Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | PAC₹12.2 CrAccepted-AOC | ₹12.2 Cr | PAC | Accepted-AOC ACCEPT |
| Sl No | Description | Qty | Unit | CORPORATE ALLIANCES L1 |
|---|---|---|---|---|
| 1.00FIRST DOCKING ROUTINES AT 18 MONTHS DURATION (C402-02, C404-02, C406-02, C420-02, C421-02, C450-02, C452-02, C430-02, C435-02, C408-02, C409-02, C413-02, C419-02, C417-02, C411-02 (TOTAL- 30 KITS) | ||||
| 1.01 | ZINC ANODE | 300 | NOS | 12,02,571.2 ₹24.1 L |
| 1.02 | FILTER CARTRIDGE | 30 | NOS | 10,31,146.36 ₹20.6 L |
| 1.03 | RETURN OIL FILTER CARTRIDGE | 30 | NOS | 5,78,140.36 ₹11.6 L |
| 1.04 | BREATHER FILTER | 30 | NOS | 2,73,500.53 ₹5.5 L |
| 1.05 | RETURN OIL FILTER CARTRIDGE (LUBE) | 30 | NOS | 5,78,140.36 ₹11.6 L |
| 1.06 | FILTER AND BREATHER FILTER | 30 | NOS | 2,74,193.16 ₹5.5 L |
| 1.07 | HYDRAULIC HOSES-650 | 30 | NOS | 71,58,949.34 ₹1.4 Cr |
| 2.00SECOND DOCKING ROUTINES AT 36 MONTHS DURATION (C410-02, C434-02, C441-02, C433-02, C444-02, C401-02, C403-02, C445-02, C423-02,) (TOTAL-18 KITS) | ||||
| 2.01 | ZINC ANODE | 180 | NOS | 7,21,542.72 ₹14.4 L |
Tender Value
Refer Docs
Closing Date
24 Oct 2025, 4:30 pmClosed
PD(Log)
CGHQ, SEC-62, NOIDA
PROCUREMENT OF MJP WATER JET ROUTINE KIT-26 AND ARD-25 SPARE
2025_ICG_732588_1
CGHQ/LS/TE/5553/E/25-26
Single
Machinery and Machining Tools
180 days
CGHQ, SEC-62, NOIDA
PLEASE REFER AS PER TENDER DOCUMENTS
4 documents required · 4 mandatory
₹0
Exempted
7 May 2026
25 Sept 2025
31 Oct 2025
25 Sept 2025
24 Oct 2025
26 Sept 2025
26 Sept 2025 - 24 Oct 2025
FIRST DOCKING ROUTINES AT 18 MONTHS DURATION (C402-02, C404-02, C406-02, C420-02, C421-02, C450-02, C452-02, C430-02, C435-02, C408-02, C409-02, C413-02, C419-02, C417-02, C411-02 (TOTAL- 30 KITS)
ZINC ANODE
FILTER CARTRIDGE
RETURN OIL FILTER CARTRIDGE
BREATHER FILTER
RETURN OIL FILTER CARTRIDGE (LUBE)
FILTER AND BREATHER FILTER
HYDRAULIC HOSES-650
SECOND DOCKING ROUTINES AT 36 MONTHS DURATION (C410-02, C434-02, C441-02, C433-02, C444-02, C401-02, C403-02, C445-02, C423-02,) (TOTAL-18 KITS)
ZINC ANODE
FILTER CARTRIDGE
RETURN OIL FILTER CARTRIDGE
BREATHER FILTER
RETURN OIL FILTER CARTRIDGE (LUBE)
FILTER AND BREATHER FILTER
HYDRAULIC HOSES-650
SEAL KIT CYLINDER 80/50
THIRD DOCKING ROUTINES AT 54 MONTHS DURATION (C453-02, C429-02, C437-02, C454-02, C414-02, C428-02, C415-02, C-422-02, (TOTAL- 16 KITS)
ZINC ANODE
FILTER CARTRIDGE
RETURN OIL FILTER CARTRIDGE
BREATHER FILTER
RETURN OIL FILTER CARTRIDGE (LUBE)
FILTER AND BREATHER FILTER
HYDRAULIC HOSES-650
ASSEMBLY KIT 650 MK2 SEAL KIT / MECHANICAL SEAL 5" T5MX
PIN SHAFT SET-ST UNIT 650 MK4
BUSHING SET STEERING UNIT 650
SERVICE KIT 120 A SHAFT SEAL
SAFETY
BELLOW (NON SPLIT)
ARD-25 SPARES (CGSD PORBANDAR)
IMPELLER 650 MK2
MBU INTERFACE MODULE (MRM BOARD WJIFM 1.09 STANDARD)
CYLINDER FEEDBACK SENSOR MJP 250MM
FEEDBACK AMPLIFIER
BUCKET FEEDBACK AMPLIFIER
750-468 MODULE
AZIMUTH STBD
WATER JET REMOTE INDICATOR UNIT
CONTROL PANEL LIGHT
LOW PRESSURE SENSOR(PRESSURE SWITCH)
European Euro
European Euro
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_820265.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
RFP.pdf
Tender Documents • 0.38 MB
BOQ_820265.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid