Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 CrAccepted-AOC | ₹19.4 Cr | L1 | Accepted-AOC Rate quoted by L1 bidder is lowest |
| 2 | L2₹29.8 CrRejected-Finance JANTA PRESS GALIAGRAWAL LODGE ROAD MANENDRAGARH CHHATTISGARH 497 442 | MANENDRAGARH | MANENDRAGARH CHIRMIRI BHARATPUR | CHHATTISGARH | 497442 | ₹29.8 Cr | L2 | Rejected-Finance Due to rates quoted by L2 bidder is found very high |
| 3 | Rejected-Technical | - | - | Rejected-Technical due to not capable in WLR |
Tender Value
₹14.2 Cr
EMD Value
₹15.8 L
Closing Date
9 Jul 2020, 12:00 pmClosed
CHIEF ENGINEER PROJECT SEWAK
HQ CE PROJECT SEWAK CARE 99 APO
DESIGN AND CONSTRUCTION OF 03 NOS MAJOR PERMANENT BRIDGES OF SPAN 40 MTR OVER SHONSHO NALLAH AT KM 27.900 (PartI), 35 MTR OVER MAYUNG NALLAH AT KM 33.250 (Part II) AND 50 MTR OVER MOKAHA NALLAH AT KM 84.575 (Part III) WITH STEEL SUPER STRUCTURE THROU
2020_BRO_565865_1
CE (P) SWK -03/2020-21 (Second Call)
Open Tender
Civil Works - Bridges
913 days
AT KM 27.90, KM 33.25 AND KM 84.575 ON T M N RD
as per tender Documents
10 documents required · 10 mandatory
₹0
₹15.8 L
Yes
HQ CE PROJECT SEWAK CARE 99 APO
18 Dec 2020
19 Jun 2020
10 Jul 2020
20 Jun 2020
9 Jul 2020
25 Jun 2020
20 Jun 2020 - 24 Jun 2020
25 Jun 2020
SSI, Design including proof checking and Construction of Single span major permanent bridges with steel truss type super structure (through type) on open foundation on road Tuensang-Mon-Naginimora under Sewak Project in Nagaland State as per NIT drawing based on hydraulic data, ground data, sub soil data, Special conditions and Particular specifications of the tender document. Construction work includes all preparatory works, erection of staging/shuttering , abutments, piers, return wall, placing of POT & POT cum PTFE bearing, launching of Steel superstructure with RCC decking, wearing coat having no skid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, footpaths, Kerbs, hand rails, drainage Spout, load testing of superstructure of bridge, service arrangement for utilities, painting on all exposed steel works & kerbs, protective works, temporary river training works and diversion and all other items of work required and necessary for the complete construction of the bridge including curing but excluding works on approaches and approach slab for following bridges:
Part I (40 Mtr long single span bridge with Steel superstructure (Through Type) at Km 27.900 over Shonsho Nallah) Drg No. B-2081/B&T Dte/SWK/2020 Sheet No. 1 dated 26 Feb 2020
Part II (35 Mtr long single span bridge with Steel superstructure (Through Type) at Km 33.250 over Mayung Nallah) Drg No. B-2080/B&T Dte/SWK/2020 Sheet No. 1 dated 26 Feb 2020
Part III (50 Mtr long single span bridge with Steel superstructure (Through Type) at Km 84.575 over Mokaha Nallah) Drg No. B-2082/B&T Dte/SWK/2020 Sheet No. 1 dated 26 Feb 2020
PODDAR CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid