| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 UDYAM UP 43 0021665 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹3.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 LRejected-AOC | ₹4.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹4.2 LRejected-AOC 232 BANKALI BHABAN AMLAJORA KANKSA BARDHAMAN WEST BENGAL 713212 BARDHAMAN WEST BENGAL 713212 UDYAM WB 23 0001709 | PASCHIM BARDHAMAN | WEST BENGAL | 713212 | ₹4.2 L | L3 | Rejected-AOC L3 |
| 4 | L4₹4.3 LRejected-AOC | ₹4.3 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Krishna and Co L1 | M.VIJAYAKUMAR L4 | K.M.C AND Co L3 | ACM AND CO L2 |
|---|---|---|---|---|---|---|---|
| 1.00POTHOLE REPAIRS ROAD FROM OMALUR SANKARI ROAD TO MOTTAIYAN THERU MARIYAMMAN KOVIL ROAD KM 0/0-100 H/O M.CHETTYPATTY | |||||||
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq m | 123.75 | Sqm | 15 ₹1,856.25 | 24 ₹2,970 | 23.36 ₹2,890.80 | 23 ₹2,846.25 |
| 3.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 1.05 | Cum | 4,032.06 ₹4,233.66 | 4,100 ₹4,305 | 4,032.06 ₹4,233.66 | 4,030 ₹4,231.50 |
| 4.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 262.5 | Cum | 30 ₹7,875 | 35 ₹9,187.50 | 33.12 ₹8,694 | 33 ₹8,662.50 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 46.41 | Cum | 2,010 ₹93,284.10 | 2,750 ₹1.3 L | 2,669.31 ₹1.2 L | 2,669 ₹1.2 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 371.25 | sqm | 60 ₹22,275 | 85 ₹31,556.25 | 83.84 ₹31,125.60 | 83.4 ₹30,962.25 |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 371.25 | Cum | 15 ₹5,568.75 | 20 ₹7,425 | 19.22 ₹7,135.43 | 19.2 ₹7,128 |
| 8.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 15.84 | Cum | 11,291.47 ₹1.8 L | 11,300 ₹1.8 L | 11,291.47 ₹1.8 L | 11,290 ₹1.8 L |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 56,511 ₹56,511 | 65,171 ₹65,171 | 64,227 ₹64,227 | 64,176 ₹64,176 |
Tender Value
₹4.3 L
EMD Value
₹4,500
Closing Date
6 Nov 2025, 3:00 pmClosed
BDO (BP)
BDO Office Omalur
Salem District - Omalur Block - Omalur-sankari road to Mottaiyantherumariyammankovil road km 0/0-0/3 M.Chettipatty Panchayat - Rural Road Maintenance Scheme 2025-26 Pothole Repairs Package No. 05
2025_RDTN_618065_5
Roc.No.3564/2025/A2
Open Tender
Civil Works
90 days
BDO Office Omalur
As per tender document
2 documents required · 2 mandatory
₹0
₹4,500
29 Jan 2026
28 Oct 2025
6 Nov 2025
28 Oct 2025
6 Nov 2025
28 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_738754.xls
BOQ • 0.24 MB
05.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid