Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-Finance | 1 | Accepted-Finance FOUND ELIGIBLE | |
| 2 | 2₹1.7 L+₹2,590 (1.56%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance FOUND ELIGIBLE | |
| 3 | 3₹1.7 L+₹7,800 (4.69%)Accepted-Finance BYPASS NH NEAR SBI SIDHRA JAMMU | 3 | Accepted-Finance FOUND ELIGIBLE |
Tender Value
₹1.9 L
EMD Value
₹3,800
Closing Date
6 Oct 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer MID Akhnoor/Nowshera
Office of the Executive Engineer MID Akhnoor/Nowshera
Restoration by strengthening of various electromechanical components with allied works at LIS Jogwan.
2020_IFC_105461_1
42/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
8 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Yes
Executive Engineer MID Akhnoor/Nowshera
₹3,800
Yes
Office of the Executive Engineer MID Akhnoor/Nowsh
9 Oct 2020
26 Sept 2020
7 Oct 2020
27 Sept 2020
6 Oct 2020
27 Sept 2020
29 Sept 2020
180 days
Cleaning of mud/silt from the pump room of L.I.S. Jogwan by way of engaging the manual labour and cleaning the pumps, sluice valves, reflux valves by way of removing silt, using abrasive material for cleaning, washing and drying the surface. Complete job includes cost of material involved and manual labour engaged etc.
Desilting / Strengthening of 300mm dia Suction lines and delivery lines installed at LIS Jogwan. The job involves disconnecting the suction pipes & extraction of suction pipes from the sump with the help of manual labour and allied tools and tackles and shifting to the stacking place. Desilting of choked pipes with the crow bars ,hammers, T/steels M.S round pieces by hammering the pipe one by one and cleaning by washing with water to make it completely silt free. Strengthening of suction and delivery pipes by welding at leaking portions along with the replacement of damaged flanges. Connecting of suction and delivery pipes by Providing / fitting of rubber flanges nuts and bolts etc. Thereafter lowering the suction pipes in sump and connecting suction lines and delivery lines upto the rising main . Complete job including the cost of material and labour charges for dismantling, extraction, lowering and fitting in the sump at the site of LIS including hire charges of tools and tackles and to and fro transportation. Complete job in all respects.
De-silting of 300mm dia foot valves of pumping unit no. 1 &2 at Jogwan by way of decoupling the foot valve by cutting/unfastening the nuts and bolts from suction lines . Extraction of foot valves out of river with help of manual labour. Dismantling of foot valve after unfastening/cutting the nuts & bolts. Cleaning of foot valve from mud and silt by washing with water . Repair by way of welding to damaged body and strainer of foot valve. Assembling the foot valve and P/F of new rubber packing sheet, nuts and bolts etc. Lowering the foot valve in the river & coupling with suction pipe by providing new rubber packing sheet, nuts bolts and washers. Checking for leakages. Priming the pump & testing/commissioning on full load. The job includes cost of material, labour, transportation etc as per site conditions of LIS Jogwan.
Restoration by Strengthening of 8 cusecs discharge 43 m head H.C. Pump no. 1 installed at LIS Jogwan by decoupling the pump from motor, suction and delivery lines by unfastening the foundation bolts. Dismantling the pump by removing the bearing cups, body brackets, top cover housings and gland brackets. Taking out rotating assembly and proper cleansing to remove silt / dust material. P/F of 2-No bushes & 2-No bearings as per sample . Assembling the pump using oil paper packing sheet at each joints, proper locking of bearings without play and greasing.. Then placing the pump on base frame and tightening the foundation bolts. Connecting the pump to suction and delivery lines replacing the worn out packing sheet nuts and bolts. Coupling the pump and motor after proper alignment/adjustment. Priming the pump and testing on full load. Job includes cost of material, tools and tackles, labour charges. Complete Job
Restoration by Strengthening of 8 cusecs discharge 43 m head H.C. Pump no. 2 installed at LIS Jogwan by decoupling the pump from motor, suction and delivery lines by unfastening the foundation bolts. Dismantling the pump by removing the bearing cups, body brackets, top cover housings and gland brackets. Taking out rotating assembly and proper cleansing to remove silt / dust material. P/F of 2-No bearings as per sample . Assembling the pump using oil paper packing sheet at each joints, proper locking of bearings without play and greasing.. Then placing the pump on base frame and tightening the foundation bolts. Connecting the pump to suction and delivery lines replacing the worn out packing sheet nuts and bolts. Coupling the pump and motor after proper alignment/adjustment. Priming the pump and testing on full load. Job includes cost of material, tools and tackles, labour charges. Complete Job
Restoration by Strengthening of the damaged/leaking sections of 400mm dia MS Rising Mains at 3 no. spots at the site of LIS Jogwan. The Job involves bush cutting around the site of repair and excavation of 3-No.trenches in order to fully expose circumferential surface of the damaged sections of the rising main and to facilitate trouble free execution of cutting, welding works. Job involves thorough cleaning of M.S pipe at leaking sections by using wire brush for smooth execution of work. Repairs to the damaged portions of the Rising main by way of welding of leaking sections in double layers from all around and providing / welding of M.S plate collar 6mm thick as overlap joint for strengthening. Welding with one root layer and two additional layers with 3.14 mm and 4mm I.S marked M.S welding electrodes to fill the grooves between the pipe and (overlap joint) collar, welding to be done by specialized skilled workman , handling with proper tools , tackles, employing semi-skilled workman and suitable tools /tackles. The weld should be spurt and gap free and to be done with good quality electrodes and slag material to be chipped off. Testing of rising mains for any leakages and thereafter complete filling and leveling /dressing of the pit. Complete job includes cost of material,hire charges of welding set and generator set, labour charges, manual handling, transportation charges and hiring charges of tools and tackles. Complete Job
Restoration by strengthening of 180 HP motor of pumping unit no. 1 installed at LIS Jogwan . The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Varnishing the rotor and stator with Dr. Beck compound or equivalent make of varnish in two coats, drying by hot air process. Thereafter checking the IR value using megger meter. Providing /Fitting of driving end bearing and non driving end bearing and greasing properly . Assembling of the motor . The job also includes cleaning of aluminium and copper cable by using PF solvent to make it moisture and silt free .Providing/fitting of thimbles as per sample which includes crimping . Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump testing of motor on full load. Complete job includes the cost of material, hiring charges of tools & tackles, transportation charges from and to the site of LIS. Also labour charges for skilled and semiskilled labour to be employed at site for execution of job including the out station charges etc. Complete job.
Restoration by strengthening of 180 HP motor of pumping unit no. 2 installed at LIS Jogwan . The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Varnishing the rotor and stator with Dr. Beck compound or equivalent make of varnish in two coats, drying by hot air process. Thereafter checking the IR value using megger meter. Providing /Fitting of driving end bearing and greasing properly . Assembling of the motor . The job also includes cleaning of aluminium and copper cable by using PF solvent to make it moisture and silt free .Providing/fitting of thimbles as per sample which includes crimping . Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump testing of motor on full load. Complete job includes the cost of material, hiring charges of tools & tackles, transportation charges from and to the site of LIS. Also labour charges for skilled and semiskilled labour to be employed at site for execution of job including the out station charges etc. Complete job.
Repairs to 180 HP starter of pumping unit no. 2 installed at LIS Jogwan. The job involves replacement of worn out G.M Nuts and washers, bakelite strips, fingers, contacts moving and fixed as per sample, Replacement of tripping coil of required capacity, complete kit.. Complete drainage of transformer oil, providing/Filling of fresh transformer oil of required quantity. Replacement of worn-out thimbles of cables etc. Connecting power supply and testing at load. Complete job with material cost and labour charges at the site of LIS.
PERFECT ELECTRICAL WORKS
G S ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .