Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
13 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER TENKASI
BLOCK DEVELOPMENT OFFICE TENKASI
Construction of Waiting Shed,Cremation shed,CC Pavement and Compound wall Arrangement at AD Community Burial Ground in Subramaniyapuram in Kuthukalvalasai
2023_RDTN_323805_3
BDOBLK/64/2023-A3 DT 05062023
Open Tender
Civil Works
Item Rate
90 days
TENKASI
REFER TENDER NOTICE
2 documents required · 2 mandatory
₹0
₹16,000
Yes
13 Jun 2023
8 Jun 2023
13 Jun 2023
8 Jun 2023
13 Jun 2023
8 Jun 2023
Amount
1.Construction of Waiting Shed,Cremation shed,CC Pavement and Compound wall Arrangement at AD Community Burial Ground in Subramaniyapuram in Kuthukalvalasai Panchayat in Tenkasi Panchayat Union.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for corewall etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Filling in Basement with excavated earth in Layers not more than 15cm.Thick well rammed, watered and copacted complete complying with standard specifications.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 10cum
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Below Basement
Above Basement
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete for 10 cum
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Plastering with cement mortar 1:3 mix to 10 mm thick including Cost and Conveyance of all materials to site and all labour charges etc complete for 10 sqm.
Plastering with cement mortar 1:5 mix to 12 mm thick including Cost and Conveyance of all materials to site and all labour charges etc complete for 10 sqm.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Collection and supply of Red gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sheikushman abdul Razeeth
stage.html
html • 0.02 MB
finance_385018.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .