Tender Value
₹9.8 L
EMD Value
₹25,000
Closing Date
17 Oct 2024, 3:15 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer Ele
Electrical Sub Divisio, Andrott Island, U T of Lakshadweep
Various type of Electrical works in Distribution line (HT/LT) and consumer related under Electricity Department Andrott Lakshadweep
2024_UTL_2757_1
F.No.9/1/2021/AEA Dated 26.09.2024
Open Tender
Electrical Works
Item Rate
320 days
Andrott
Valid licenced contractors Supervisor Grade A
3 documents required · 3 mandatory
₹0
₹25,000
Yes
18 Oct 2024
27 Sept 2024
18 Oct 2024
27 Sept 2024
17 Oct 2024
28 Sept 2024
27 Sept 2024 - 17 Oct 2024
Amount
Providing New Service connections (Over Head line): Fixing Suitable cutout fuse, Fixing Energy Meter, Providing service line, providing line connections, etc. Over head Service lines should be clipped to the stay wire using proper cable tie. Service wire with stay wire tied at proper height and tight. (The distance between post and consumer meter point is up to 30 Mtrs length/ Above 30 Mtrs length).
Single Phase Connection (Up to 30 Mtrs distance)
Three Phase Connection (Up to 30 Mtrs distance)
Single Phase Connection (Above 30 Mtrs distance)
Three Phase Connection (Above 30 Mtrs distance)
Providing New Service connections (UG Cables): Fixing and clipping the UG cable to the wall with proper cable clip, Fixing Suitable cutout fuse, Fixing Energy Meter, Providing line connections, etc (Excluding cable laying works)
Single Phase Connection
Three Phase Connection
UG Cable Joining HT, 11 KV lines: Cutting cables, Removing insulations, semi conductors, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour.
HT Cable 95 Sq mm (Cable jointing Straight through joint.)
HT Cable 95 Sq mm (End Termination)
UG Cable Joining LT 440V lines: Cutting cables, Removing insulations, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour.
LT Cables 3 Phase (95, 120 & 160 Sq mm) Cable jointing Straight through joint / Tee joint.
LT Cables 3 Phase ( 70, 50 Sqmm) Cable jointing Straight through joint / Tee joint.
LT Cable 3 Phase( 10, 16,25 & 35 Sqmm) Cable jointing Straight through joint / Tee joint.
LT Single phase Cables
LT End Termination works through break out (95, 120 & 160 Sq mm)
LT End Termination works through break out ( 70, 50 Sqmm)
LT End Termination works through break out ( 10, 16,25 & 35 Sqmm)
Maintenances of Electrical Service connections-
Refurbishment of service connections on the Post/Boxes/Consumer end, etc
Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post within 30 Mtrs length)
Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post above 30 Mtrs length)
Replacing cut out fuse units with new one
Replacing defective Energy Meter with new one
Sealing Energy Meter with proper Polycarbon / suitable seal
Replacing HRC fuse unit (including base) necessary cutting,drilling,taiting with Bolt and nuts,socket and Cable tying (100 A to 400A)
Replacing Forcelain fuse unit (including base) necessary cutting,drilling,taiting with Bolt and nuts,socket and Cable tying (100 A to 400A)
Installation/Replacement of Street light sets including transportation, connection, etc
TRANARK TECHNOLOGIES (BID ID -9985)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .