Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹5.3 L
Closing Date
13 Jul 2026, 11:00 am
Dy CE O and M MHP Talwara
Dy CE O and M MHP Talwara Sector 3 Talwara
Outsourcing the work of Routine and Preventive Maintenance Breakdown Maintenance and Annual Overhauling of Generating Units Switchyards and other allied equipment through contractor at Power House 1 to 4 of Mukerian Hydel Project
2026_POWER_169700_1
01/SE/MHP/2026-27/P-428
Open Tender
Electrical Works
365 days
MHP PH 1 to 4 Talwara
As per NIT
3 documents required · 3 mandatory
₹2,360
₹5.3 L
Yes
11 Jun 2026
11 Jun 2026
17 Jul 2026
11 Jun 2026
13 Jul 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code | GST % |
|---|---|---|---|---|---|---|---|
| 1Outsourcing the work of Routine & Preventive Maintenance, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards and other allied equipment through contractor at Power House No.- 1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara | |||||||
| 1.01 | Lump-sum rates for Routine, Preventive Maintenances, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards, Bays and other allied equipment at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb) as per tender specifications. (Refer Note-1 below & DNIT Clause No.1.7 of section-I) | 12 | Months | 4 | ₹48 | BI01010001010000000000000515BI0100001113 | 0.18% |
| 1.02 | Lump-sum monthly rates for deployment of additional manpower by contractor for 60 Days during annual shutdown period (tentatively between March to May) considering deployment of minimum manpower as given in Section-VI-Table 6.1 (Column-4) at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, Talwara. Monthly rates shall be quoted considering the month of 30 Days. (Refer Note-2 below & DNIT Clause No.1.7of section-I) | 2 | Months | 4 | ₹8 | BI01010001010000000000000515BI0100001114 | 0.18% |
| 1.03 | Lump-sum monthly rates for providing assistance for 90 Days during rainy season (tentatively between June to Sept) considering deployment of minimum manpower as given in Section-VI-Table 6.1 (Column-5) at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb) as per tender specifications. Monthly rates shall be quoted considering the month of 30 Days. (Refer Note-3&4 below & DNIT Clause No.1.7of section-I) | 3 | Months | 4 | ₹12 | BI01010001010000000000000515BI0100001115 | 0.18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
DNITOSMPHsR.pdf
Tender Documents • 0.90 MB
BOQ_345507.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid