Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹49,000
EMD Value
₹2,450
Closing Date
4 Feb 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
C/O DRAIN FROM THE HIO SHARIEF UD DIN KHATANA TO MAIN ROAD AT CHALYAN CHONTINARD
2026_RDPR_301459_1
NIT_111_REW BUDGAM OF 2025-26
Open Tender
Civil Works
Percentage
30 days
PAKHERPORA
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹2,450
5 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
Name of work :- C/o drain from the H/o Sharief ud Din Khalana to main road aat chalyan chontinand
Contract No: of 2025-26 DATED: - -2025 Adv cost =Rs 0.49 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0_) Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:. All kinds of soil BI01010001010000000000000515BI0100001118 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones BI01010001010000000000000515BI0100001119 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate (including carriage of all materials) & Including head load 50 mtr BI01010001010000000000000515BI0100001121 Cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) P/A 6mm thick cement plaster of mix 1:3 (1cement: 3 fine sand) (including carriage of all materials) BI01010001010000000000000515BI0100001122 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. BI01010001010000000000000515BI0100001123 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Add provisions for signboard, Photographes and other unforseen items. BI01010001010000000000000515BI0100001126 job Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_978221.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .