| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.4 LAdmitted-Finance | -31.86% | ₹48.4 L | L1 | Admitted-Finance |
| 2 | L2₹55.4 L+₹7.0 L (14.5%)Admitted-Finance | -22.01% | ₹55.4 L+₹7.0 L (14.5%) | L2 | Admitted-Finance |
| 3 | L3₹60.4 L+₹12.0 L (24.8%)Admitted-Finance | -14.99% | ₹60.4 L+₹12.0 L (24.8%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹71.0 L
EMD Value
₹1.4 L
Closing Date
25 May 2026, 2:00 pmClosed
COMISSIONER
NAGAR PARISHAD JALORE
Construction of cc road iti kanaram house to paniya marg NH325 culvert bridge tak ward no.40 nagar parishad area Jalore
2026_DLB_560978_3
NPJ/DEV/888 DATE 06-05-2026
Open Tender
Civil Works
Percentage
90 days
Jalore
Please refer tender documents
3 documents required · 3 mandatory
₹500
COMMISSIONER/MD RISL
₹1.4 L
Yes
18 Jun 2026
20 May 2026
28 May 2026
20 May 2026
25 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | - | Cum | 178.5 | - |
| 2.01 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth :: up to 3km | - | Cum | 209.35 | - |
| 3.01 | Providing, laying and spreading of granular sub-base by providing coarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material | 1 | Cum | 1,106 | ₹1,104.89 |
| 4.01 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 1 | Cum | 2,955 | ₹2,952.05 |
| 5.01 | Providing and laying un-reinforced, plain cement concrete mix with Concrete Mixer & vibrator pavement over a prepared sub base with 43 grade cement , coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed as per approved mix design, laid, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints etc including all material, labour, machinery, lighting, guarding and maintenance of diversion.PCC M-20 | - | Cum | 5,650 | - |
| 6.01 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | - | Sqm | 236 | - |
| 7.01 | Providing and Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts including jointing ends and fixing collar with cement mortar 1:2 complete as per clause 1000 & 2900 of MoRT&H specification including all material, labour form work, machinery.350 mm internal diameter | - | Mtr | 1,777 | - |
| 8.01 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | - | Cum | 678 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_998437.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .