Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | -30.33% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹800.36 (0.47%)Admitted-Finance | -30.00% | ₹1.7 L+₹800.36 (0.47%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 L+₹37,180.22 (22.0%)Admitted-Finance | -15.00% | ₹2.1 L+₹37,180.22 (22.0%) | L3 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,840
Closing Date
3 Sept 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Protection work near the house of Harbans Lal and others Wno.2 and Construction of lane drain near the house of Bachan Singh and others Wno.2 Pyt Pargalta Block Nagrota, Block Level
2026_RDPR_322087_1
e-NIT No. 482 REWJ of 2026-27 dated 25-08-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹4,840
16 Sept 2026
25 Aug 2026
4 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m
in width as well as10 sqm on plan including disposal of excavated earth,
leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge.
All kinds of soil : | 44.61 | sqm | 91.75 | ₹4,092.97 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil | 12.04 | cum | 479.3 | ₹5,770.77 |
| 3 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 8.14 | cum | 4,826.5 | ₹39,287.71 |
| 4 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 18.77 | cum | 5,733.6 | ₹1,07,619.67 |
| 5 | supply and dumping of stone | 8.04 | cum | 937.6 | ₹7,538.3 |
| 6 | Providing and laying 60mm thick factory made cement concrete
interlocking paver block of M-30 grade made by block making machine
with strong vibratory compaction and of approved size and design/shape
laid in required colour and pattern over and including 50mm thick
compacted bed of fine sand, filling the joints with coarse sand etc. all
complete as per direction of Engineer-in-charge. | 44.61 | sqm | 816.5 | ₹36,424.07 |
| 7 | Centering and shuttering including strutting,propping etc and removal of form work | 45.72 | sqm | 286.35 | ₹13,091.92 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 29.28 | SQM | 628.95 | ₹18,415.66 |
| 9 | Sand 10km by MT at an avg distance | 12.84 | cum | 279.04 | ₹3,582.87 |
| 10 | agg 6km by MT at an avg distance | 25.26 | cum | 192.34 | ₹4,858.51 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1077561.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .