Tender Value
₹51 L
EMD Value
₹1.0 L
Closing Date
4 Aug 2026, 6:00 pm
CWE Shillong
HQ CWE Shillong, SE Falls, Shillong - 793011
SMART PERIODICAL SERVICES TO OTM AND MD ACCN IN AOR OF AGE B/R I UNDER GE NARANGI
2026_MES_777080_1
8045/NAR/E8
Open Tender
Civil Works
180 days
Narangi
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE Narangi
₹1.0 L
Yes
7 Jul 2026
7 Jul 2026
6 Aug 2026
7 Jul 2026
4 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster, any description, on brick or stone walls, etc.including racking out joints, hacking for key, scrubbing down with water, etc. including removal of rubbish material away from site, complete all as specified and as directed. | 1,010 | SQM | - | - |
| 2 | M&L for plastering 5 mm thick on fair faces of brick work or concrete surfaces on ceilings in cement mortar 1:3 finished even and smooth without using extra cement complete all as specified and as directed. | 200 | SQM | - | - |
| 3 | M&L for plastering 10 mm thick on fair faces of brick work or concrete surfaces (on vertical surfaces) in cement mortar 1:6 finished even and fair without using extra cement complete all as specified and as directed. | 450 | SQM | - | - |
| 4 | M&L for plastering 15 mm thick (in two layers of 10mm and 5mm thk) on fair faces of brick wall or concrete surfaces in cement mortar 1:4 with water proofing compound as per manufacturer's printed instruction finished even and fair complete all as specified and directed.
Note: Water proofing compound shall be measured and paid for separately. | 400 | SQM | - | - |
| 5 | Supply only water proofing compound complete all as specified and directed. | 147 | KG | - | - |
| 6 | M&L for preparation of newly plastered surfaces on ceilings and applying two coats of white wash complete all as specified and as directed. | 200 | SQM | - | - |
| 7 | M & L for preparation of newly plastered surface of wall and applying two coats of acrylic distemper over one coat of suitable primer with auto roller over 1 mm thick putty to match the surfaces complete all as specified and as directed. | 450 | SQM | - | - |
| 8 | M&L for preparation of new surfaces and applying two coats of 100% Premium acrylic emulsion paint having VOC less tham 50 gm/ltrs and UV resistance as per IS 15489:2004, alkali and fungal resistanxe dirt resistance exterior paint of required shade with silicon additives @1.43 ltrs/10sqm over and including priming coat of exterior primer applied @0.90 ltrs/10 sqm over 1.00mm thick exterior putty on new surfaces complete all as specified and directed. (a) Sanding of surface to be done by mechanical sander with 1500 - 2700 rpm, with internal dust extraction system for clean environment certified by paint manufacturer. Proper masking to be carried out before primer and paint application). (b) The work pertaining to periodical services & Water Proofing shall be executed by authorized applicator through manufacturer of which the materials i.e. Paint, Distemper, Putty etc. is proposed to be used by the contractor and approved by GE.
(c) The cost of scaffolding upto 10m height of building shall be included in the quoted rate.
(d) The contractor shall upload MOU letter with any one of manufacturer and also with their authorised applicator mentioned in the tender alongwith their bid in cover-I failing which his bid will be rejected. Authorised applicator shall have valid authorisation letter from the manufacturer (Minimum regional HQs) and shall have been issued not less than 30 days from the date of commencement of the work. The authorisation letter needs to be valid for the complete period of execution of the painting work.
(e) After preparation of the surface, Engr-in-Charge shall approve the same before applying primer and finishing coats.
(f) Building wise stage passing register shall be maintained and shall be signed by Engr-in-Charge and contractor.
(g) The equipments to be used in the work shall be certified by the manufacturer with whom the MOU been entered into.
(h) Contractor shall submit approved company generated 05 years warranty card at the time of submission of RAR & Final Bill. 15% amount of this item will be retained in FB for a period of 05 years from the certified date of completion.
(j) Masking of windows / doors during spray painting using polythene film is inluded in the quoted rates.
(k) Cleaning and clearing of site of painting, mats etc after completion of work is included in the quoted rate. | 300 | SQM | - | - |
| 9 | M&L for preparing of newly plastered wall surface and applying two coats of cement base paint with auto roller for making the surface uniform over a coat of alkali resistance primer including filling of holes and cracks with suitable material like putty or POP complete all as specified and as directed. | 100 | SQM | - | - |
| 10 | Complete removal of existing treatment on wall/ roof projections including facia, cornices etc by scrapping with mechanical sander (having mechanical vaccum mechanism) with sanding pad of appropriate grit to make surface clean, free from dust, loose paint etc by skilled labour complete all as specified and directed. | 12,500 | SQM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_870262.xls
BOQ • 0.31 MB
8045tender.pdf
Tender Documents • 0.85 MB
Download all tender documents and submit your bid