Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC AT ANDOLA P O SRIDHARPUR PS JAJPUR TOWN DIST JAJPUR ODISHA 755062 | JAJAPUR | ODISHA | 755062 | ₹1.5 L Quoted ₹1.2 L | L1 | Accepted-AOC Awarded for being as L1. |
| 2 | L2₹1.3 LRejected-Finance AT BAGHAMARA PO GHANTAPADA DIST ANGUL ODISHA PIN 759103 | ANGUL | ANGUL | ODISHA | 759103 | ₹1.3 L | L2 | Rejected-Finance Rejected for being as L2. |
| Sl No | Description | Qty | Unit | Amarjit Kumar L2 | Santosh Kumar Sahoo L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of 100mtr 200mm dia pipe line 90 degree bend, Tees & lifting out from borewell | 1 | Nos. | 19,500 ₹19,500 | 21,144.27 ₹21,144.27 |
| 2.00 | Fabrication of 4 nos mitre cut 90 degree bend with 200mm dia, | 1 | Nos. | 12,000 ₹12,000 | 14,782.82 ₹14,782.82 |
| 3.00 | Cutting & fitting of clit (from MS plate 20mm of size 50mm*50mm= 68 nos) and pad plate (from MS plate 4mm of size 50mm*236mm = 34nos) for supporting of 200mm pipe for lowering | 1 | Nos. | 23,045 ₹23,045 | 24,495.45 ₹24,495.45 |
| 4.00 | Fabrication, erection & lowering of 100mtr 200mm dia pipe line in borewell& fitting of mitre cut bends (4nos) at both end of pipe line and conection of Tees. | 1 | Nos. | 50,500 ₹50,500 | 47,101.29 ₹47,101.29 |
| 5.00 | Hiring of Generator 100KVA/125KVA (8 Hours/Day * 10 Days =80 Hours)
Note:- Above hire charges include cost of services of operating staff, cost
of lubricating oil, diesel, other consumables for running the machinery and excluding GST | 80 | Hrs | 250 ₹20,000 | 200.9 ₹16,072 |
| 6.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 1,250.45 ₹1,250.45 | 1,235.96 ₹1,235.96 |
Tender Value
₹2.6 L
EMD Value
₹3,300
Closing Date
5 Sept 2025, 5:00 pmClosed
B.D. BEHERA, STAFF OFFICER (EnM),TA
STAFF OFFICER (E AND M), OFFICE OF THE GENERAL MANAGER, MCL, TALCHER AREA, P.O. - DERA COLLIERY, DIST- ANGUL (ODISHA), PIN - 759103 MAHANADI COALFIELDS LIMITED, TALCHER AREA
Lifting, Replacement and Lowering of damaged Borehole Pipeline of 40WL Pump (1st) of Nandira Colliery.
2025_MCL_341851_1
GM(TA)/SO(EnM)/e-17, Dated.20.08.2025
Open Tender
Electrical and Maintenance Works
30 days
Nandira Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,300
13 Dec 2025
20 Aug 2025
8 Sept 2025
21 Aug 2025
5 Sept 2025
21 Aug 2025
21 Aug 2025 - 25 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid