Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | ₹4.7 L | L1 | Accepted-AOC l 1 |
| 2 | L2₹4.8 LRejected-Finance 6 2 SIVAN NORTH CAR STREET PALAYAMKOTTAI TIRUNELVELI 2 | ₹4.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Vinothshankarlalredsainfrastructureprivateltd L1 | M/S VIJAY INFRATECH L2 |
|---|---|---|---|---|---|
| 1.00Strengthening BT road at Kollankulam village in Odaimarichan panchayat | |||||
| 2.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 89.28 | Sqm | 6.35 ₹566.93 | 6.49 ₹579.43 |
| 3.00 | Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications. | 155 | Sqm | 23.34 ₹3,617.70 | 23.83 ₹3,693.65 |
| 4.00 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 44.64 | Cum | 140.31 ₹6,263.44 | 143.26 ₹6,395.13 |
| 5.00 | Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. | 22.32 | Cum | 727.5 ₹16,237.80 | 742.79 ₹16,579.07 |
| 9.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 58.13 | Cum | 2,707.3 ₹1.6 L | 2,764.21 ₹1.6 L |
| 10.00 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 465 | Sqm | 85.34 ₹39,683.10 | 87.14 ₹40,520.10 |
| 11.00 | Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 465 | Sqm | 19.82 ₹9,216.30 | 20.24 ₹9,411.60 |
| 12.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 13.95 | Cum | 11,874.74 ₹1.7 L | 12,124.36 ₹1.7 L |
| 13.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 71,750 ₹71,750 | 73,260 ₹73,260 |
Tender Value
Refer Docs
EMD Value
₹4,780
Closing Date
30 Sept 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER BLOCK PANCHAYATALANGULAM
BLOCK DEVELOPMENT OFFICER BLOCK PANCHAYATALANGULAM
Strengthening BT road at Kollankulam Village in Oodaimarichan Panchayat.
2025_RDTN_607770_1
Strengthening BT road at Kollankulam Village in Oodaimarichan Panchayat.
Open Tender
Civil Works - Others
BLOCK DEVELOPMENT OFFICER BLOCK PANCHAYATALANGULAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,780
Yes
BLOCK DEVELOPMENT OFFICER BLOCK PANCHAYATALANGULAM
21 Feb 2026
23 Sept 2025
30 Sept 2025
23 Sept 2025
30 Sept 2025
23 Sept 2025
23 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid