| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | ₹2.0 L | 1 | Accepted-AOC ACCEPTED |
| 2 | 2₹2.4 LRejected-Finance 0 AHAMADPUR AHAMADPUR AHAMADPUR JAUNPUR UTTAR PRADESH 222180 | JAUNPUR | UTTAR PRADESH | 222180 | ₹2.4 L | 2 | Rejected-Finance NOT L1 |
| Sl No | Description | Qty | Unit | M/S PRADEEP SINGH L1 | M/S SAI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work on R/bank of river Yamuna in slope cutting and for making stairs for approach to jetty with its disposal as per direction of Engineer-in-charge in all types of soil including all leads and lifts, labour and T&P etc. | 388.25 | M3 | 39 ₹15,141.75 | 25 ₹9,706.25 |
| 2.00 | Making Balli Khuntas on 125mm (5") f ballies for piling with all labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge but excluding cost of ballies. | 253 | Nos. | 15 ₹3,795 | 20 ₹5,060 |
| 3.00 | Balli piling with 125mm (5") f ballies in grid as per drawing including cost of all material, labour, T&P etc. required for proper completion of works all complete as per direction of Engineer-in-charge but excluding cost of ballies. | 429.46 | RM | 100 ₹42,946 | 70 ₹30,062.2 |
| 4.00 | Bracing on driven piles with 100mm (4") dia, ballies along and across in rectangular grid with 6" long Mallahi nails of good quality and fixing wooden planks of size 2.00 M. ´ 0.25 M. size, 5 cm. thick over bracing to make platform for Jetty using 4" long good quality Mallahi nails including cost of all material, labour T&P etc required for proper completion of work all complete as per direction of Engineer-in-charge but excluding cost of ballies and planks. | 40 | M2 | 800 ₹32,000 | 1,450 ₹58,000 |
| 5.00 | Supplying and filling new HDPE woven bags with local Ganga sand and stacking, placing in position for making stair etc and at other places with all leads lifts including cost of materials, labour and T&P etc. as per direction of Engineer-in-charge. | 4,056 | Nos. | 15 ₹60,840 | 21.3 ₹86,392.8 |
| 6.00 | Barricading with 100mm-120mm dia balli in two rows including cost of all materials and tying arrangement with all labour T&P. etc. required for proper completion of work as per direction of Engg-in- charge but excluding cost of ballies. | 144 | RM | 25 ₹3,600 | 35 ₹5,040 |
| 7.00 | Painting with two coat of approved superior quality ready mixed synthetic enamel paint with one coat of primer on new surface on 125mm (5") dia balli khunta vertical in barricading including cost of material, labour and T&P etc. required for proper completion of work. | 64 | RM | 20 ₹1,280 | 30 ₹1,920 |
| 8.00 | Painting with two coat of approved superior quality ready mixed synthetic enamel paint with one coat of primer on new surface on 100m (4") dia balli khunta horizontal in barricading including cost of material, labour and T&P etc. required for proper completion of work. | 116 | RM | 20 ₹2,320 | 30 ₹3,480 |
| 9.00 | Deplanking and Debracing in dismantling of jetty and stacking for proper completion of work as per direction of Engineer-in-charge. | 40 | M2 | 300 ₹12,000 | 450 ₹18,000 |
| 10.00 | Depiling of ballies in dismantling of jetty and stacking for proper completion of work as per direction of Engineer-in-charge. | 429.46 | RM | 33 ₹14,172.18 | 35 ₹15,031.1 |
Tender Value
₹3.5 L
EMD Value
₹6,900
Closing Date
15 Nov 2025, 10:00 amClosed
EE FWD PRAYAGRAJ
EE FWD PRAYAGRAJ
CONSTRUCTION,WATCHING AND MAINTENANCE OF TEMPORARY JETTY (10x4)m AT ARAIL AREA I R/BANK OF RIVER YAMUNA MAGH MELA 2025-26
2025_UPIDC_1088571_5
01/EE/2025-26
Open Tender
Civil Works
90 days
MAGH MELA AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6,900
Yes
9 Jan 2026
6 Nov 2025
17 Nov 2025
6 Nov 2025
15 Nov 2025
6 Nov 2025
Amount
Earth work on R/bank of river Yamuna in slope cutting and for making stairs for approach to jetty with its disposal as per direction of Engineer-in-charge in all types of soil including all leads and lifts, labour and T&P etc.
Making Balli Khuntas on 125mm (5") f ballies for piling with all labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge but excluding cost of ballies.
Balli piling with 125mm (5") f ballies in grid as per drawing including cost of all material, labour, T&P etc. required for proper completion of works all complete as per direction of Engineer-in-charge but excluding cost of ballies.
Bracing on driven piles with 100mm (4") dia, ballies along and across in rectangular grid with 6" long Mallahi nails of good quality and fixing wooden planks of size 2.00 M. ´ 0.25 M. size, 5 cm. thick over bracing to make platform for Jetty using 4" long good quality Mallahi nails including cost of all material, labour T&P etc required for proper completion of work all complete as per direction of Engineer-in-charge but excluding cost of ballies and planks.
Supplying and filling new HDPE woven bags with local Ganga sand and stacking, placing in position for making stair etc and at other places with all leads lifts including cost of materials, labour and T&P etc. as per direction of Engineer-in-charge.
Barricading with 100mm-120mm dia balli in two rows including cost of all materials and tying arrangement with all labour T&P. etc. required for proper completion of work as per direction of Engg-in- charge but excluding cost of ballies.
Painting with two coat of approved superior quality ready mixed synthetic enamel paint with one coat of primer on new surface on 125mm (5") dia balli khunta vertical in barricading including cost of material, labour and T&P etc. required for proper completion of work.
Painting with two coat of approved superior quality ready mixed synthetic enamel paint with one coat of primer on new surface on 100m (4") dia balli khunta horizontal in barricading including cost of material, labour and T&P etc. required for proper completion of work.
Deplanking and Debracing in dismantling of jetty and stacking for proper completion of work as per direction of Engineer-in-charge.
Depiling of ballies in dismantling of jetty and stacking for proper completion of work as per direction of Engineer-in-charge.
Debarricading of ballies 100mm- 120mm in two rows and stacking including all labour T&P etc. as per direciton of Engineer-in-charge.
Carriage of stock material from store to working site for construction of Jetty and site to store after dismantling of Jetty.
M/S SAI CONSTRUCTION (BID ID -5672113)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 0.33 MB
DOC.pdf
Tender Documents • 1.49 MB
BOQ_1997453.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid