| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance SF NO 253 254 VIGNESHWARA NAGAR THOTTIPALAYAM TIRUPUR | TIRUCHIRAPPALLI | TAMIL NADU | 620001 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
17 Jul 2023, 3:00 pmClosed
bdo sembanarkoil
sembanarkoil
Construction of Community hall chandhirapadi in Chandhirapadi panchayat
2023_RDTN_333495_1
1094/2023/A2 sembanarkoil
Open Tender
Civil Works
Item Wise
90 days
sembanarkoil
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹10,000
Yes
21 Jan 2024
29 Jun 2023
17 Jul 2023
29 Jun 2023
17 Jul 2023
29 Jun 2023
29 Jun 2023 - 30 Jun 2023
Amount
Construction of Community hall chandhirapadi in Chandhirapadi panchayat in Sembanarkoil block.
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders as per SS20B, including all labour charges etc., complete for foundation.
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Upto basement.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement.
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges etc., complete. For basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges etc., complete. For Superstructure
Supply and fabrication of steel including cost and conveyance of steels from godown to work site including labour for cutting, jointing and welding if necessary including labour for tieing with binding wire and labour for placing in position as directed by departmental officers, including all labour and all other incidental charges etc., complete for all RCC items.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
Centering for Roof Slabs per Sqm
Plastering in CM 1:5 - 12mm thick including cost and conveyance of all materials and all labour charges etc., complete.
Special ceiling plastering in CM 1:3 –10mm thick including cost and conveyance of all materials and all labour charges etc., complete.
Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Painting with Plastick Emulsion , including cost and conveyance of all materials to worksite and all labour and all other incidental charges etc., complete.
Provision for Name Baord
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
P.Gowtham
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .