Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 LAccepted-Finance | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹23.5 L+₹1.5 L (7.01%)Accepted-Finance | L2 | Accepted-Finance Being L2 | |
| 3 | L3₹24.5 L+₹2.5 L (11.5%)Accepted-Finance | L3 | Accepted-Finance Being L3 | |
| 4 | L4₹24.6 L+₹2.6 L (12.0%)Accepted-Finance | L4 | Accepted-Finance Being L4 | |
| 5 | L5₹25.0 L+₹3.0 L (13.8%)Accepted-Finance | L5 | Accepted-Finance Being L5 |
Tender Value
₹38.7 L
Closing Date
24 Jul 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO Doda
Forest Complex Doda
Installation and survey of Boundary Pillars 500 Nos in Lal Draman Forest of Siraj Range in Doda Forest Division under CAMPA for the year 2023-24
2023_FD_218254_1
e NIT 34 of 2023-24 dtd. 23-06-2023
Open Tender
Civil Works
Item Rate
90 days
Siraj Range in Lal Draman Forest
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Doda
Exempted
26 Jul 2023
23 Jun 2023
25 Jul 2023
23 Jun 2023
24 Jul 2023
23 Jun 2023
Amount
Earth providing work in excavation by manual means in trenches for foundations drains, pipes cables, etc. (Not exceeding 1.5 mte width) and for shafts, wells, cesspits and the like not exceeding 10sq in plane. Depth height upto 1 mtr from cutting edge, disposal earth is to leveled and neatly dressed. All kind of soil. 500 numbers sides = 1.00 with dimensions 2.5 x 1.50 x 3.25 = 6093.75 cft.
Providing and lying in position cement concrete of specified grade exclusing the cost of centering and shuttering. All work upto plinth level 1:3:6 ( 1 cement and 3 coarse sand 6 graded stone aggregate 20 mm nominal size) crused of (i) 500 numbers of sides = 1.00 with dimensions 2.5 x1.50 x 2.00 = 3750 cft, (ii) 500 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 2.00 = 750 cft and (iii) 500 numbers of side 1.00 with dimension 2.50 x 1.50 x 0.25 = 468.75.
Filling available excavated earth ( Excluding rock) in trenches plinth sides foundation etc in layers not exceeding 20 cm depth consolidating layer by remaining and watering load upto 50 mtr and lift upto 1.5 m of (i) 500 numbers of sides = 1.00 with dimensions 2.5 x 1.50 x 1.00 = 1875 cft and (ii) 500 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 1.00 = 375 cft
Reinforced cement concrete work in walls ( any thickness) including attached pllasters buttresses, plinth and string courses fillets, columns, pillars, fillets, piers, abutments, posts and struts etc upto floor five level excluding cost of cetering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 coarse sand 3 graded crushed stone aggregate 20 mm nominal size.) of 500 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 6.00 = 2250 cft
Reinforcement for RCC work including straightening,cutting bening, placing in position and binding all complete cold twisted cold twisted bars having 500 numbers (i) 4 numbers of Iron bars having length 6 feet = 12000 feet = 3658.54 mtr which includes Weight Kg/mtr = 0.62 = total weight = 2268.29 Kg (ii) 8 numbers of Iron bars having length 1.5 feet = 6000 feet = 1829.27 mtr which includes Weight Kg/mtr = 0.39 = total weight = 713.41 Kg
Painting of pillars (with superior and exterior paint) including costs of labour charges incliuding painting of forest department logo and the front phase of the pillar with stencil for mainline BPs Red shade. Adventure 2189 (Nerolac) and for chak BPsYellow shade. Bumble bee 2014 (Nerolac) Exterior Emulsion paint is recommended. Solicon and acrylic emulsion based.
Centering and shuttering including shuttering propping etc and removal of form work for columns piers abutments pillers posts and struts for (i) 500 number having 2 sides of length 1.50 feet x depth height 6.00 feet = 9000 sft. = 836.43 Sqm (ii) 500 number having 2 sides of length 0.50 feet x depth height 6.00 feet = 3000 sft = 278.81 Sqm.
Carriage of material from source to site of work by M.T and H.L av for bajri av. M.T 19 Km and H.L 5150 mtr
Providing labour for bush clearance and materials like paint, brush, measuring tape etc. to the Forest Survey team constituted by the Forest Department on account of Survey of 500 Boundary Pillars
Add for Repedite
Carriage of material from source to site of work by M.T and H.L av for sand av. M.T 19 Km and H.L 5150 mtr
NAJEEB UR REHMAN
MOHD ARIF BUTT
SHEELA DEVI
GHULAM ALI RISHU
NASIR LATIEF BUTT
NISSAR AHMED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .