| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L1 | Accepted-AOC ok | |
| 2 | L2₹17.3 L+₹2.1 L (14.2%)Rejected-Finance FLAT NO 101 UGF FRONT LHS RZ B 49A KAILASHPURI PALAM COLONY NEW DELHI 110045 | SOUTH WEST | DELHI | 110045 | L2 | Rejected-Finance Other than lowest tenderer | |
| 3 | L3₹17.6 L+₹2.5 L (16.2%)Rejected-Finance 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | L3 | Rejected-Finance Other than lowest tenderer | |
| 4 | L4₹18.1 L+₹3.0 L (19.8%)Rejected-Finance 137 3 STREET NO 4 RAJINDER NAGAR DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L4 | Rejected-Finance Other than lowest tenderer | |
| 5 | L5₹19.1 L+₹4.0 L (26.3%)Rejected-Finance HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD PIN 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | L5 | Rejected-Finance Other than lowest tenderer |
Tender Value
Refer Docs
EMD Value
₹55,100
Closing Date
6 Mar 2021, 6:00 pmClosed
GE E/M BASE HOSPITAL DELHI CANTT
GE E/M BASE HOSPITAL DELHI CANTT
OUTSOURCING SERVICES FOR SEWAGE INSTALLATION, WATER SUPPLY INSTALLATION, INCINERATOR AND OTHER ALLIED WORKS AT CABINET SECTT UNDER GE (E/M) BASE HOSPITAL DELHI CANTT-10
2021_MES_420513_1
GE/BH-79/2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE E/M BASE HOSPITAL DELHI CANTT
Class D Category d(v)
7 documents required · 7 mandatory
₹500
Yes
GE E/M BASE HOSPITAL DELHI CANTT
₹55,100
Yes
23 Mar 2021
10 Feb 2021
8 Mar 2021
10 Feb 2021
6 Mar 2021
27 Feb 2021
Amount
Outsourcing services of water supply and fire pumping installation round the clock including Sunday/ Holiday by deploying skilled operator to operate installed machinery as per under given details complete all as specified and as directed:- Shift Duty (a) First Shift - 0600 hrs to 1400 hrs - One Skilled pump operator. (b) Second shift - 1400 hrs to 2200 hrs - One Skilled pump operator (c) Third shift - 2200 hrs to 0600 hrs - One Skilled pump operator. Details of Plant/Machineries to be operated: (a) Centrifugal Pump with motor 125 HP - 01 No (b) Centrifugal Pump with motor 100 HP - 03 Nos (c) Centrifugal Pump with motor 60 HP - 03 Nos (d) Centrifugal Pump with motor 15 HP - 02 Nos (e) Centrifugal Pump with motor 12.5 HP - 03 Nos (f) Centrifugal Pump with motor 10 HP - 01 No (g) Centrifugal Pump with motor 7.5 HP - 02 Nos (h) Mono block Pump with motor 3 HP - 01 No (j) Jockey Pump with motor 15 HP - 03 Nos (k) Diesel Engine 140 BHP, 680 ALU - 01 Nos (l) Sluice/butterfly valves (m) Electrical Control Panel of Pump Motor Note:- Diesel for operating Fire Engine shall be provided by the user.
Out sourcing services of Sewage installation on all working days (including Sunday/Holiday) in MS bldg and new CRF workshop by deploying skilled operator to operate electrically driven 3 phase, 50 Hz, AC sewage pumping system along with control of all mechanical device such as sluice valves, foot valves, NRVs etc. The installation to be operated in shift (8 Hours per shift) as mentioned below complete all as specified and as directed:- Shift Duty (a) First Shift - 0600 Hrs to 1400 Hrs with One skilled operator. (b) Second Shift - 1400 Hrs to 2200 Hrs with One skilled operator. (c) Third Shift - 2200 Hrs to 0600 Hrs with One skilled operator. Details of Plant/Machineries to be operated: SEWAGE INSTALLATION OF MS BUILDING (a) 12.5 HP motor with pump complete-01 No. (b) 10 HP motor with pump complete-07 Nos. (c) Sluice/butterfly valves (d) Electrical Control Panel of Pump Motor EAST AND WEST SEWAGE INSTALLATION OF CRF (a) 5 HP motor with pump complete-04 No. (b) 3 HP motor with pump complete-02 No. (c) Sluice/butterfly valves (d) Electrical Control Panel of Pump Motor
Out sourcing services on all working days (including Sunday/Holiday as and when required and as directed by the concerned JE E/M) of thermax type paralytic incinerator Gas fired type for burning highly combustible waste like papers, Wooden boxes rags etc having maximum moisture contents up to 25%. The capacity of incinerator 150-185 Kgs per hour complete with primary and secondary burning chambers, burners, combined combustion & educator air fan, educator mechanism, electrical control panel and other accessories like chimney, gas cascade/cylinder, MS ducting pipe line, operating valves, electric accessories, cables etc complete all as specified and directed. The installation to be operated in General shift (8 Hours per shift) as mentioned below complete all as specified and as directed:- Shift Duty (a) General Shift - 1000 Hrs to 1800 Hrs with One skilled operator Details of Plant/Machineries to be operated: (a) Gas Fired Incinerator of Capacity 150 - 185 Kgs Per hrs.. (b) Operation of gas fixing bank of 2 x 10 cylinder with control valves on both rows. (c) Electrical Control Panel (d) Combustion Fan Blower 5 HP (e) Burner Motor 0.5 HP
Notes for Item Nos 1.00 to 3.00:- (i) The estimated cost of the work in respect of BOQ Sr item Nos 1.00 to 3.00 (as based on minimum wages rates issued vide Central/ State) is Rs 21,95,000.00. If the quoted amount is found less than the estimated cost of Sr item Nos 1.00 to 3.00 of BOQ and tender of lowest bidder is considered for acceptance, to ensure compliance of payment of minimum wages to labours/workers by the contractor, the lowest bidder shall have to deposit FDR in favour of Accepting officer for the difference in estimated cost and Accepted amount in respect of BOQ Srl item Nos 1.00 to 3.00 within 30 days from date of acceptance. In case the said FDR is not submitted within 30 days, the amount in question shall be recovered from contractor’s first RAR/Final bill, whichever is earlier. However the FDR/recovered amount shall be released to the contractor after satisfactory completion of work.
Notes for Item Nos 1.00 to 3.00 (Contd...) (ii) The Operator shall be ITI qualified in concerned trade or 10th passed with shall have minimum 05 years experience in operation of water supply Installation/fire fighting Installation/LPG or PNG fired Incinerator/Sewage Installation/Forced ventilation. (iii) Contractor shall submit the nominal roll and qualification certificate of operator with in 15 days of acceptance. After that period a sum of Rs. 500/- per shift per installation shall be recovered. (iv) The staff deployed shall not leave the installation under any circumstances before handing over to Next shift duty operator otherwise penalty @ Rs. 500/- per shift per day shall be recovered from the contractor. (v) Contractor shall ensure attendance of all operators shift wise and Suitable Reliever to be provided during off shift operator if any operator found absent from duty a sum of Rs. 1000/- per shift shall be recovered. (vi) Contractor shall submit the payment proof i.e. passbook of bank account/Bank statement at the time of submission of RAR.
Notes for Item Nos 1.00 to 3.00 (Contd...) (vii) The payment of contractor's employee shall be made through nationalized bank account of individual and the proof of transaction and the contractor shall submit the same with bank account pass book of employees and own Bank account statement within 15 days of acceptance otherwise a recovery shall be made a sum of Rs 200/- per shift per employee from the contractor's dues. (viii) Police Verification of the employees shall be provided by the contractor. (ix) Contractor shall arrange their staff to run the installation in Saturday, Sunday/Public Holiday. (x) Sufficient T&P shall be arranged and kept in installation. (xi) Shift shall be of 08 hours starting from 0600 to 1400 hrs, 1400 to 2200 hrs and 2200 to 0600 hrs. (xii) Contractor shall be responsible for watch and ward of installation round the clock 24 hours. Any loss of damage to the plant equipment installed and Govt. property in the E/M installation premises shall be made good / born by the Contractor. Rate quoted by the Contractor shall deemed to be included on above Schedule. (xiii) All operator shall wear proper uniform, failing which a recovery of Rs 200/- per shift shall be recovered.
Notes for Item Nos 1.00 to 3.00 (Contd...) (xiv) The contractor shall provide of all the necessary stationery such as Attendance Register, Periodical Maintenance Register, log book etc to the operator for maintenance the plant running record. (xv) The periodical cleaning/ routine checking/testing shall be carried out by the contractor for efficient and smooth functioning of the installations. (xvi) All consumable items like grease, gland packing, nuts, bolts, washers and any other minor parts or any other related welding/grinding work required for smooth and noiseless functioning of installation deemed to be included in quoted rates.
Removal & disposal of ash and waste collected from plant room inside Cabinet Sectt and disposal to MCD low laying area by private vehicle complete all as specified and as directed. Note:- The vehicle shall be arranged by the contractor. Cost of the same shall deemed to be included in the rates quoted by the contractor.
HIND CONSTRUCTIONS
Vishal Traders
M/S ANIL KUMAR
national engineering
JIWAN DASS THAREJA AND SONS
GIAN ENGINEERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .