| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | TIRUCHIRAPPALLI | TAMIL NADU | 621308 | L1 | Accepted-Finance bid accpeted | |
| 2 | L2₹10.4 L+₹339 (0.03%)Rejected-Finance | L2 | Rejected-Finance Bid rejected |
| Sl No | Description | Qty | Unit | KANNAN L1 | AATHVIK CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Excavation for foundation in all types of soils and sub soils including soft disintegrated rock and soft rock to the full depth including all leads and lifts etc., complete complying with the standard specification, drawing and as directed by the departmental EngineersSS20B for Foundation | 64 | m3 | 246 ₹15,744 Lowest | 247 ₹15,808 |
| 2.00 | Plain Cement concrete of mix 1:4:8 (One cement four M-sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. | 9 | m3 | 5,605 ₹50,445 Lowest | 5,605 ₹50,445 Lowest |
| 3.00 | Centering charges of RCC Works for slab and beams including cost and conveyance and all labour charges etc., complete as per standard specifications. | 1 | m2 | - | - |
| 3.01 | With Strutting | 125 | m2 | 919 ₹1,14,875 Lowest | 920 ₹1,15,000 |
| 3.02 | With out Strutting | 72 | m2 | 459 ₹33,048 Lowest | 460 ₹33,120 |
| 4.00 | RCC 1:1½:3 (One cement one point five M-sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification | 26 | m3 | 8,586 ₹2,23,236 Lowest | 8,587 ₹2,23,262 |
| 5.00 | Supplying and Fabricaton of TMT rods including cost of cutting,bending and tying with cost of binding wire including cost and conveyance of all materials and labours charges etc., complete as per standard specification | 260 | kg | 89.8 ₹23,348 Lowest | 90 ₹23,400 |
| 6.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. | 45 | m3 | 7,301 ₹3,28,545 Lowest | 7,301 ₹3,28,545 Lowest |
| 7.00 | Plastering with cement mortar 1: 5 ( one cement and five P.Sand) mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification | 433 | m2 | 272 ₹1,17,776 Lowest | 272 ₹1,17,776 Lowest |
| 8.00 | Supplying and fixing of M.S.Grill of approved design for doors. Windows and ventilators using necessary mild steel flats for inner and outermembers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications. | 200 | kg | 105 ₹21,000 Lowest | 105 ₹21,000 Lowest |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
25 Aug 2025, 3:00 pmClosed
Executive Officer Pennadam TP
Office of Pennadam TP
CONSTRUTION OF COMPOUND WALL AT RRP IN PENNADAM TOWN PANCHAYAT
2025_DTP_595470_1
A1/80/2025
Open Tender
Solid Waste Management
Works
180 days
Pennadam
CLASS
3 documents required · 3 mandatory
₹0
₹14,000
Yes
11 Sept 2025
21 Aug 2025
26 Aug 2025
21 Aug 2025
25 Aug 2025
21 Aug 2025
21 Aug 2025 - 25 Aug 2025
Amount
Earthwork Excavation for foundation in all types of soils and sub soils including soft disintegrated rock and soft rock to the full depth including all leads and lifts etc., complete complying with the standard specification, drawing and as directed by the departmental EngineersSS20B for Foundation
Plain Cement concrete of mix 1:4:8 (One cement four M-sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.
Centering charges of RCC Works for slab and beams including cost and conveyance and all labour charges etc., complete as per standard specifications.
With Strutting
With out Strutting
RCC 1:1½:3 (One cement one point five M-sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification
Supplying and Fabricaton of TMT rods including cost of cutting,bending and tying with cost of binding wire including cost and conveyance of all materials and labours charges etc., complete as per standard specification
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand ) using new best country Bricks of size 8 ¾” x 4 ¼” x 2 ¾” from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications.
Plastering with cement mortar 1: 5 ( one cement and five P.Sand) mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification
Supplying and fixing of M.S.Grill of approved design for doors. Windows and ventilators using necessary mild steel flats for inner and outermembers which should be fixed to window frames inclusive of priming coat of best approved quality red oxide primer etc., complete complying with standard specifications.
Painting the new walls two coats over one coat of priming with best Emulsion paint of approved colour and quality including preparation of surface and finishing neatly etc., complete complying with standard specification and as directed by the department officers etc., complete complying with standard specifications.
Painting two coats new iron work for doors, windows and ventilators using iron bars, window grills weld mesh screen in opt courtyard etc., with two coat synthetic enamel paint and approved quality and color including priming coat in all floors. The rate is inclusive of cost of all materials, labour brushes and scaffolding charges etc., complete complying with standard specifications.
AATHVIK CONSTRUCTION (BID ID -1439186)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .