Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | PAC₹12.2 CrAccepted-AOC | ₹12.2 Cr | PAC | Accepted-AOC ACCEPT |
| Sl No | Description | Qty | Unit | CORPORATE ALLIANCES L1 |
|---|---|---|---|---|
| 1.00FIRST DOCKING ROUTINES AT 18 MONTHS DURATION (C402-02, C404-02, C406-02, C420-02, C421-02, C450-02, C452-02, C430-02, C435-02, C408-02, C409-02, C413-02, C419-02, C417-02, C411-02 (TOTAL- 30 KITS) | ||||
| 1.01 | ZINC ANODE | 300 | NOS | 12,02,571.2 ₹24,05,142.4 Lowest |
| 1.02 | FILTER CARTRIDGE | 30 | NOS | 10,31,146.36 ₹20,62,292.72 Lowest |
| 1.03 | RETURN OIL FILTER CARTRIDGE | 30 | NOS | 5,78,140.36 ₹11,56,280.72 Lowest |
| 1.04 | BREATHER FILTER | 30 | NOS | 2,73,500.53 ₹5,47,001.07 Lowest |
| 1.05 | RETURN OIL FILTER CARTRIDGE (LUBE) | 30 | NOS | 5,78,140.36 ₹11,56,280.72 Lowest |
| 1.06 | FILTER AND BREATHER FILTER | 30 | NOS | 2,74,193.16 ₹5,48,386.32 Lowest |
| 1.07 | HYDRAULIC HOSES-650 | 30 | NOS | 71,58,949.34 ₹1,43,17,898.68 Lowest |
| 2.00SECOND DOCKING ROUTINES AT 36 MONTHS DURATION (C410-02, C434-02, C441-02, C433-02, C444-02, C401-02, C403-02, C445-02, C423-02,) (TOTAL-18 KITS) | ||||
| 2.01 | ZINC ANODE | 180 | NOS | 7,21,542.72 ₹14,43,085.44 Lowest |
Tender Value
Refer Docs
Closing Date
24 Oct 2025, 4:30 pmClosed
PD(Log)
CGHQ, SEC-62, NOIDA
PROCUREMENT OF MJP WATER JET ROUTINE KIT-26 AND ARD-25 SPARE
2025_ICG_732588_1
CGHQ/LS/TE/5553/E/25-26
Single
Machinery and Machining Tools
Supply
180 days
CGHQ, SEC-62, NOIDA
PLEASE REFER AS PER TENDER DOCUMENTS
4 documents required · 4 mandatory
₹0
Exempted
7 May 2026
25 Sept 2025
31 Oct 2025
25 Sept 2025
24 Oct 2025
26 Sept 2025
26 Sept 2025 - 24 Oct 2025
FIRST DOCKING ROUTINES AT 18 MONTHS DURATION (C402-02, C404-02, C406-02, C420-02, C421-02, C450-02, C452-02, C430-02, C435-02, C408-02, C409-02, C413-02, C419-02, C417-02, C411-02 (TOTAL- 30 KITS)
ZINC ANODE
FILTER CARTRIDGE
RETURN OIL FILTER CARTRIDGE
BREATHER FILTER
RETURN OIL FILTER CARTRIDGE (LUBE)
FILTER AND BREATHER FILTER
HYDRAULIC HOSES-650
SECOND DOCKING ROUTINES AT 36 MONTHS DURATION (C410-02, C434-02, C441-02, C433-02, C444-02, C401-02, C403-02, C445-02, C423-02,) (TOTAL-18 KITS)
ZINC ANODE
FILTER CARTRIDGE
RETURN OIL FILTER CARTRIDGE
BREATHER FILTER
RETURN OIL FILTER CARTRIDGE (LUBE)
FILTER AND BREATHER FILTER
HYDRAULIC HOSES-650
SEAL KIT CYLINDER 80/50
THIRD DOCKING ROUTINES AT 54 MONTHS DURATION (C453-02, C429-02, C437-02, C454-02, C414-02, C428-02, C415-02, C-422-02, (TOTAL- 16 KITS)
ZINC ANODE
FILTER CARTRIDGE
RETURN OIL FILTER CARTRIDGE
BREATHER FILTER
RETURN OIL FILTER CARTRIDGE (LUBE)
FILTER AND BREATHER FILTER
HYDRAULIC HOSES-650
ASSEMBLY KIT 650 MK2 SEAL KIT / MECHANICAL SEAL 5" T5MX
PIN SHAFT SET-ST UNIT 650 MK4
BUSHING SET STEERING UNIT 650
SERVICE KIT 120 A SHAFT SEAL
SAFETY
BELLOW (NON SPLIT)
ARD-25 SPARES (CGSD PORBANDAR)
IMPELLER 650 MK2
MBU INTERFACE MODULE (MRM BOARD WJIFM 1.09 STANDARD)
CYLINDER FEEDBACK SENSOR MJP 250MM
FEEDBACK AMPLIFIER
BUCKET FEEDBACK AMPLIFIER
750-468 MODULE
AZIMUTH STBD
WATER JET REMOTE INDICATOR UNIT
CONTROL PANEL LIGHT
LOW PRESSURE SENSOR(PRESSURE SWITCH)
European Euro
Portion of Quoted Rate in Currency
European Euro
Portion of Quoted Rate in Currency
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_820265.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
RFP.pdf
Tender Documents • 0.38 MB
BOQ_820265.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .