| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | ₹9.7 L | L1 | Accepted-AOC Qualify |
| 2 | L2₹9.8 LRejected-AOC | ₹9.8 L | L2 | Rejected-AOC Disqualify |
| 3 | L3₹10.1 LRejected-AOC AT BARABATI PO BAIDYARAJPUR DIST JAJPUR PIN 755007 | BAIDYARAJPUR | JAJPUR | ODISHA | 755007 | ₹10.1 L | L3 | Rejected-AOC Disqualify |
| 4 | L4₹10.7 LRejected-AOC | ₹10.7 L | L4 | Rejected-AOC Disqualify |
| 5 | L4₹10.7 LRejected-AOC | ₹10.7 L | L4 | Rejected-AOC Disqualify |
Tender Value
₹12.6 L
EMD Value
₹13,000
Closing Date
9 Feb 2026, 5:00 pmClosed
Superintending Engineer
O/o the Superintending Engineer, Rural Works Division,Jajpur
S/R to Fire Station Building at Binjharpur for the year 2025-26
2026_CERWI_125402_3
Tender Online 16 JJPT of 2025-26
Open Tender
Civil Works - Buildings
30 days
JAJPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹13,000
Yes
23 Jun 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
2 Feb 2026 - 7 Feb 2026
Dismantling and removing 2.5 cm.thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead as per the direction of Engineer-in-charge. Ground Floor
First Floor
Dismentaling & removing doors, windows, & ventilators , including removal of frame,hinges, fastening & stacking the useful materials for the reuse and removing the debries within 50 m lead.
2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips. On new work with all taxes royalties & cess etc, complete as per direction of Engineer-in-charge.
Scraping old paint with scrapers, sand papering and washing with soap water or soda including scaffolding charge above 5m high and upto 8m height with cost of materials all taxes labour T&P etc. Completed as per direction Engineer in charge Ground Floor
First Floor
Supplying, fitting and fixing of two coat track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures.
Supplying, fitting and fixing of openable UPVC door with door frame of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures.
Iron work wrought and put up in window grating including drilling holes in choukathas , including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work in all respect as per the direction of Engineer in Charge.
Finishing wall surface with acrylic wall putty ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete. Ground Floor
First Floor
Wall Painting Two coats with plastic emulsion paint of approved shed on new work to give an even shade excluding cost of Paint Ground floor
First Floor
Wall painting two coats with any approved quality of Weather seal coat over one coat of Primerwith any approved shade including cost of paint on New Plastered surface of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete. Ground Floor
First Floor
Painting two coats of enamel paint in all floors to new iron work over a coat of primer including sand papering,polishing the surface,including cost conveyance royalties and all taxes of all materials alongwith T&P required for the work including cost of paint & primer complete in all respect as per the direction of Engineer in Charge. Ground Floor
First Floor
Providing, fitting & fixing of wall panelling made out of 19mm thick BWR plywood and 1mm thick laminate including all cost, conveyance, labour, royalty, taxes of the materials with T&P required for the work with hire charges of machinery etc complete as per the direction of the Engineer-In-Charge.
Providing, fitting ,fixing of false ceiling with Aluminium T Section 3215 with 2' -0"centre to centre L Section no 1705 upto 15 micron on 4 walls to be fixed by means of steel screw and PVC plug and the Aluminium grid 2' 0" x 2' 0" with gypsum Board Suspended from the Ceiling etc. Complete.
Providing Cement Concrete (1:3:6) with 40mm size clean hand broken granite metal of approved quality from approved quarry including hoisting lowering & levelling in position to required level in each layer not exceeding 15cm thick in foundation including frame work where necessary ramming using vibrator to proper slope and levelling curing dewatering with cost conveyance taxes royality, labour of all materials and including hire & running charges of machineries T&P required for the work including supplying & working of pumps and cess as per the specifiction and direction of Engineer-in- charge
Fixing tiles in floors treads or steps and landing (Vetrified tile) on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles Ground Floor
First Floor
Fixing Vitrified tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles Ground Floor
First Floor
Fixing tiles in floors treads or steps and landing (Granite tile) on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles
Fixing Granite tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles
Fixing Kota tiles in floors,treads and landings on 25mm thick bed of cement mortar (1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge. Ground Floor
First Floor
Fixing Kota tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge. Ground Floor
First Floor
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
Tendernotice_2.pdf
PDF • 4.11 MB
BOQ_578882.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid