Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.3 LAccepted-AOC NOT SPECIFIED | ₹35.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹36.3 LRejected-Finance NA | ₹36.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹38.1 LRejected-Finance | ₹38.1 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Completion Certificate enclosed is not as per Requirement |
Tender Value
₹36.3 L
EMD Value
₹73,000
Closing Date
12 May 2026, 5:00 pmClosed
Executive Engineer PMGSY Division Jammu
Executive Engineer PMGSY Division Jammu
Permanent Restoration of Purmandal to Sangar road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No.JK05-136, Block Samba, District Samba
2026_JKRRD_147459_1
e-NIT No.EE/PMGSY/J/06 of 2026-27 Dated.02.05.2026
Open Tender
Civil Works - Roads
30 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹73,000
Executive Engineer PMGSY Division Jammu
6 Jun 2026
4 May 2026
13 May 2026
4 May 2026
12 May 2026
4 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:
2.9.1 All kinds of soil : | 436.2 | Cum | 256.85 | ₹1,12,037.97 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 35.75 | Cum | 5,202.9 | ₹1,86,003.68 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 276.11 | Cum | 5,733.6 | ₹15,83,104.3 |
| 4 | Providing and laying damp-proof Course 50 mm thick with cement
concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate
20 mm nominal size) and curing complete | 132 | Sqm | 416.5 | ₹54,978 |
| 5 | Supply and packing of stone boulder in GI wire crates apron complete as per design and technical specifications and including cost of wire | 423.36 | Cum | 1,765.59 | ₹7,47,480.18 |
| 6 | Slip Clearance In soils; mixed with moorum/Kankar/shingle/boulders; disposal
lead upto 50 m and lift upto 1.5 m. | 268.65 | Cum | 331.15 | ₹88,963.45 |
| 7 | Back filling behind R/wall Abutment wing wall Return wall as per drawing & technical specification. (with 50%Dumping stone including cost of stones in Horizontal on level and 50%Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc complete) | 151.24 | Cum | 578.15 | ₹87,439.41 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 810 | Sqm | 286.35 | ₹2,31,943.5 |
| 9Carriage of Material by Mechanical Transport including loading & unloading stacking at site complete. | |||||
| 9.01 | Sand nominal size average lead 26 KM by MT. | 145.95 | Cum | 476.18 | ₹69,498.47 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_230012.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid