒
f) None of the above 0 🔒
Remark FALSE C302
Score 0 / 5 pts
Q26. What steps are taken to address human rights issues in your supply chain? Max 5 pts FALSE
a) Regular audits or assessments of suppliers' human rights practices 1 🔒
b) Requiring suppliers to adhere to codes of conduct or standards that include human rights provisions 1 🔒
c) Providing training and guidance to suppliers on human rights standards and expectations 1 🔒
d) Engaging with suppliers in dialogue and collaboration to address human rights issues 1 🔒
e) Sourcing from suppliers with recognized certifications or accreditations related to human rights practices 1 🔒
f) None of the above 0 🔒
Remark FALSE C314
Score 0 / 5 pts
SOCIAL › Community Engagement (Max 20 pts)
Q27. To promote social responsibility in its value (supply) chain, is there any visible commitment from Top Management to integrate ESG criteria under a Responsible Supply Chain Policy/Program (Ethical, Social, Environmental, Gender Equality, Health & Safety, etc.) in its purchasing, distribution and contracting policies? Max 10 pts FALSE
a) Yes, there is visible commitment from Top Management to integrate ESG criteria into a Responsible Supply Chain Policy/Program 10 🔒
b) Partially, there is some commitment from Top Management, but not all aspects of ESG criteria are integrated 5 🔒
c) No, there is no visible commitment from Top Management to integrate ESG criteria into a Responsible Supply Chain Policy/Program 0 🔒
Remark FALSE C325
Score 0 / 10 pts
Q28. Describe your organization's initiatives for supporting local communities where you operate. Max 10 pts FALSE
a) We actively participate in community outreach programs and events 2 🔒
b) We contribute to local charities or nonprofits through donations or volunteer work 2 🔒
c) We collaborate with local stakeholders to address community needs and concerns 2 🔒
d) We provide employment opportunities and skill development programs for community members 2 🔒
e) We sponsor or support local educational or environmental initiatives 2 🔒
f) None of the above 0 🔒
Remark FALSE C337
Score 0 / 10 pts
GOVERNANCE › Ethics and Anti-Corruption (Max 20 pts)
Q29. Does the organization measure the total number of substantiated complaints received concerning breaches of customer privacy? Max 5 pts FALSE
a) Yes, it is measured — there were ____ nos. in FY ____ [remark required if selected] 5 🔒
b) No, it is not measured 0 🔒
Remark FALSE C347
Score 0 / 5 pts
Q30. Does the organization measure the total number of identified leaks, thefts, or losses of customer data? Max 5 pts FALSE
a) Yes, it is measured — there were ____ nos. in FY ____ [remark required if selected] 5 🔒
b) No, it is not measured 0 🔒
Remark FALSE C358
Score 0 / 5 pts
Q31. How does your organization prevent and address corruption risks? Max 5 pts FALSE
a) By implementing robust anti-corruption policies and procedures 1 🔒
b) By conducting regular training on anti-corruption measures for employees 1 🔒
c) By establishing clear channels for reporting corruption concerns 1 🔒
d) By conducting periodic risk assessments to identify and mitigate corruption risks 1 🔒
e) By collaborating with law enforcement agencies or regulatory bodies to address corruption issues 1 🔒
f) None of the above 0 🔒
Remark FALSE C372
Score 0 / 5 pts
Q32. Has the organization established a Code of Business Ethics, endorsed by senior management, indicating the organization's values, principles, standards, and norms of behavior? Max 5 pts FALSE
a) Yes, our organization has established a Code of Business Ethics endorsed by senior management 5 🔒
b) No, not yet, but we plan to introduce it by FY ____ [remark required if selected] 2 🔒
c) No, and we have no immediate plans for the same 0 🔒
d) Unsure / Not applicable 0 🔒
Remark FALSE C383
Score 0 / 5 pts
GOVERNANCE › Transparency and Reporting (Max 15 pts)
Q33. How does your organization communicate its ESG efforts to stakeholders? Max 5 pts FALSE
a) Through regular reports or publications dedicated to ESG initiatives 1 🔒
b) By hosting stakeholder meetings or forums specifically focused on ESG topics 1 🔒
c) Via dedicated sections on the company website or sustainability reports 1 🔒
d) Through social media platforms or other digital communication channels 1 🔒
e) By participating in industry conferences or events focused on sustainability 1 🔒
f) None of the above 0 🔒
Remark FALSE C398
Score 0 / 5 pts
Q34. Is there a well-established governance structure for regulating/governing its policies? Max 5 pts FALSE
a) Yes, there is a well-established governance structure in place 5 🔒
b) Partially, there is some governance structure, but it's not well-established 3 🔒
c) No, but we intend to establish the same by FY ____ [remark required if selected] 1 🔒
d) No, and we have no plans to establish the same in the near future 0 🔒
Remark FALSE C409
Score 0 / 5 pts
Q35. Are all labor, health, and safety policies, practices, and expectations communicated to all employees and suppliers in local or appropriate languages? Max 5 pts FALSE
a) Yes, all policies, practices, and expectations are communicated in local or appropriate languages 5 🔒
b) Partially, some are communicated in local or appropriate languages, but not all 3 🔒
c) No, not all policies, practices, and expectations are communicated in local or appropriate languages 0 🔒
Remark FALSE C421
Score 0 / 5 pts
GOVERNANCE › Certifications (Max 15 pts)
Q36. Does your organization have the following certifications (valid till date — please mention validity)? Max 15 pts FALSE
a) ISO 9001 accreditation 1 🔒
b) ISO 20400:2017 or equivalent 5 🔒
c) SA 8000 or equivalent 4 🔒
d) ISO 14001 certification 2 🔒
e) ISO 18001 / 45001 or equivalent 1 🔒
f) ISO/IEC 27001 or equivalent 1 🔒
g) Other (please specify in Remark field) [remark required if selected] 1 🔒
h) None of the above 0 🔒
Remark FALSE C436
Score 0 / 15 pts
Carbon Footprint 0 / 20 pts
Energy Consumption and Efficiency 0 / 10 pts
Waste Management / Packaging 0 / 10 pts
Water Management 0 / 15 pts
Innovation for Sustainability 0 / 20 pts
Continuous Improvement 0 / 15 pts
Renewable Energy 0 / 10 pts
Labor Practices 0 / 20 pts
Supply Chain Labor Standards 0 / 10 pts
Community Engagement 0 / 20 pts
Ethics and Anti-Corruption 0 / 20 pts
Transparency and Reporting 0 / 15 pts
Certifications 0 / 15 pts
Environment Total 0 / 100 pts
Social Total 0 / 50 pts
Governance Total 0 / 50 pts
TOTAL SCORE 0 / 200 pts (0.0%)
On behalf of (Company Name)
I, the undersigned, confirm that the information provided in this questionnaire is true and accurate to the best of my knowledge, and may be verified by Tata Power Delhi Distribution Limited. * 🔒
⚠ Not yet complete — finish all questions and tick the declaration above
Next step: once the status above shows ✅ Complete, go to File → Export → Create PDF/XPS Document (or File → Print → Save as PDF) to save a PDF copy of this questionnaire — for your own records and to email to Tata Power Delhi Distribution Limited as your submission.
Vendor & Declaration Q1. Does your organization calculate GH… Q2. Which GHG emissions has your organi… Q3. Has your organization set targets &… Q4. How does your organization manage a… Q5. Does the organization monitor Stack… Q6. What are the different categories o… Q7. Does your organization have a proce… Q8. How does the organization incorpora… Q9. Has your organization set specific … Q10. Do you have a functional Rainwater … Q11. What is the source-wise consumption… Q12. Do you have any waste water treatme… Q13. How is your organization fostering … Q14. Please share examples in support of… Q15. Has your organization set specific … Q16. How does your organization engage i… Q17. Has the organization taken any init… Q18. Has your organization installed sol… Q19. Please provide the % share of solar… Q20. Are you using Electric Vehicles in … Q21. In case your response to the previo… Q22. How does your organization ensure f… Q23. Does your organization have an Inte… Q24. Can you provide information on dive… Q25. How do you ensure that your supplie… Q26. What steps are taken to address hum… Q27. To promote social responsibility in… Q28. Describe your organization's initia… Q29. Does the organization measure the t… Q30. Does the organization measure the t… Q31. How does your organization prevent … Q32. Has the organization established a … Q33. How does your organization communic… Q34. Is there a well-established governa… Q35. Are all labor, health, and safety p… Q36. Does your organization have the fol… Scoring (auto-calculated)
Date Vendor Name Vendor Code Contact Person Mobile Email On Behalf Of Signatory Name Designation Signed (Y/N) Q1 Ans Q1 Remark Q1 Score Q2 Ans Q2 Remark Q2 Score Q3 Ans Q3 Remark Q3 Score Q4 Ans Q4 Remark Q4 Score Q5 Ans Q5 Remark Q5 Score Q6 Ans Q6 Remark Q6 Score Q7 Ans Q7 Remark Q7 Score Q8 Ans Q8 Remark Q8 Score Q9 Ans Q9 Remark Q9 Score Q10 Ans Q10 Remark Q10 Score Q11 Ans Q11 Remark Q11 Score Q12 Ans Q12 Remark Q12 Score Q13 Ans Q13 Remark Q13 Score Q14 Ans Q14 Remark Q14 Score Q15 Ans Q15 Remark Q15 Score Q16 Ans Q16 Remark Q16 Score Q17 Ans Q17 Remark Q17 Score Q18 Ans Q18 Remark Q18 Score Q19 Ans Q19 Remark Q19 Score Q20 Ans Q20 Remark Q20 Score Q21 Ans Q21 Remark Q21 Score Q22 Ans Q22 Remark Q22 Score Q23 Ans Q23 Remark Q23 Score Q24 Ans Q24 Remark Q24 Score Q25 Ans Q25 Remark Q25 Score Q26 Ans Q26 Remark Q26 Score Q27 Ans Q27 Remark Q27 Score Q28 Ans Q28 Remark Q28 Score Q29 Ans Q29 Remark Q29 Score Q30 Ans Q30 Remark Q30 Score Q31 Ans Q31 Remark Q31 Score Q32 Ans Q32 Remark Q32 Score Q33 Ans Q33 Remark Q33 Score Q34 Ans Q34 Remark Q34 Score Q35 Ans Q35 Remark Q35 Score Q36 Ans Q36 Remark Q36 Score Carbon Footprint (20) Energy Consumption and Efficiency (10) Waste Management / Packaging (10) Water Management (15) Innovation for Sustainability (20) Continuous Improvement (15) Renewable Energy (10) Labor Practices (20) Supply Chain Labor Standards (10) Community Engagement (20) Ethics and Anti-Corruption (20) Transparency and Reporting (15) Certifications (15) Environment Total (100) Social Total (50) Governance Total (50) Total Score Max Score Percent Status Year Month
Vendor Code List
Supplier Sustainability Index — Dashboard All
Live overview across every supplier on the Response Log sheet (including the current draft) 0
Vendor Code All Pillar All Status All All
Dashboard results are filtered by the three selections above. Pillar score scale: Environment = 100, Social = 50, Governance = 50; All = 200.
Total Submissions Average Score Average % Highest Score Lowest Score
Status Distribution
Needs Improvement 1
Average Score by Pillar
Pillar Avg Score Max Avg %
Environment 2.0 100 2.0%
Social 0.0 50 0.0%
Governance 0.0 50 0.0%
Average Score by Category
Category Avg Score Max Avg %
Carbon Footprint 0.0 20 0.0%
Energy Consumption and Efficiency 0.0 10 0.0%
Waste Management / Packaging 0.0 10 0.0%
Water Management 0.0 15 0.0%
Innovation for Sustainability 0.0 20 0.0%
Continuous Improvement 0.0 15 0.0%
Renewable Energy 2.0 10 20.0%
Labor Practices 0.0 20 0.0%
Supply Chain Labor Standards 0.0 10 0.0%
Community Engagement 0.0 20 0.0%
Ethics and Anti-Corruption 0.0 20 0.0%
Transparency and Reporting 0.0 15 0.0%
Certifications 0.0 15 0.0%
Top 5 Suppliers by Score Bottom 5 Suppliers by Score
Rank Vendor Score Rank Vendor Score
Annexure-I Schedule of Item (Price Bid)
Tender Enquiry No.: TPDDL/ENGG/ENQ/200001996/26-27
2 Year Rate Contract (RC) for Replacement of old and obsolete 66/33/11kV relays & other IEDs
S. No. Material Code Item Description Material Quantity "A" Unit rate (Rs.) "a" Applicable GST (in Rs.) "b" Price per Unit (in Rs.) "B"= a+b Amount (in Rs.) C=A*B HSN/ SAC code
1 301004715 Supply of 11 kV 220VDC BCPU BCPU 184 0 0 0
2 101000312 Supply of 11 kV 48VDC BCPU BCPU 80 0 0 0
3 301001501 Supply of 33 kV 220VDC BCPU BCPU 6 0 0 0
4 301004263 Supply of 33 kV 48VDC BCPU BCPU 15 0 0 0
5 301004265 Supply of 66 KV 220VDC BCPU BCPU 11 0 0 0
6 101000286 Ethernet switches Ethernet Switches 8 0 0 0
7 301003110 Configration device (laptop) Configration Device 1 0 0 0
8 101000324 LINE DIFFERENTIAL RELAY 220 V LDR 15 0 0 0
9 101000325 LINE DIFFERENTIAL RELAY 50 V LDR 3 0 0 0
11 Secondary Injection Kit Should have: 1) CMC 500 2) Software Module: GOOSE 3) Software Module: Sampled values 4) IEC 61850 Client/Server 5) Transport case for CMC 500 6) Configration device (laptop) Make: Omicron/Megger/Doble Note: Buy Back of old Kit Secondary Injection Kit 1 0 0 0
12 SITC of MCBs MCBs 284 0 0 0
13 ITC of BCPU BCPU 268 0 0 0
14 ITC Ethernet switch Ethernet Switches 8 0 0 0
15 SITC of LIU LIU 14 0 0 0
16 SITC of Armoured FO with HDPE PLB conduit pipe FO 330 0 0 0
17 SITC of Patch chord (ST- LC connector) Patch Chord 66 0 0 0
18 Splicing of MM Fibre cores with LIU Splicing 120 0 0 0
19 ITC OF LDRs LDR 16 0 0 0
TENDER NO: TPDDL/ENGG/ENQ/200001996/26-27
DESCRIPTION: 2 Year Rate Contract (RC) for Replacement of old and obsolete 66/33/11kV relays & other IEDs
TYPE OF TENDER: OPEN TENDER
Last Date of receipt of pre-bid queries, if any
Sr. No. Detailed Reference to Tata Power Technical Document. Please specify Document No / Clause No / Page No Description as per Bid Document Query / Clarification Tata Power DDL Reply Vendor name Email ID phone number
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_Annexure X – GCC_Composite Work.pdf
Tender Document • 2.87 MB
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_Annexure XV – Questionnaire for Sustainability Index Scoring.xlsx
Tender Document • 0.08 MB
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_Annexure-I Schedule of Item (BOQ)_Price Bid_Replacement of Relay.pdf
Tender Document • 0.29 MB
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_Annexure-I Schedule of Item (BOQ)_Price Bid_Replacement of Relay.xlsx
Tender Document • 0.01 MB
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_ENG-EHV-1005_Protection Specifications for 66kV-33kV-11kV Power System Network.pdf
Tender Document • 5.29 MB
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_Pre-Bid_Query_Format_TPDDL-ENGG-ENQ-200001996-26-27.xlsx
Tender Document • 0.01 MB
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_Relay's approved Make List.pdf
Tender Document • 0.21 MB
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_TPDDL-ENGG-ENQ-200001996-26-27_Replacement of relays_merge.pdf
Tender Document • 9.48 MB
Tender Document_Replacement of Relays_20260831162408409_Tender Document_Replacement of Relays_Vendor Appraisal Form.pdf
Tender Document • 0.21 MB
Prebid Queries Reponse_20260922125837574_Prebid Queries Reponse_ENG-EHV-1005_Protection Specifications.pdf
Corrigendum • 5.29 MB
Prebid Queries Reponse_20260922125837574_Prebid Queries Reponse_ENG-EHV-1006-02_Technical Specification.pdf
Corrigendum • 3.95 MB
Prebid Queries Reponse_20260922125837574_Prebid Queries Reponse_Nokia_7705_SAR_A8-C3794_Datasheet.pdf
Corrigendum • 0.00 MB
Prebid Queries Reponse_20260922125837574_Prebid Queries Reponse_Pre-Bid_TPDDL-ENGG-ENQ-200001996-26-27_response.pdf
Corrigendum • 0.58 MB
Prebid Queries Reponse_20260922125837574_Prebid Queries Reponse_Spec for LIU_OFC.pdf
Corrigendum • 0.74 MB
Prebid Queries Reponse_20260922125837574.zip
Corrigendum • 9.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .